-
1
-
-
14644438535
-
Probabilistic modeling of one-dimensional water movement and leaching from highway embankments containing secondary materials
-
Apul, D., Gardner, K., Eighmy, T., et al. (2005). Probabilistic modeling of one-dimensional water movement and leaching from highway embankments containing secondary materials. Environ. Eng. Sci. 22, 156.
-
(2005)
Environ. Eng. Sci
, vol.22
, pp. 156
-
-
Apul, D.1
Gardner, K.2
Eighmy, T.3
-
2
-
-
33748946049
-
Effects of water quality and model structure on arsenic removal simulation: An optimization study
-
Boccelli, D.L., Small, M.J., and Dzombak, D.A. (2006). Effects of water quality and model structure on arsenic removal simulation: an optimization study. Environ. Eng. Sci. 23, 835.
-
(2006)
Environ. Eng. Sci
, vol.23
, pp. 835
-
-
Boccelli, D.L.1
Small, M.J.2
Dzombak, D.A.3
-
3
-
-
0031162588
-
A fuzzy goal programming approach for the optimal planning of metropolitan solid waste management systems
-
Chang, N.B., and Wang, S.F. (1997). A fuzzy goal programming approach for the optimal planning of metropolitan solid waste management systems. Eur. J. Oper. Res. 99, 287.
-
(1997)
Eur. J. Oper. Res
, vol.99
, pp. 287
-
-
Chang, N.B.1
Wang, S.F.2
-
4
-
-
0030251086
-
A grey fuzzy multiobjective programming approach for the optimal planning of a reservoir watershed, part A: Theoretical development
-
Chang, N.B., Wen C.G., and Yong, Y.C. (1996a). A grey fuzzy multiobjective programming approach for the optimal planning of a reservoir watershed, part A: Theoretical development. Water Res. 30, 2329.
-
(1996)
Water Res
, vol.30
, pp. 2329
-
-
Chang, N.B.1
Wen, C.G.2
Yong, Y.C.3
-
5
-
-
0030251091
-
A grey fuzzy multiobjective programming approach for the optimal planning of a reservoir watershed, part B: Application
-
Chang, N.B., Wen, C.G., and Yong, Y.C. (1996b). A grey fuzzy multiobjective programming approach for the optimal planning of a reservoir watershed, part B: Application. Water Res. 30, 2335.
-
(1996)
Water Res
, vol.30
, pp. 2335
-
-
Chang, N.B.1
Wen, C.G.2
Yong, Y.C.3
-
6
-
-
0043093263
-
Long-term planning of integrated solid waste management system under uncertainty
-
University of Regina, Saskatchewan, Canada
-
Chi, G.F., and Huang, G.H. (1998). Long-term planning of integrated solid waste management system under uncertainty. Report submitted to the City of Regina. University of Regina, Saskatchewan, Canada.
-
(1998)
Report submitted to the City of Regina
-
-
Chi, G.F.1
Huang, G.H.2
-
7
-
-
1842530979
-
A conceptual method for solving generalized semi-infinite problems via global optimization by exact discontinuous penalization
-
Geletu, A., and Hoffmann, A. (2004). A conceptual method for solving generalized semi-infinite problems via global optimization by exact discontinuous penalization. Eur. J. Oper. Res. 157, 3.
-
(2004)
Eur. J. Oper. Res
, vol.157
, pp. 3
-
-
Geletu, A.1
Hoffmann, A.2
-
8
-
-
0036883798
-
Linear semi-infinite programming theory: An updated survey
-
Goberna, M.A., and López, M.A. (2002). Linear semi-infinite programming theory: An updated survey. Eur. J. Oper. Res. 143, 390.
-
(2002)
Eur. J. Oper. Res
, vol.143
, pp. 390
-
-
Goberna, M.A.1
López, M.A.2
-
9
-
-
33144465949
-
A probabilistic reasoning-based decision support system for selecting remediation technologies for petroleum-contaminated sites
-
He, L., Chan, C.W., Huang, G.H., and Zeng, G.M. (2006). A probabilistic reasoning-based decision support system for selecting remediation technologies for petroleum-contaminated sites. Expert Syst. Appl. 30, 783.
-
(2006)
Expert Syst. Appl
, vol.30
, pp. 783
-
-
He, L.1
Chan, C.W.2
Huang, G.H.3
Zeng, G.M.4
-
10
-
-
44949260972
-
Wavelet-based multiresolution analysis technique for data cleaning and its application to water quality management system
-
doi: 10.1016/j.eswa.2007.08.009
-
He, L., Huang, G.H., and Zeng, G.M. (2007). Wavelet-based multiresolution analysis technique for data cleaning and its application to water quality management system. Expert Syst. Appl. doi: 10.1016/j.eswa.2007.08.009.
-
(2007)
Expert Syst. Appl
-
-
He, L.1
Huang, G.H.2
Zeng, G.M.3
-
11
-
-
55749107418
-
Identifying optimal regional solid waste management strategies through a new inexact integer programming model containing infinite objectives and constraints
-
doi: 10.1016/j.wasman.2008.02.003
-
He, L., Huang, G.H., and Zeng, G.M. (2008). Identifying optimal regional solid waste management strategies through a new inexact integer programming model containing infinite objectives and constraints. Waste Manage. doi: 10.1016/j.wasman.2008.02.003.
-
(2008)
Waste Manage
-
-
He, L.1
Huang, G.H.2
Zeng, G.M.3
-
12
-
-
0002379381
-
Grey fuzzy dynamic programming: Application to municipal solid waste management planning problems
-
Huang, G.H., Baetz, B.W., and Patry, G.G. (1993). Grey fuzzy dynamic programming: Application to municipal solid waste management planning problems. Civil Eng. Syst. 11, 43.
-
(1993)
Civil Eng. Syst
, vol.11
, pp. 43
-
-
Huang, G.H.1
Baetz, B.W.2
Patry, G.G.3
-
13
-
-
84954829625
-
A grey fuzzy linear programming approach for municipal solid waste management planning under uncertainty
-
Huang, G.H., Baetz, B.W., and Patry, G.G. (1994). A grey fuzzy linear programming approach for municipal solid waste management planning under uncertainty. Civil Eng. Syst. 10, 123.
-
(1994)
Civil Eng. Syst
, vol.10
, pp. 123
-
-
Huang, G.H.1
Baetz, B.W.2
Patry, G.G.3
-
14
-
-
0029485968
-
Grey fuzzy integer programming: An application to regional waste management under uncertainty
-
Huang, G.H., Baetz, B.W., and Patry, G.G. (1995). Grey fuzzy integer programming: An application to regional waste management under uncertainty. Socio-Econ. Plann. Sci. 29, 17.
-
(1995)
Socio-Econ. Plann. Sci
, vol.29
, pp. 17
-
-
Huang, G.H.1
Baetz, B.W.2
Patry, G.G.3
-
15
-
-
0036692334
-
Violation analysis for solid waste management systems: An interval fuzzy programming approach
-
Huang, Y. F., Baetz, B.W., Huang, G.H., et al. (2002). Violation analysis for solid waste management systems: an interval fuzzy programming approach. J. Environ. Manage. 65, 431.
-
(2002)
J. Environ. Manage
, vol.65
, pp. 431
-
-
Huang, Y.F.1
Baetz, B.W.2
Huang, G.H.3
-
16
-
-
0005265753
-
Fuzzy programming: A survey of recent developments
-
R. Slowinski, and J. Teghem, Eds, Dordrecht, Germany; Kluwer Academic Publishers, p
-
Inuiguchi, M., Ichihashi, H., and Tanaka, H. (1990). Fuzzy programming: A survey of recent developments. In R. Slowinski, and J. Teghem, Eds. Stochastic versus Fuzzy Approaches to Multiobjective Mathematical Programming under Uncertainty. Dordrecht, Germany; Kluwer Academic Publishers, p. 45.
-
(1990)
Stochastic versus Fuzzy Approaches to Multiobjective Mathematical Programming under Uncertainty
, pp. 45
-
-
Inuiguchi, M.1
Ichihashi, H.2
Tanaka, H.3
-
17
-
-
0020208472
-
Parametric mixed integer programming: An application to solid waste management
-
Jenkins, L. (1982). Parametric mixed integer programming: An application to solid waste management. Manage. Sci. 28, 1270.
-
(1982)
Manage. Sci
, vol.28
, pp. 1270
-
-
Jenkins, L.1
-
18
-
-
33744538760
-
Grey fuzzy optimization model for water quality management of a river system
-
Karmakar, S., and Mujumdar, P.P. (2006). Grey fuzzy optimization model for water quality management of a river system. Adv. Water Resour. 29, 1088.
-
(2006)
Adv. Water Resour
, vol.29
, pp. 1088
-
-
Karmakar, S.1
Mujumdar, P.P.2
-
19
-
-
33847284990
-
A two-phase grey fuzzy optimization approach for water quality management of a river system
-
Karmakar, S., and Mujumdar, P.P. (2007). A two-phase grey fuzzy optimization approach for water quality management of a river system. Adv. Water Resour. 30, 1218.
-
(2007)
Adv. Water Resour
, vol.30
, pp. 1218
-
-
Karmakar, S.1
Mujumdar, P.P.2
-
20
-
-
0026173739
-
Multi-objective siting planning for a regional hazardous waste treatment center
-
Koo, J.K., Shin, H.S., and Yoo, H.C. (1991). Multi-objective siting planning for a regional hazardous waste treatment center. Waste Manage. Res. 9, 205.
-
(1991)
Waste Manage. Res
, vol.9
, pp. 205
-
-
Koo, J.K.1
Shin, H.S.2
Yoo, H.C.3
-
21
-
-
0026230689
-
Fuzzy decision making in dredged-material management
-
Lee, Y.W., Bogardi, I., and Stansbury, J. (1991). Fuzzy decision making in dredged-material management. J. Environ. Eng.-ASCE 117, 614.
-
(1991)
J. Environ. Eng.-ASCE
, vol.117
, pp. 614
-
-
Lee, Y.W.1
Bogardi, I.2
Stansbury, J.3
-
22
-
-
44149098602
-
Modeling of substrate degradation and oxygen consumption in waste composting processes
-
doi: 10.1016/j.wasman.2007.09.016
-
Lin, Y.P., Huang, G.H., Lu, H.W., et al. (2007). Modeling of substrate degradation and oxygen consumption in waste composting processes. Waste Manage. doi: 10.1016/j.wasman.2007.09.016.
-
(2007)
Waste Manage
-
-
Lin, Y.P.1
Huang, G.H.2
Lu, H.W.3
-
23
-
-
0037620639
-
A fuzzy-stochastic robust programming model for regional air quality management under uncertainty
-
Liu, L., Huang, G.H., Liu, Y., et al. (2003). A fuzzy-stochastic robust programming model for regional air quality management under uncertainty. Eng. Optimizat. 35, 177.
-
(2003)
Eng. Optimizat
, vol.35
, pp. 177
-
-
Liu, L.1
Huang, G.H.2
Liu, Y.3
-
24
-
-
55249112062
-
An inexact dynamic optimization model for municipal solid waste management in association with greenhouse gas emission control
-
doi: 10.1016/j.jenvman.2007.10.011
-
Lu, H.W., Huang, G.H., He, L., and Zeng, G.M. (2007a). An inexact dynamic optimization model for municipal solid waste management in association with greenhouse gas emission control. J. Environ. Manage. doi: 10.1016/j.jenvman.2007.10.011.
-
(2007)
J. Environ. Manage
-
-
Lu, H.W.1
Huang, G.H.2
He, L.3
Zeng, G.M.4
-
25
-
-
46949095746
-
An inexact two-stage fuzzy-stochastic programming model for water resources management
-
doi: 10.1007/s11269-007-9206-8
-
Lu, H.W., Huang, G.H., Zeng, G.M., et al. (2007b). An inexact two-stage fuzzy-stochastic programming model for water resources management. Water Resour. Manag. doi: 10.1007/s11269-007-9206-8.
-
(2007)
Water Resour. Manag
-
-
Lu, H.W.1
Huang, G.H.2
Zeng, G.M.3
-
26
-
-
13544252464
-
An interval-parameter fuzzy two-stage stochastic programming approach for water resources management under uncertainty
-
Maqsood, I., Yeomans, J.S., Huang, G.H., et al. (2005). An interval-parameter fuzzy two-stage stochastic programming approach for water resources management under uncertainty. Eur. J. Oper. Res. 167, 208.
-
(2005)
Eur. J. Oper. Res
, vol.167
, pp. 208
-
-
Maqsood, I.1
Yeomans, J.S.2
Huang, G.H.3
-
27
-
-
45149103813
-
Interval analysis. Applied Mathematics
-
Lockheed Aircraft Corporation, Missiles and Space Division. Sunnyvale, CA
-
Moore, R.E., and Yang, C.T. (1959). Interval analysis. Applied Mathematics. Technical Document. Lockheed Aircraft Corporation, Missiles and Space Division. Sunnyvale, CA.
-
(1959)
Technical Document
-
-
Moore, R.E.1
Yang, C.T.2
-
28
-
-
27544492202
-
Decision analysis for storage for reclaimed asphalt
-
Norrman, J. Rosen, L., and Norin, M. (2005). Decision analysis for storage for reclaimed asphalt. Environ. Eng. Sci. 22, 783.
-
(2005)
Environ. Eng. Sci
, vol.22
, pp. 783
-
-
Norrman, J.1
Rosen, L.2
Norin, M.3
-
29
-
-
0042592422
-
-
M.A.Sc. Thesis, University of Regina, Regina, Saskatchewan, Canada
-
Sae-Lim, N. (1999). Long-term planning of a solid waste management system under uncertainty - An inexact optimization approach. M.A.Sc. Thesis, University of Regina, Regina, Saskatchewan, Canada.
-
(1999)
Long-term planning of a solid waste management system under uncertainty - An inexact optimization approach
-
-
Sae-Lim, N.1
-
30
-
-
0036833064
-
On generalized semi-infinite optimization and bilevel optimization
-
Stein, O., and Still, G. (2002). On generalized semi-infinite optimization and bilevel optimization. Eur. J. Oper. Res. 142, 444.
-
(2002)
Eur. J. Oper. Res
, vol.142
, pp. 444
-
-
Stein, O.1
Still, G.2
-
31
-
-
39449139915
-
Modeling waste management options for greenhouse gas reduction
-
Thompson, S., and Tanapat, S. (2005). Modeling waste management options for greenhouse gas reduction. J. Environ. Informatics 6, 16.
-
(2005)
J. Environ. Informatics
, vol.6
, pp. 16
-
-
Thompson, S.1
Tanapat, S.2
-
32
-
-
0242406703
-
Robot trajectory planning with semi-infinite programming
-
Vaz, A.I.F., Fernandes, E.M.G.P., and Gomes, M.P.S.F. (2004). Robot trajectory planning with semi-infinite programming. Eur. J. Oper. Res. 153, 607.
-
(2004)
Eur. J. Oper. Res
, vol.153
, pp. 607
-
-
Vaz, A.I.F.1
Fernandes, E.M.G.P.2
Gomes, M.P.S.F.3
-
33
-
-
13544266859
-
Combining simulation with evolutionary algorithms for optimal planning under uncertainty: An application to municipal solid waste management planning in the regional municipality of Hamilton-Wentworth
-
Yeomans, J.S., Huang, G.H., and Yoogalingam, R. (2003). Combining simulation with evolutionary algorithms for optimal planning under uncertainty: An application to municipal solid waste management planning in the regional municipality of Hamilton-Wentworth. J. Environ. Informatics 2, 11.
-
(2003)
J. Environ. Informatics
, vol.2
, pp. 11
-
-
Yeomans, J.S.1
Huang, G.H.2
Yoogalingam, R.3
-
34
-
-
33749150922
-
Internet-based fuzzy multicriteria decision support system for planning integrated solid waste management
-
Zeng, Y., and Trauth, K.M. (2005). Internet-based fuzzy multicriteria decision support system for planning integrated solid waste management. J. Environ. Informatics 6, 1.
-
(2005)
J. Environ. Informatics
, vol.6
, pp. 1
-
-
Zeng, Y.1
Trauth, K.M.2
|