메뉴 건너뛰기




Volumn 15, Issue 1, 2008, Pages 135-147

Measurement and control of lead-time in a manufacturing system;Medição e controle do tempo de atravessamento em um sistema de manufatura

Author keywords

Arrays in manufacturing; Lead time in manufacturing; Stochastic processes in manufacturing; Work in process in manufacturing

Indexed keywords


EID: 45549095909     PISSN: 0104530X     EISSN: 18069649     Source Type: Journal    
DOI: 10.1590/s0104-530x2008000100012     Document Type: Article
Times cited : (2)

References (32)
  • 2
    • 0002479150 scopus 로고
    • Load-oriented manufacturing control just-in-time production for job shops
    • London, v
    • BECHTE, W. Load-oriented manufacturing control just-in-time production for job shops. Production Planning & Control, London, v. 5, n. 3, p. 292-307, 1994.
    • (1994) Production Planning & Control , vol.5 , Issue.3 , pp. 292-307
    • BECHTE, W.1
  • 4
    • 0242301536 scopus 로고    scopus 로고
    • Lead-time reduction in a stochastic inventory system with learning consideration
    • London, v
    • BEN-DAYA, M.; HARIGA, M. Lead-time reduction in a stochastic inventory system with learning consideration. International Journal of Production Research, London, v. 41, n. 3, p. 571-579, 2003.
    • (2003) International Journal of Production Research , vol.41 , Issue.3 , pp. 571-579
    • BEN-DAYA, M.1    HARIGA, M.2
  • 5
    • 33749014530 scopus 로고    scopus 로고
    • Control of manufacturing systems
    • Porto Alegre, v
    • BONNEY, M. Control of manufacturing systems. Produto e Produção, Porto Alegre, v. 4, n. 1, p. 1-16, 2000.
    • (2000) Produto e Produção , vol.4 , Issue.1 , pp. 1-16
    • BONNEY, M.1
  • 6
    • 0036819876 scopus 로고    scopus 로고
    • The workload control concept: Theory and practical extensions of Load Oriented Order Release
    • London, v
    • BREITHAUPT, J.; LAND, M.; NYHUIS, P. The workload control concept: theory and practical extensions of Load Oriented Order Release. Production Planning & Control, London, v. 13, n. 7, p.625-638, 2002.
    • (2002) Production Planning & Control , vol.13 , Issue.7 , pp. 625-638
    • BREITHAUPT, J.1    LAND, M.2    NYHUIS, P.3
  • 13
    • 0004210802 scopus 로고
    • New York: John Wiley & Sons, 448 p. v
    • KLEINROCK, L. Queueing Systems. New York: John Wiley & Sons, 1975. 448 p. v.1.
    • (1975) Queueing Systems , vol.1
    • KLEINROCK, L.1
  • 15
    • 0034236833 scopus 로고    scopus 로고
    • A multi-dimensional classification of production systems for the design and selection of production planning and control systems
    • London, v
    • MACCARTHY, B.; FERNANDES, F. A multi-dimensional classification of production systems for the design and selection of production planning and control systems. Production Planning & Control, London, v.11, n.5, p.481-496, 2000.
    • (2000) Production Planning & Control , vol.11 , Issue.5 , pp. 481-496
    • MACCARTHY, B.1    FERNANDES, F.2
  • 16
    • 0037139670 scopus 로고    scopus 로고
    • A study of an integrated inventory with controllable lead time
    • London, v
    • PAN, J.; YANG, J. A study of an integrated inventory with controllable lead time. International Journal of Production Research, London, v.40, n.5, p.1263-1273, 2002.
    • (2002) International Journal of Production Research , vol.40 , Issue.5 , pp. 1263-1273
    • PAN, J.1    YANG, J.2
  • 20
    • 45549105325 scopus 로고    scopus 로고
    • SELLITTO, M. Medição e controle de desempenho estratégico em sistemas de manufatura. Porto Alegre, 2005. 195 p. Tese (Doutorado em Engenharia de Produção), Universidade Federal do Rio Grande do Sul - UFRGS.
    • SELLITTO, M. Medição e controle de desempenho estratégico em sistemas de manufatura. Porto Alegre, 2005. 195 p. Tese (Doutorado em Engenharia de Produção), Universidade Federal do Rio Grande do Sul - UFRGS.
  • 23
    • 45549103082 scopus 로고    scopus 로고
    • STEKELENBORG, R.; KORNELIUS, L. A diversified approach towards purchasing and supply. In: Walter, C.; Kliemann, F. (org.); Oliveira, J. (org). Productions Management Methods, Proceedings of the IFIP WG5.7. Working conference on evaluation, of Productions Management Methods, Gramado, Brazil: Elsevier Science, 1994. 225 p.
    • STEKELENBORG, R.; KORNELIUS, L. A diversified approach towards purchasing and supply. In: Walter, C.; Kliemann, F. (org.); Oliveira, J. (org). Productions Management Methods, Proceedings of the IFIP WG5.7. Working conference on evaluation, of Productions Management Methods, Gramado, Brazil: Elsevier Science, 1994. 225 p.
  • 27
    • 0030369957 scopus 로고    scopus 로고
    • WACKER, J. A theoretical model of manufacturing lead times and their relationship to a manufacturing goal hierarchy. Decision Sciences, New York, v.27, n.3, p- 483-518, 1996.
    • WACKER, J. A theoretical model of manufacturing lead times and their relationship to a manufacturing goal hierarchy. Decision Sciences, New York, v.27, n.3, p- 483-518, 1996.
  • 29
    • 0032672093 scopus 로고    scopus 로고
    • Modelling and controlling the dynamics of productions systems
    • London, v
    • WIENDAHL, H.; BREITHAUPT, J. Modelling and controlling the dynamics of productions systems. Production Planning & Control, London, v.10, n.4, p.389-401, 1999.
    • (1999) Production Planning & Control , vol.10 , Issue.4 , pp. 389-401
    • WIENDAHL, H.1    BREITHAUPT, J.2
  • 30


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.