Volumn 23, Issue 6, 2008, Pages 700-710
|
Correlation of tunnel convergence with TBM operational parameters and chip size in the Ghomroud tunnel, Iran
|
Author keywords
Double shield TBM; Excavation; Rock mass characterization; Tunnel boring machine; Tunnel convergence; Tunneling
|
Indexed keywords
ARCHITECTURAL DESIGN;
BORING MACHINES (MACHINE TOOLS);
EARTH BORING MACHINES;
EXCAVATION;
MACHINE DESIGN;
MATERIALS SCIENCE;
OFFSHORE OIL WELL PRODUCTION;
ROCK MECHANICS;
ROCKS;
TUNNELING MACHINES;
(+ MOD 2N) OPERATION;
(U ,V) OPERATOR;
CASE STUDIES;
CHIP SIZES;
COLLAPSE (DRYING);
CONVERGENCE (MATHEMATICS);
ELSEVIER (CO);
FIELD OBSERVATIONS;
GEOLOGICAL CONDITIONS;
GROUND CONDITIONS;
IN SITU STRESSES;
INTEGRAL PART;
MACHINE SELECTION;
MAIN FACTORS;
OPERATIONAL PARAMETERS;
OVER EXCAVATION;
P OTENTIAL PROBLEMS;
PERFORMANCE PREDICTIONS;
PRECAUTIONARY MEASURES;
PRELIMINARY ANALYSIS;
RATE OF PENETRATION (ROP);
ROCK FRAGMENTS;
ROCK MASS CHARACTERISTICS;
ROCK MASS PARAMETERS;
ROCK MASS PROPERTIES;
ROCK TUNNELS;
TUNNEL BORING MACHINE (TBM);
TUNNEL PROJECTS;
TUNNEL WALL;
UNDER CONSTRUCTION;
WATER CONVEYANCES;
TUNNELS;
COLLAPSE;
CORRELATION;
EXCAVATION;
GROUND CONDITIONS;
MONITORING;
ROCK MASS CLASSIFICATION;
TBM;
TORQUE;
TUNNEL;
TUNNELING;
ASIA;
EURASIA;
IRAN;
MIDDLE EAST;
|
EID: 46449112089
PISSN: 08867798
EISSN: None
Source Type: Journal
DOI: 10.1016/j.tust.2008.01.005 Document Type: Article |
Times cited : (79)
|
References (8)
|