메뉴 건너뛰기




Volumn , Issue , 2007, Pages 110-117

Shared data analysis for multi-tasking real-time system testing

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER PROGRAMMING LANGUAGES; EMBEDDED SYSTEMS; INTEGRATED CIRCUITS; LEAD; MULTITASKING; REAL TIME SYSTEMS; STATISTICAL METHODS; WORD PROCESSING;

EID: 46749139562     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/SIES.2007.4297324     Document Type: Conference Paper
Times cited : (3)

References (17)
  • 2
    • 0020749255 scopus 로고
    • A Data Flow Oriented Program Testing Strategy
    • May
    • J. Laski and B. Korel, "A Data Flow Oriented Program Testing Strategy," in IEEE Transactions on Software Engineering, vol. 9(5), May 1983, pp. 347-354.
    • (1983) IEEE Transactions on Software Engineering , vol.9 , Issue.5 , pp. 347-354
    • Laski, J.1    Korel, B.2
  • 4
    • 0005257219 scopus 로고    scopus 로고
    • Systematic testing of multithreaded java programs,
    • Master's thesis, MIT, May
    • Bruening, "Systematic testing of multithreaded java programs," Master's thesis, MIT, May 1999.
    • (1999)
    • Bruening1
  • 5
    • 0026116649 scopus 로고
    • Replay and testing for concurrent programs
    • R. H. Carver and K.-C. Tai, "Replay and testing for concurrent programs," in IEEE Software, vol. 8(2), 1991, pp. 66-74.
    • (1991) IEEE Software , vol.8 , Issue.2 , pp. 66-74
    • Carver, R.H.1    Tai, K.-C.2
  • 8
    • 0026118563 scopus 로고
    • Stack-based scheduling of real-time processes
    • T. Baker, "Stack-based scheduling of real-time processes," in Real-Time Systems Journal, vol. 3(1), 1991, pp. 67-99.
    • (1991) Real-Time Systems Journal , vol.3 , Issue.1 , pp. 67-99
    • Baker, T.1
  • 10
    • 46749108045 scopus 로고    scopus 로고
    • IEEE Standard Glossary of Software :Engineering Terminology, IEEE Standards Collection, IEEE Std 610.12-1990, September 1990.
    • IEEE Standard Glossary of Software :Engineering Terminology, "IEEE Standards Collection, IEEE Std 610.12-1990," September 1990.
  • 12
    • 46749128920 scopus 로고    scopus 로고
    • Bound-T WCET tool and Tidorum company, WWW homepage
    • Bound-T WCET tool and Tidorum company, "URL: http://www.tidorum.fi, " 2007, WWW homepage.
    • (2007) URL: http://www.tidorum.fi
  • 13
    • 46749152184 scopus 로고    scopus 로고
    • Absint Angewandte Informatik GmbH company, WWW homepage
    • Absint Angewandte Informatik GmbH company, "URL: http://www.absint.com/," 2007, WWW homepage.
    • (2007) URL: http://www.absint.com
  • 14
    • 0029267687 scopus 로고    scopus 로고
    • N. C. Audsley, A. Burns, R. I. Davis, and K. W. Tindell, Fixed priority pre-emptive scheduling: A historical perspective, in Real-Time Systems journal, 8(2/3). Kluwer A.P., March/May 1995.
    • N. C. Audsley, A. Burns, R. I. Davis, and K. W. Tindell, "Fixed priority pre-emptive scheduling: A historical perspective," in Real-Time Systems journal, vol. 8(2/3). Kluwer A.P., March/May 1995.
  • 16
    • 46749104078 scopus 로고    scopus 로고
    • Honing the Detection of Interference and Ready Dependence for Slicing Concurrent Java Programs
    • Technical Report,SAnToS -TR2003-6, Tech. Rep
    • V. P. Ranganath and J. Hatcliff, "Honing the Detection of Interference and Ready Dependence for Slicing Concurrent Java Programs," Technical Report,SAnToS -TR2003-6, Tech. Rep., 2003.
    • (2003)
    • Ranganath, V.P.1    Hatcliff, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.