-
1
-
-
77957040526
-
Continuous review policies for multi-level inventory systems with stochastic demand
-
Graves S.C., Rinnoy Kan A.H., and Zipkin P.H. (Eds), North-Holland Publishing Company, Amsterdam, The Netherlands (Chapter 4)
-
Axsater S. Continuous review policies for multi-level inventory systems with stochastic demand. In: Graves S.C., Rinnoy Kan A.H., and Zipkin P.H. (Eds). Handbooks in Operation Research and Management Science, vol. 4. Logistics of Production and Inventory (1993), North-Holland Publishing Company, Amsterdam, The Netherlands (Chapter 4)
-
(1993)
Handbooks in Operation Research and Management Science, vol. 4. Logistics of Production and Inventory
-
-
Axsater, S.1
-
2
-
-
0004113622
-
-
Addison-Wesley Publishing Company, Reading, MA
-
Conway R., Maxwell W., and Miller L. Theory of Scheduling (1967), Addison-Wesley Publishing Company, Reading, MA
-
(1967)
Theory of Scheduling
-
-
Conway, R.1
Maxwell, W.2
Miller, L.3
-
4
-
-
0034156160
-
A supply network model with base-stock control and service requirements
-
Ettl M., Feigin G.E., Lin G.Y., and Yao D.D. A supply network model with base-stock control and service requirements. Operations Research 48 (2000)
-
(2000)
Operations Research
, vol.48
-
-
Ettl, M.1
Feigin, G.E.2
Lin, G.Y.3
Yao, D.D.4
-
5
-
-
77957084948
-
Centralized planning models for multi-echelon inventory systems under uncertainty
-
Graves S.C., Rinnooy Kan A.H., and Zipkin P.H. (Eds), North-Holland Publishing Company, Amsterdam, The Netherlands (Chapter 3)
-
Federgruen A. Centralized planning models for multi-echelon inventory systems under uncertainty. In: Graves S.C., Rinnooy Kan A.H., and Zipkin P.H. (Eds). Handbooks in Operations Research and Management Science, vol. 4. Logistics of Production and Inventory (1993), North-Holland Publishing Company, Amsterdam, The Netherlands (Chapter 3)
-
(1993)
Handbooks in Operations Research and Management Science, vol. 4. Logistics of Production and Inventory
-
-
Federgruen, A.1
-
6
-
-
0029254553
-
Sensitivity analysis for base-stock levels in multi-echelon production-inventory systems
-
Glasserman P., and Tayur S. Sensitivity analysis for base-stock levels in multi-echelon production-inventory systems. Management Science 41 (1995) 263-281
-
(1995)
Management Science
, vol.41
, pp. 263-281
-
-
Glasserman, P.1
Tayur, S.2
-
7
-
-
45049087479
-
-
Graves, S.C., Willems, S.P., 1996. Strategic safety stock placement in supply chains. In: Proceedings of the 1996 MSOM Conference, Hanover, NH.
-
Graves, S.C., Willems, S.P., 1996. Strategic safety stock placement in supply chains. In: Proceedings of the 1996 MSOM Conference, Hanover, NH.
-
-
-
-
11
-
-
0040033785
-
Valuation of leadtime reduction in multi-stage production systems
-
Fandel G., Gulledge T., and Jones A. (Eds), Springer, Berlin, Germany
-
Inderfurth K. Valuation of leadtime reduction in multi-stage production systems. In: Fandel G., Gulledge T., and Jones A. (Eds). Operation Research in Production Planning and Inventory Control (1993), Springer, Berlin, Germany 413-427
-
(1993)
Operation Research in Production Planning and Inventory Control
, pp. 413-427
-
-
Inderfurth, K.1
-
12
-
-
0028443055
-
Safety stocks in multistage, divergent inventory systems: A survey
-
Inderfurth K. Safety stocks in multistage, divergent inventory systems: A survey. International Journal of Production Economics 35 (1994) 321-329
-
(1994)
International Journal of Production Economics
, vol.35
, pp. 321-329
-
-
Inderfurth, K.1
-
13
-
-
0039392544
-
Safety stocks in multi-stage inventory systems under different service measures
-
Inderfurth K., and Minner S. Safety stocks in multi-stage inventory systems under different service measures. European Journal of Operational Research 106 (1998) 57-73
-
(1998)
European Journal of Operational Research
, vol.106
, pp. 57-73
-
-
Inderfurth, K.1
Minner, S.2
-
14
-
-
45049086768
-
-
Kaminsky, P., Kaya, O., 2008a. Scheduling and due date quotation in a MTO supply chain, submitted for publication.
-
Kaminsky, P., Kaya, O., 2008a. Scheduling and due date quotation in a MTO supply chain, submitted for publication.
-
-
-
-
15
-
-
45049083107
-
-
Kaminsky, P., Kaya, O., 2008b. An analysis of a combined make-to-order/make-to-stock system. IIE Transactions, to appear.
-
Kaminsky, P., Kaya, O., 2008b. An analysis of a combined make-to-order/make-to-stock system. IIE Transactions, to appear.
-
-
-
-
16
-
-
0032201667
-
Probabilistic analysis and practical algorithms for the flow shop weighted completion time problem
-
Kaminsky P., and Simchi-Levi D. Probabilistic analysis and practical algorithms for the flow shop weighted completion time problem. Operations Research 46 (1998) 872-882
-
(1998)
Operations Research
, vol.46
, pp. 872-882
-
-
Kaminsky, P.1
Simchi-Levi, D.2
-
17
-
-
0035476812
-
Probabilistic analysis of an on-line algorithm for the single machine completion time problem with release dates
-
Kaminsky P., and Simchi-Levi D. Probabilistic analysis of an on-line algorithm for the single machine completion time problem with release dates. Operations Research Letters 29 (2001) 141-148
-
(2001)
Operations Research Letters
, vol.29
, pp. 141-148
-
-
Kaminsky, P.1
Simchi-Levi, D.2
-
18
-
-
0027658539
-
Material management in decentralized supply chains
-
Lee H.L., and Billington C. Material management in decentralized supply chains. Operations Research 41 (1993) 835-847
-
(1993)
Operations Research
, vol.41
, pp. 835-847
-
-
Lee, H.L.1
Billington, C.2
-
19
-
-
29144527111
-
Inventory placement in acyclic supply chain networks
-
Magnanti T.L., Shen Z.M., Shu J., Simchi-Levi D., and Teo C.P. Inventory placement in acyclic supply chain networks. Operations Research Letters 34 (2006) 228-238
-
(2006)
Operations Research Letters
, vol.34
, pp. 228-238
-
-
Magnanti, T.L.1
Shen, Z.M.2
Shu, J.3
Simchi-Levi, D.4
Teo, C.P.5
-
20
-
-
0040626984
-
Dynamic programming algorithms for multi-stage safety stock optimization
-
Minner S. Dynamic programming algorithms for multi-stage safety stock optimization. OR Spektrum 19 (1997) 261-271
-
(1997)
OR Spektrum
, vol.19
, pp. 261-271
-
-
Minner, S.1
-
21
-
-
0009970655
-
In-process inventories
-
Simpson K.F. In-process inventories. Operations Research 6 (1958) 863-873
-
(1958)
Operations Research
, vol.6
, pp. 863-873
-
-
Simpson, K.F.1
-
22
-
-
45049084068
-
-
Wallstrom, B., 1980. On the M/G/1 queue with several classes of customers having different service time distributions. Report 1-19, Lund Institute of Technology.
-
Wallstrom, B., 1980. On the M/G/1 queue with several classes of customers having different service time distributions. Report 1-19, Lund Institute of Technology.
-
-
-
-
23
-
-
0034223270
-
On the asymptotic optimality of the SPT rule for the flow shop average completion time problem
-
Xia C., Shanthikumar G., and Glynn P. On the asymptotic optimality of the SPT rule for the flow shop average completion time problem. Operations Research 48 (2000) 615-622
-
(2000)
Operations Research
, vol.48
, pp. 615-622
-
-
Xia, C.1
Shanthikumar, G.2
Glynn, P.3
|