메뉴 건너뛰기




Volumn , Issue , 2006, Pages 1785-1795

Simulation assisted optimization and real-time control aspects of flexible production systems subject to disturbances

Author keywords

[No Author keywords available]

Indexed keywords

CONTROL SYSTEMS; MATERIALS HANDLING; MATERIALS HANDLING EQUIPMENT; PRODUCTION ENGINEERING; REAL TIME CONTROL; REAL TIME SYSTEMS; SCHEDULING; SYSTEM STABILITY;

EID: 46149124813     PISSN: 08917736     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/WSC.2006.322956     Document Type: Conference Paper
Times cited : (10)

References (12)
  • 1
    • 0026417688 scopus 로고
    • Branch and Bound algorithm for the flow shop with multiple processors
    • Brah, S. A. and J. L. Hunsucker. 1991. Branch and Bound algorithm for the flow shop with multiple processors, European Journal of Operational Research, Vol. 51, pp- 88-99.
    • (1991) European Journal of Operational Research , vol.51 , pp. 88-99
    • Brah, S.A.1    Hunsucker, J.L.2
  • 2
    • 0346485830 scopus 로고    scopus 로고
    • A shifting bottleneck procedure for a parallel machine flow shop scheduling problem
    • Cheng, J., Y. Karuno, and H. Kise. 2001. A shifting bottleneck procedure for a parallel machine flow shop scheduling problem. Journal of Operations Research, Society of Japan, 29, No. 2, pp. 140-156.
    • (2001) Journal of Operations Research, Society of Japan , vol.29 , Issue.2 , pp. 140-156
    • Cheng, J.1    Karuno, Y.2    Kise, H.3
  • 3
    • 1642559542 scopus 로고    scopus 로고
    • Chong, C. S., A. I. Sivakumar, and R. Gay. 2003. Simulation-based scheduling for dynamic discrete production. In Proceedings of the 2003 Winter Simulation Conference, ed. S. Chick, P. J. Sanchez, D. Ferrin, and D. J. Morrice, 1465 - 1473. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
    • Chong, C. S., A. I. Sivakumar, and R. Gay. 2003. Simulation-based scheduling for dynamic discrete production. In Proceedings of the 2003 Winter Simulation Conference, ed. S. Chick, P. J. Sanchez, D. Ferrin, and D. J. Morrice, 1465 - 1473. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
  • 5
    • 0033704095 scopus 로고    scopus 로고
    • Minimizing makespan subject to minimum total flow time on identical parallel machines
    • Gupta, J. N. D., and A. J. Ruiz-Torres. 2000. Minimizing makespan subject to minimum total flow time on identical parallel machines, European Journal of Operational Research, Vol. 125, No.5, pp.616-625.
    • (2000) European Journal of Operational Research , vol.125 , Issue.5 , pp. 616-625
    • Gupta, J.N.D.1    Ruiz-Torres, A.J.2
  • 7
    • 0031360240 scopus 로고    scopus 로고
    • Harmonosky, C. M., R. H. Farr, and M. C. Ni. 1997. Selective rerouting using simulated steady state system data. In Proceedings of the 1997 Winter Simulation Conference, ed. S. Andradottir, K. J. Healy, D. H. Withers, and B. L. Nelson, 1293 - 1298. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
    • Harmonosky, C. M., R. H. Farr, and M. C. Ni. 1997. Selective rerouting using simulated steady state system data. In Proceedings of the 1997 Winter Simulation Conference, ed. S. Andradottir, K. J. Healy, D. H. Withers, and B. L. Nelson, 1293 - 1298. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
  • 8
    • 0028452692 scopus 로고
    • A gametheoretic control approach for job shops in the presence of disruptions
    • Leon, V. J., S. D. Wu, and R. H. Storer. 1994. A gametheoretic control approach for job shops in the presence of disruptions. International journal of production research 32: 1451-1476.
    • (1994) International journal of production research , vol.32 , pp. 1451-1476
    • Leon, V.J.1    Wu, S.D.2    Storer, R.H.3
  • 9
    • 0028499648 scopus 로고
    • Robustness measures and robust scheduling for job shops
    • Leon, V. J., S. D. Wu, and R. H. Storer. 1993. Robustness measures and robust scheduling for job shops. IIE Transactions 26, 32-43.
    • (1993) IIE Transactions , vol.26 , pp. 32-43
    • Leon, V.J.1    Wu, S.D.2    Storer, R.H.3
  • 10
    • 46149095707 scopus 로고    scopus 로고
    • Development of a new heuristic for scheduling flow-shops with parallel machines by prioritizing bottleneck stages
    • Phadniis, S., and S. Irani. 2003. Development of a new heuristic for scheduling flow-shops with parallel machines by prioritizing bottleneck stages. Transactions of the SDPS, Vol. 7, No. 1, pp 87-97.
    • (2003) Transactions of the SDPS , vol.7 , Issue.1 , pp. 87-97
    • Phadniis, S.1    Irani, S.2
  • 11
    • 0024731596 scopus 로고
    • An application of discrete-event simulation to on-line control and scheduling of flexible manufacturing
    • Wu, S. D., and R. A. Wysk. 1989. An application of discrete-event simulation to on-line control and scheduling of flexible manufacturing. International Journal of Production Research, Vol. 27 (9).
    • (1989) International Journal of Production Research , vol.27 , Issue.9
    • Wu, S.D.1    Wysk, R.A.2
  • 12
    • 0000927907 scopus 로고    scopus 로고
    • A graph-theoretic decomposition of job shop scheduling problems to achieve scheduling robustness
    • Wu, S. D., E. Byeon, and R. H. Storer. 1999. A graph-theoretic decomposition of job shop scheduling problems to achieve scheduling robustness. Operations Research, Vol. 47, pp. 113-124.
    • (1999) Operations Research , vol.47 , pp. 113-124
    • Wu, S.D.1    Byeon, E.2    Storer, R.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.