메뉴 건너뛰기




Volumn 15, Issue 5, 2004, Pages 433-446

Engineering management: Operational design coordination

Author keywords

[No Author keywords available]

Indexed keywords

ENGINEERING MANAGEMENTS; OPERATIONAL DESIGN; QUALITY PRODUCTS; RESOURCE MANAGEMENT;

EID: 4744354538     PISSN: 09544828     EISSN: None     Source Type: Journal    
DOI: 10.1080/09544820410001697145     Document Type: Article
Times cited : (40)

References (80)
  • 16
  • 20
    • 0001860486 scopus 로고
    • Coordination assistance for mixed human and computational agent systems
    • University of Massachusetts, Amherst, MA, USA
    • Decker, K., and Lesser, V.R., 1995, Coordination assistance for mixed human and computational agent systems., UMass Computer Science Technical Report, University of Massachusetts, Amherst, MA, USA, 95-31.
    • (1995) UMass Computer Science Technical Report , pp. 95-131
    • Decker, K.1    Lesser, V.R.2
  • 31
    • 0013053195 scopus 로고    scopus 로고
    • International Thomson Business Press, Milton Keynes
    • Field, M., and Keller, L., 1998, Project Management (International Thomson Business Press, Milton Keynes).
    • (1998) Project Management
    • Field, M.1    Keller, L.2
  • 32
    • 0029214667 scopus 로고
    • Multiagent coordination and cooperation in a distributed dynamic environment with limited resources
    • Findler, N.V. and Elder, G.D., 1995, Multiagent coordination and cooperation in a distributed dynamic environment with limited resources. Artificial Intelligence in Engineering, 9, 229-238.
    • (1995) Artificial Intelligence in Engineering , vol.9 , pp. 229-238
    • Findler, N.V.1    Elder, G.D.2
  • 38
    • 0028543214 scopus 로고
    • Effects of concurrent engineering on make-to-order products
    • Handfield, R.B., 1994, Effects of concurrent engineering on make-to-order products. IEEE Transactions on Engineering Management, 41, 384-393.
    • (1994) IEEE Transactions on Engineering Management , vol.41 , pp. 384-393
    • Handfield, R.B.1
  • 39
    • 4043084254 scopus 로고
    • Computer integration: A co-requirement for efficient organizational coordination
    • edited by K.R. von Barisani, P.A. MacConaill and K. Tierney (IOS Press, Amsterdam)
    • Hansen, P.H.K., 1995, Computer integration: a co-requirement for efficient organizational coordination. In Opening Productive Partnerships, edited by K.R. von Barisani, P.A. MacConaill and K. Tierney (IOS Press, Amsterdam).
    • (1995) Opening Productive Partnerships
    • Hansen, P.H.K.1
  • 44
    • 0033099760 scopus 로고    scopus 로고
    • An actor-based architecture for customizing and controlling agent ensembles
    • Jamali, N., Thati, P., and Agha, G.U., 1999, An actor-based architecture for customizing and controlling agent ensembles. IEEE Intelligent Systems, 14, 38-44.
    • (1999) IEEE Intelligent Systems , vol.14 , pp. 38-44
    • Jamali, N.1    Thati, P.2    Agha, G.U.3
  • 45
    • 84974223844 scopus 로고
    • Commitments and conventions: The foundation of coordination in multi-agent systems
    • Jennings, N.R., 1993, Commitments and conventions: the foundation of coordination in multi-agent systems. The Knowledge Engineering Review, 8(3), 223-250.
    • (1993) The Knowledge Engineering Review , vol.8 , Issue.3 , pp. 223-250
    • Jennings, N.R.1
  • 46
    • 0001873493 scopus 로고    scopus 로고
    • Coordination techniques for distributed artificial intelligence
    • edited by G.M.P. O'Hare and N.R. Jennings (Wiley, New York, NY)
    • Jennings, N.R., 1996, Coordination techniques for distributed artificial intelligence. In Foundations of Distributed Artificial Intelligence, edited by G.M.P. O'Hare and N.R. Jennings (Wiley, New York, NY), pp. 187-210.
    • (1996) Foundations of Distributed Artificial Intelligence , pp. 187-210
    • Jennings, N.R.1
  • 47
    • 0006447069 scopus 로고    scopus 로고
    • A network status predictor to support dynamic scheduling in network-based computing systems
    • High-Performance Parallel Computing Research Group, University of Minnesota, MN
    • Kim, J., and Lilja, D.J., 1998, A network status predictor to support dynamic scheduling in network-based computing systems. Technical Report No. HPPC-98-11, High-Performance Parallel Computing Research Group, University of Minnesota, MN.
    • (1998) Technical Report No. HPPC-98-11 , vol.HPPC-98-11
    • Kim, J.1    Lilja, D.J.2
  • 49
    • 0000584704 scopus 로고
    • Concurrent engineering: Decomposition and scheduling of design activities
    • Kusiak, A., and Park, K., 1990, Concurrent engineering: decomposition and scheduling of design activities. International Journal of Production Research, 28, 1883-1900.
    • (1990) International Journal of Production Research , vol.28 , pp. 1883-1900
    • Kusiak, A.1    Park, K.2
  • 50
    • 0032343515 scopus 로고    scopus 로고
    • Reflections on the nature of multi-agent coordination and its implications for an agent architecture
    • Lesser, V.R., 1998, Reflections on the nature of multi-agent coordination and its implications for an agent architecture. Autonomous Agents and Multi-Agent Systems, 1, 89-111.
    • (1998) Autonomous Agents and Multi-agent Systems , vol.1 , pp. 89-111
    • Lesser, V.R.1
  • 53
    • 38249014252 scopus 로고
    • An opportunistic software architecture for support of design coordination
    • MacCallum, K.J., and Carter, I.M., 1991, An opportunistic software architecture for support of design coordination. Knowledge Based Systems Journal, 5, 55-65.
    • (1991) Knowledge Based Systems Journal , vol.5 , pp. 55-65
    • MacCallum, K.J.1    Carter, I.M.2
  • 54
    • 0023439933 scopus 로고
    • Modeling coordination in organisations and markets
    • Malone, T.W., 1987, Modeling coordination in organisations and markets. Management Science, 33, 1317-1332.
    • (1987) Management Science , vol.33 , pp. 1317-1332
    • Malone, T.W.1
  • 55
    • 0028401441 scopus 로고
    • The interdisciplinary study of coordination
    • Malone, T.W. and Crowston, K., 1994, The interdisciplinary study of coordination. ACM Computing Surveys, 26, 87-119.
    • (1994) ACM Computing Surveys , vol.26 , pp. 87-119
    • Malone, T.W.1    Crowston, K.2
  • 56
    • 0008809915 scopus 로고
    • Managing the integration problem in concurrent engineering
    • M.I.T. Sloan School of Management, Cambridge, MA
    • McCord, F.P., and Eppinger, S.D., 1993, Managing the integration problem in concurrent engineering. Working Paper 3594-93-MSA, M.I.T. Sloan School of Management, Cambridge, MA.
    • (1993) Working Paper 3594-93-MSA
    • McCord, F.P.1    Eppinger, S.D.2
  • 58
    • 84955586572 scopus 로고    scopus 로고
    • Using runtime measured workload characteristics in parallel processor scheduling
    • edited by D.G. Feitelson and L. Rudolph (Springer-Verlag, Berlin)
    • Nguyen, T.D., Vaswani, R., and Zahorjan, J., 1996, Using runtime measured workload characteristics in parallel processor scheduling. In Job Scheduling Strategies for Parallel Processing, edited by D.G. Feitelson and L. Rudolph (Springer-Verlag, Berlin), pp. 155-174.
    • (1996) Job Scheduling Strategies for Parallel Processing , pp. 155-174
    • Nguyen, T.D.1    Vaswani, R.2    Zahorjan, J.3
  • 62
    • 4043114276 scopus 로고    scopus 로고
    • Institutional and organizational prerequisites to develop cooperation in the activities of design
    • Tampere, Finland, 19-21 August
    • Perrin, J., 1997, Institutional and organizational prerequisites to develop cooperation in the activities of design. Proceedings of the 11th International Conference on Engineering Design, vol. 1, Tampere, Finland, 19-21 August, pp. 87-92.
    • (1997) Proceedings of the 11th International Conference on Engineering Design , vol.1 , pp. 87-92
    • Perrin, J.1
  • 63
    • 0032025399 scopus 로고    scopus 로고
    • Distributed workflow management: The TEAM model
    • Hewlett-Packard Laboratories, Bristol
    • Piccinelli, G., 1998, Distributed workflow management: the TEAM model. Hewlett-Packard Laboratories Technical Report No. 98-56, Hewlett-Packard Laboratories, Bristol, pp. 1-17.
    • (1998) Hewlett-Packard Laboratories Technical Report No. 98-56 , vol.98 , Issue.56 , pp. 1-17
    • Piccinelli, G.1
  • 69
    • 0019180974 scopus 로고
    • The contract net protocol: High-level communication and control in a distributed problem solver
    • Smith, R.G., 1980, The contract net protocol: high-level communication and control in a distributed problem solver. IEEE Transactions on Computers, C-29, 1104-1113.
    • (1980) IEEE Transactions on Computers , vol.C-29 , pp. 1104-1113
    • Smith, R.G.1
  • 71
    • 0019597497 scopus 로고
    • The design structure system: A method for managing the design of complex systems
    • Steward, D.V., 1981, The design structure system: a method for managing the design of complex systems. IEEE Transactions on Engineering Management, EM-28, 71-74.
    • (1981) IEEE Transactions on Engineering Management , vol.EM-28 , pp. 71-74
    • Steward, D.V.1
  • 75
    • 0004237161 scopus 로고    scopus 로고
    • Addison Wesley Longman, Reading, MA, USA
    • Voland, G., 1999, Engineering by Design (Addison Wesley Longman, Reading, MA, USA).
    • (1999) Engineering by Design
    • Voland, G.1
  • 78
    • 0003227484 scopus 로고
    • The role of concurrent engineering in weapon systems acquisition
    • Institute of Defence Analysis, Alexandria, VA, USA
    • Winner, R.I., Pennell, J.P., Bertrand, H.E. and Slusarczuk, M.M.G., 1988, The role of concurrent engineering in weapon systems acquisition. IDA Report R-338, Institute of Defence Analysis, Alexandria, VA, USA.
    • (1988) IDA Report , vol.R-338
    • Winner, R.I.1    Pennell, J.P.2    Bertrand, H.E.3    Slusarczuk, M.M.G.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.