메뉴 건너뛰기




Volumn , Issue , 2007, Pages 591-598

An alert management system for concrete batching plant

Author keywords

[No Author keywords available]

Indexed keywords

ALERT MANAGEMENT SYSTEMS; BUSINESS SUCCESSES; CONCRETE BATCHING PLANTS; DATA INTEGRATIONS; EFFECTIVE MANAGEMENTS; EXCEPTION HANDLINGS; PROCESS MANAGEMENTS; PRODUCTION PROCESSES; PRODUCTION SCHEDULING; WORKFLOW INTEGRATIONS; WORKFLOW MANAGEMENTS;

EID: 47849102252     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/EFTA.2007.4416822     Document Type: Conference Paper
Times cited : (4)

References (17)
  • 1
    • 84890795728 scopus 로고    scopus 로고
    • International Medical Informatics Association IMIA
    • International Medical Informatics Association (IMIA): www.imia.org
  • 2
  • 3
    • 0033115129 scopus 로고    scopus 로고
    • A Meta Modeling Approach for Workflow Management System Supporting Exception Handling
    • D.K.W. Chiu, Q. Li, and K. Karlapalem, "A Meta Modeling Approach for Workflow Management System Supporting Exception Handling," Information Systems, 24(2): 159-184, 1999.
    • (1999) Information Systems , vol.24 , Issue.2 , pp. 159-184
    • Chiu, D.K.W.1    Li, Q.2    Karlapalem, K.3
  • 5
    • 0035308069 scopus 로고    scopus 로고
    • Web Interface-Driven Cooperative Exception Handling in ADOME Workflow Management System
    • D.K.W. Chiu, Q. Li, and K. Karlapalem, "Web Interface-Driven Cooperative Exception Handling in ADOME Workflow Management System," Information Systems, 26(2):93-120, 2001.
    • (2001) Information Systems , vol.26 , Issue.2 , pp. 93-120
    • Chiu, D.K.W.1    Li, Q.2    Karlapalem, K.3
  • 7
    • 17044385067 scopus 로고    scopus 로고
    • Scheduling the Truckmixer Arrival for a Ready Mixed Concrete Pour via Simulation with Risk
    • Hong Kong Institute of Building HKIOB, Sept
    • S.Q. Wang, C.L. Teo and G. Ofori, "Scheduling the Truckmixer Arrival for a Ready Mixed Concrete Pour via Simulation with Risk", Journal of Construction Research, Hong Kong Institute of Building (HKIOB), Vol. 2, No. 2. pp. 169-179, Sept 2001
    • (2001) Journal of Construction Research , vol.2 , Issue.2 , pp. 169-179
    • Wang, S.Q.1    Teo, C.L.2    Ofori, G.3
  • 8
    • 33846690218 scopus 로고    scopus 로고
    • Ming Lu. Hoi-Ching Lam, Optimized Concrete Delivery Scheduling Using Combined Simulation and Genetic Algorithms, Proceedings of the 2005 Winter Simulation Conference
    • Ming Lu. Hoi-Ching Lam, "Optimized Concrete Delivery Scheduling Using Combined Simulation and Genetic Algorithms", Proceedings of the 2005 Winter Simulation Conference
  • 9
    • 18844412156 scopus 로고    scopus 로고
    • Low Sui Pheng and Wu Min, Just-in-time management in the ready mixed concrete industries of Chongqing, China and Singapore, Construction Management & Economic, 2005, 23, issue 8, pages 815-829.
    • Low Sui Pheng and Wu Min, "Just-in-time management in the ready mixed concrete industries of Chongqing, China and Singapore", Construction Management & Economic, 2005, vol. 23, issue 8, pages 815-829.
  • 10
    • 84890796565 scopus 로고    scopus 로고
    • General Specification for Civil Engineering Works 2, 1992 Edition (Eighth reprint, 10/2002), Hong Kong Government
    • "General Specification for Civil Engineering Works Volume 2", 1992 Edition (Eighth reprint, 10/2002), Hong Kong Government
  • 14
    • 84890803373 scopus 로고    scopus 로고
    • Memorandum for the Building Committee No, Housing Authority
    • Memorandum for the Building Committee No. BC 35/99, The Hong Kong Housing Authority.
    • BC 35/99, The Hong Kong
  • 15
    • 84890788762 scopus 로고    scopus 로고
    • Hanson Australia, Material Replenishment Program
    • Hanson Australia, "Material Replenishment Program"


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.