|
Volumn 41, Issue 1, 2008, Pages 53-58
|
Improvement of nitrogen removal and reduction of operating costs in an activated sludge process with feedforward-cascade control strategy
|
Author keywords
Activated sludge process; ASM1; Cascade control; Dissolved oxygen concentration; Feedforward control
|
Indexed keywords
BENCHMARKING;
BIOACTIVITY;
BIOCHEMICAL OXYGEN DEMAND;
CASCADE CONTROL SYSTEMS;
COMPENSATION (PERSONNEL);
COMPUTER NETWORKS;
CONTROL EQUIPMENT;
COST REDUCTION;
COSTS;
DISSOLVED OXYGEN;
DISSOLVED OXYGEN SENSORS;
FINANCE;
INDUSTRIAL ECONOMICS;
MICROFLUIDICS;
NITROGEN;
NITROGEN REMOVAL;
NONMETALS;
OPERATING COSTS;
OXYGEN;
RECLAMATION;
SEWAGE TREATMENT;
STANDARDS;
WASTEWATER RECLAMATION;
WASTEWATER TREATMENT;
WATER POLLUTION;
WATER QUALITY;
WATER RECYCLING;
WATER TREATMENT;
WATER TREATMENT PLANTS;
WEIGHT CONTROL;
ACTIVATED SLUDGE MODEL NO.1 (ASM1);
ACTIVATED SLUDGES;
CASCADE (CO);
CASCADE CONTROL;
CONTROL STRATEGIES;
CONVENTIONAL PI CONTROL;
DISSOLVED OXYGEN (DO) CONCENTRATIONS;
EFFLUENT QUALITY STANDARDS;
EFFLUENT STANDARDS;
ELSEVIER (CO);
FEED FORWARD (FF);
HIERARCHICAL STRUCTURING;
IN ORDER;
MINIMUM COSTS;
OPERATING PERSONNEL;
OPERATIONAL COSTS;
REDUCED MODELS;
SET POINT CONTROL;
SET POINTS;
SIMULATION BENCHMARK;
SIMULATION RESULTS;
WASTE WATER TREATMENT (WWT) PLANTS;
ACTIVATED SLUDGE PROCESS;
DISSOLVED OXYGEN;
NITROGEN;
ACTIVATED SLUDGE;
ARTICLE;
CONTROL STRATEGY;
COST CONTROL;
EFFLUENT;
MODEL;
PRIORITY JOURNAL;
PROCESS CONTROL;
WASTE WATER MANAGEMENT;
|
EID: 45449088103
PISSN: 1369703X
EISSN: None
Source Type: Journal
DOI: 10.1016/j.bej.2008.03.007 Document Type: Article |
Times cited : (26)
|
References (13)
|