-
2
-
-
84938002163
-
The adaptive reliability control system
-
May
-
T.E. Dy Liacco, "The adaptive reliability control system", IEEE Trans. on PAS, Vol. PAS-86, No. 5, pp. 517-531, May 1967.
-
(1967)
IEEE Trans. on PAS
, vol.PAS-86
, Issue.5
, pp. 517-531
-
-
Liacco, T.E.D.1
-
3
-
-
0017943762
-
Operating under stress and strain
-
Mar
-
L.H. Fink and K. Carlsen, "Operating under stress and strain", IEEE Spectrum, pp. 48-53, Mar. 1978.
-
(1978)
IEEE Spectrum
, pp. 48-53
-
-
Fink, L.H.1
Carlsen, K.2
-
4
-
-
0026820887
-
A security based approach to composite power system reliability evaluation
-
Feb
-
R. Billinton and E. Khan "A security based approach to composite power system reliability evaluation", IEEE Trans. on Power Systems, Vol. 7, No. 1, pp. 65-72, Feb. 1992.
-
(1992)
IEEE Trans. on Power Systems
, vol.7
, Issue.1
, pp. 65-72
-
-
Billinton, R.1
Khan, E.2
-
5
-
-
0028428839
-
Composite power system health analysis using a security constrained adequacy evaluation procedure
-
May
-
R. Billinton and G. Lian, "Composite power system health analysis using a security constrained adequacy evaluation procedure", IEEE Trans. on Power Systems, Vol. 9, No. 2, pp. 936-941, May 1994.
-
(1994)
IEEE Trans. on Power Systems
, vol.9
, Issue.2
, pp. 936-941
-
-
Billinton, R.1
Lian, G.2
-
6
-
-
0028480974
-
A basic framework for generating system operating health analysis
-
Aug
-
R. Billinton and M. Fotuhi-Firuzabad, "A basic framework for generating system operating health analysis", IEEE Trans. on Power Systems, Vol.9, No. 3, pp. 1610-1617, Aug. 1994.
-
(1994)
IEEE Trans. on Power Systems
, vol.9
, Issue.3
, pp. 1610-1617
-
-
Billinton, R.1
Fotuhi-Firuzabad, M.2
-
7
-
-
0032592924
-
Application of Monte Carlo simulation to generating system well-being analysis
-
Aug
-
R. Billinton and R. Karki, "Application of Monte Carlo simulation to generating system well-being analysis", IEEE Trans. on Power Systems, Vol. 14, No. 3, pp. 1172-1177, Aug. 1999.
-
(1999)
IEEE Trans. on Power Systems
, vol.14
, Issue.3
, pp. 1172-1177
-
-
Billinton, R.1
Karki, R.2
-
8
-
-
85056017510
-
Application of Monte Carlo simulation to generating system well-being analysis considering renewable sources
-
A.M. Leite da Silva, L.A.F. Manso, W.S. Sales, L.C. Resende, M.J.Q. Aguiar, M. Matos, J.A. Peças Lopes, V. Miranda, "Application of Monte Carlo simulation to generating system well-being analysis considering renewable sources", Proceedings of the 8th PMAPS'2004 -Probabilistic Methods Applied to Power Systems, Ames, USA, 12-16/Sept./2004.
-
Proceedings of the 8th PMAPS'2004 -Probabilistic Methods Applied to Power Systems, Ames, USA, 12-16/Sept./2004
-
-
Leite da Silva, A.M.1
Manso, L.A.F.2
Sales, W.S.3
Resende, L.C.4
Aguiar, M.J.Q.5
Matos, M.6
Peças Lopes, J.A.7
Miranda, V.8
-
9
-
-
0038580410
-
Well-being framework for composite Generation and transmission system reliability evaluation
-
Sep
-
L. Goel and C. Feng, "Well-being framework for composite Generation and transmission system reliability evaluation", IEE Proc.-Gener. Trans. Distrib., Vol. 146, No. 5, pp. 528-534, Sep. 1999.
-
(1999)
IEE Proc.-Gener. Trans. Distrib
, vol.146
, Issue.5
, pp. 528-534
-
-
Goel, L.1
Feng, C.2
-
10
-
-
9244223597
-
Well-being analysis for composite generation and transmission systems
-
Nov
-
A.M. Leite da Silva, L.C. Resende, L.A.F. Manso, R. Billinton, "Well-being analysis for composite generation and transmission systems", IEEE Trans. on PWRS, Vol. 19, No. 4, pp. 1763-1770, Nov, 2004.
-
(2004)
IEEE Trans. on PWRS
, vol.19
, Issue.4
, pp. 1763-1770
-
-
Leite da Silva, A.M.1
Resende, L.C.2
Manso, L.A.F.3
Billinton, R.4
-
11
-
-
0034138495
-
Pseudo-chronological simulation for composite reliability analysis with time varying loads
-
Feb
-
A.M. Leite da Silva, L.A.F. Manso, J.C.O. Mello and R. Billinton, "Pseudo-chronological simulation for composite reliability analysis with time varying loads", IEEE Trans. on Power Syst., Vol. 15, 1, pp. 73-80, Feb. 2000.
-
(2000)
IEEE Trans. on Power Syst
, vol.15
, Issue.1
, pp. 73-80
-
-
Leite da Silva, A.M.1
Manso, L.A.F.2
Mello, J.C.O.3
Billinton, R.4
-
12
-
-
84933434380
-
Equivalent circuits for power flow studies
-
J.B. Ward, "Equivalent circuits for power flow studies", AIEE Transactions, Vol. 68, pp. 498-508, 1949.
-
(1949)
AIEE Transactions
, vol.68
, pp. 498-508
-
-
Ward, J.B.1
-
13
-
-
0032592961
-
IEEE Reliability test system - 1996
-
IEEE APM Subcommittee, Aug
-
IEEE APM Subcommittee, "IEEE Reliability test system - 1996", IEEE Trans. on Power Systems,Vol. 14, pp. 1010-1020, Aug. 1999.
-
(1999)
IEEE Trans. on Power Systems
, vol.14
, pp. 1010-1020
-
-
-
14
-
-
0018544097
-
IEEE Reliability test system
-
IEEE APM Subcommittee, Nov/Dec
-
IEEE APM Subcommittee, "IEEE Reliability test system", IEEE Trans. on PAS, Vol. PAS-99, pp. 2047-2054, Nov/Dec. 1979.
-
(1979)
IEEE Trans. on PAS
, vol.PAS-99
, pp. 2047-2054
-
-
-
15
-
-
0024054212
-
Adequacy equivalents in composite power system evaluation
-
Aug
-
S. Kumar and R. Billinton, "Adequacy equivalents in composite power system evaluation", IEEE Trans. on Power Systems, Vol. 3, No. 3, pp. 1167-1173, Aug. 1988.
-
(1988)
IEEE Trans. on Power Systems
, vol.3
, Issue.3
, pp. 1167-1173
-
-
Kumar, S.1
Billinton, R.2
-
16
-
-
0029306710
-
Topological reduction considering uncertainties
-
May
-
R.N. Fontoura, M. Th. Schilling, J.C.O. Mello and J.L.R. Pereira, "Topological reduction considering uncertainties", IEEE Trans. on Power Systems, Vol. 10, No. 2, pp. 739-744, May 1995.
-
(1995)
IEEE Trans. on Power Systems
, vol.10
, Issue.2
, pp. 739-744
-
-
Fontoura, R.N.1
Schilling, M.T.2
Mello, J.C.O.3
Pereira, J.L.R.4
-
17
-
-
0033079516
-
Application of DC equivalents to the reliability evaluation of composite power systems
-
Feb
-
H.A.M. Maghraby and R.N. Allan, "Application of DC equivalents to the reliability evaluation of composite power systems", IEEE Trans. on Power Systems, Vol. 14, No. 1, pp. 355-361, Feb. 1999.
-
(1999)
IEEE Trans. on Power Systems
, vol.14
, Issue.1
, pp. 355-361
-
-
Maghraby, H.A.M.1
Allan, R.N.2
-
18
-
-
84962244774
-
Composite system reliability evaluation using AC equivalent network
-
Dec
-
K. Audomvongseree and B. Eua-Arporn, "Composite system reliability evaluation using AC equivalent network", Proceedings, of the Int. Conf. on Power System Technology - PowerCon 2000, Vol. 2, pp. 751-756, Dec. 2000.
-
(2000)
Proceedings, of the Int. Conf. on Power System Technology - PowerCon
, vol.2
, pp. 751-756
-
-
Audomvongseree, K.1
Eua-Arporn, B.2
-
19
-
-
0036699872
-
Unreliability cost assessment of an electric power system using reliability network equivalent approaches
-
Aug
-
P. Wang, R. Billinton and L. Goel, "Unreliability cost assessment of an electric power system using reliability network equivalent approaches", IEEE Trans. on PWRS, Vol. 17, No. 3, pp. 549-556, Aug. 2002.
-
(2002)
IEEE Trans. on PWRS
, vol.17
, Issue.3
, pp. 549-556
-
-
Wang, P.1
Billinton, R.2
Goel, L.3
-
20
-
-
0142135089
-
Reliability assessment of a restructured using reliability network equivalent techniques
-
Sept
-
P. Wang and R. Billinton, "Reliability assessment of a restructured using reliability network equivalent techniques", IEE Proc.-Gen., Transm and Dist., Vol. 150, No. 5, pp. 555-560, Sept. 2003.
-
(2003)
IEE Proc.-Gen., Transm and Dist
, vol.150
, Issue.5
, pp. 555-560
-
-
Wang, P.1
Billinton, R.2
-
21
-
-
0038184002
-
Optimal outage scheduling - example of application to a large power system
-
Oct
-
G.J. Anders, G. Hamoud, A.M. Leite da Silva and L.A.F. Manso, "Optimal outage scheduling - example of application to a large power system", International Journal of Electrical Power & Energy Systems. Vol. 25, No. 8, pp. 607-614, Oct. 2003.
-
(2003)
International Journal of Electrical Power & Energy Systems
, vol.25
, Issue.8
, pp. 607-614
-
-
Anders, G.J.1
Hamoud, G.2
Leite da Silva, A.M.3
Manso, L.A.F.4
|