-
1
-
-
0035480374
-
Incorporating physical demand criteria into assembly line balancing
-
Carnahan, J. Brian, Norman A. Bryan, and Redfern S. Mark, 2001, "Incorporating physical demand criteria into assembly line balancing.", IE Transactions, Vol. 33 No. 10:875.
-
(2001)
IE Transactions
, vol.33
, Issue.10
, pp. 875
-
-
Carnahan, J.B.1
Bryan, N.A.2
Mark, R.S.3
-
2
-
-
0031649739
-
-
Matson, J. B. and McFarlane, D. C. 1998, Tools for Assesing the responsiveness of existing production operations., in Proceedings of IEE Workhshop, Responsiveness in Manufacturing, London.
-
Matson, J. B. and McFarlane, D. C. 1998, "Tools for Assesing the responsiveness of existing production operations.", in Proceedings of IEE Workhshop, Responsiveness in Manufacturing, London.
-
-
-
-
3
-
-
0033414002
-
Assesing the responsiveness of existing production operations
-
Matson, J. B. and McFarlane, D. C. 1999, "Assesing the responsiveness of existing production operations.", International Journal of Operations & Production Management, Vol. 19 No. 8: 776-784.
-
(1999)
International Journal of Operations & Production Management
, vol.19
, Issue.8
, pp. 776-784
-
-
Matson, J.B.1
McFarlane, D.C.2
-
4
-
-
84986156559
-
Managerial disturbance handling: A case study approach
-
Meskill M., Mouly, S. and Dakin, S. 1999, "Managerial disturbance handling: a case study approach.", Managerial Psychology, Vol. 14 No. 6: 443-454.
-
(1999)
Managerial Psychology
, vol.14
, Issue.6
, pp. 443-454
-
-
Meskill, M.1
Mouly, S.2
Dakin, S.3
-
5
-
-
0033418382
-
Responsiveness of the order fulfilment process
-
Kritchanchai, D. and MacCarthy, B. L. 1999, "Responsiveness of the order fulfilment process." , International Journal of Operations & Production Management, Vol. 19 No. 8: 812-833.
-
(1999)
International Journal of Operations & Production Management
, vol.19
, Issue.8
, pp. 812-833
-
-
Kritchanchai, D.1
MacCarthy, B.L.2
-
6
-
-
6544245177
-
A study of the effect of time variations for assembly line balancing in the clothing industry
-
Hui Chi L. P. and Ng Sau F. F. 1999, "A study of the effect of time variations for assembly line balancing in the clothing industry.", International Journal of Clothing Science and Technology, Vol. 11 No. 4: 181-188.
-
(1999)
International Journal of Clothing Science and Technology
, vol.11
, Issue.4
, pp. 181-188
-
-
Hui Chi, L.P.1
Ng Sau, F.F.2
-
7
-
-
45149112648
-
Investigación de Operaciones
-
S. A. primera edición
-
Mathur, Kamlesh and Solow, Daniesl, 1996, "Investigación de Operaciones.", Prentice-Hall Hispanoamericana, S. A. primera edición: 492-541.
-
(1996)
Prentice-Hall Hispanoamericana
, pp. 492-541
-
-
Mathur, K.1
Solow, D.2
-
8
-
-
45149119020
-
-
Ramírez-Campos, S. and Saláis-Fierro, T., 2004, Flexibility and Time Optimization in an Automotive Assembly Line: A Neural Network Approach., in proceedings of Business & Industry Symposium: Advanced Simulation Technology Conference, Arlington, VA, USA.
-
Ramírez-Campos, S. and Saláis-Fierro, T., 2004, "Flexibility and Time Optimization in an Automotive Assembly Line: A Neural Network Approach.", in proceedings of Business & Industry Symposium: Advanced Simulation Technology Conference, Arlington, VA, USA.
-
-
-
-
9
-
-
0037995671
-
Intelligent dynamic scheduling system
-
Jahangirian, M. and Conroy, G. V., 2000, "Intelligent dynamic scheduling system." Integrated Manufacturing Systems, Vol. 11 No. 4: 247-257.
-
(2000)
Integrated Manufacturing Systems
, vol.11
, Issue.4
, pp. 247-257
-
-
Jahangirian, M.1
Conroy, G.V.2
-
10
-
-
45149086786
-
Fuzzy Engineering Expert Systems with Neural Network Applications
-
Badibaru, A. B. and Cheung, J. Y., 2002, "Fuzzy Engineering Expert Systems with Neural Network Applications.", John Wiley & Sons, Inc.
-
(2002)
John Wiley & Sons, Inc
-
-
Badibaru, A.B.1
Cheung, J.Y.2
-
11
-
-
0342622534
-
Genetic algorithms in search, optimization, and machine learning
-
Goldberg, David E., 1989, "Genetic algorithms in search, optimization, and machine learning", Addison-Wesley Pub Co".
-
(1989)
Addison-Wesley Pub Co
-
-
Goldberg, D.E.1
|