메뉴 건너뛰기




Volumn 4, Issue , 2008, Pages 721-730

A study of life cycle costing in the perspectives of research and commercial applications in the 21st century

Author keywords

[No Author keywords available]

Indexed keywords

ACADEMIC RESEARCHES; COMMERCIAL APPLICATIONS; COMPLEX PRODUCTS; COST ESTIMATIONS; CRITICAL FACTORS; DEFENCE SECTORS; DISPOSAL COSTS; ELECTRONIC PRODUCTS; INTERNATIONAL CONFERENCES; INTERNATIONAL DESIGNS; LEGACY DATA; LIFE-CYCLE COST (LCC); LONG LIFE; MANUFACTURING COSTS; MATHEMATICAL REPRESENTATIONS; TECHNICAL CONFERENCES;

EID: 44849120023     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1115/DETC2007-34425     Document Type: Conference Paper
Times cited : (12)

References (41)
  • 2
    • 0028728683 scopus 로고
    • Life Cycle Cost Procurement of Swedish State Railways' High-Speed Train X2000
    • IMechE
    • Akselsson, H. and Burstrom,B., 1994, "Life Cycle Cost Procurement of Swedish State Railways' High-Speed Train X2000, Proceedings of International Mechanical Engineers (IMechE), Vol. 208, pp. 51-59.
    • (1994) Proceedings of International Mechanical Engineers , vol.208 , pp. 51-59
    • Akselsson, H.1    Burstrom, B.2
  • 5
    • 0031364179 scopus 로고    scopus 로고
    • Life-Cycle Cost of New Construction Materials
    • Ehlen, M.A., 1997, "Life-Cycle Cost of New Construction Materials", Journal of Infrastructure Systems, Vol. 3, No. 4, pp.129-133.
    • (1997) Journal of Infrastructure Systems , vol.3 , Issue.4 , pp. 129-133
    • Ehlen, M.A.1
  • 6
    • 30444458055 scopus 로고    scopus 로고
    • Functional Product Life-cycle Simulation Model for Cost Estimation in Conceptual Design of Jet Engine Components
    • Sandberg, M., Boart, P. and Larsson, T., 2005, "Functional Product Life-cycle Simulation Model for Cost Estimation in Conceptual Design of Jet Engine Components", Concurrent Engineering: Research and Applications, Vol. 13, No. 4, pp. 331-342.
    • (2005) Concurrent Engineering: Research and Applications , vol.13 , Issue.4 , pp. 331-342
    • Sandberg, M.1    Boart, P.2    Larsson, T.3
  • 7
    • 0032046060 scopus 로고    scopus 로고
    • Product Life-cycle Cost Analysis: State of the Art Review
    • Gu., P. and Asiedu, Y., 1998, "Product Life-cycle Cost Analysis: State of the Art Review", International Journal of Production Research, Vol.36, No. 4, pp.883-908.
    • (1998) International Journal of Production Research , vol.36 , Issue.4 , pp. 883-908
    • Gu, P.1    Asiedu, Y.2
  • 9
    • 0035427238 scopus 로고    scopus 로고
    • Manufacturing Cost Modelling for Concurrent Product Development
    • Vo
    • Shehab,E.M. and Abdalla, H.S., 2001, "Manufacturing Cost Modelling for Concurrent Product Development", Robotics and Computer Integrated Manufacturing, Vo. 17, No. 4, pp.341-353.
    • (2001) Robotics and Computer Integrated Manufacturing , vol.17 , Issue.4 , pp. 341-353
    • Shehab, E.M.1    Abdalla, H.S.2
  • 10
    • 0000202696 scopus 로고    scopus 로고
    • Reconciling Theory and Practice of Life-Cycle Costing
    • Cole, R.J. and Sterner, E., 2000, "Reconciling Theory and Practice of Life-Cycle Costing", Building Research & Information, Vol. 28, No.5/6, pp.368-375.
    • (2000) Building Research & Information , vol.28 , Issue.5-6 , pp. 368-375
    • Cole, R.J.1    Sterner, E.2
  • 11
    • 0036262585 scopus 로고    scopus 로고
    • Approximate Estimation of the Product Life Cycle Cost Using Artificial Neural Networks in Conceptual Design
    • Seo, K.K., Park, J.H., Jang, D.S. and Wallace, D., 2002, "Approximate Estimation of the Product Life Cycle Cost Using Artificial Neural Networks in Conceptual Design", International Journal of Advanced Manufacturing Technology, Vol.19, pp. 461-471.
    • (2002) International Journal of Advanced Manufacturing Technology , vol.19 , pp. 461-471
    • Seo, K.K.1    Park, J.H.2    Jang, D.S.3    Wallace, D.4
  • 13
  • 15
    • 44849139996 scopus 로고    scopus 로고
    • A Proposed Method for Cost Estimating for Low Volume Infrequent Electronic Products
    • September 18-22, Antibes, France, IOS Press, ISBN 1-58603-651-3, pp
    • Newnes, L.B. and Mileham, A.R., 2006, "A Proposed Method for Cost Estimating for Low Volume Infrequent Electronic Products", Proceedings of the 13th International Conference on Concurrent Engineering (ISPE CE 2006), September 18-22, Antibes, France, IOS Press, ISBN 1-58603-651-3, pp.699-706.
    • (2006) Proceedings of the 13th International Conference on Concurrent Engineering (ISPE CE , pp. 699-706
    • Newnes, L.B.1    Mileham, A.R.2
  • 16
    • 44849083670 scopus 로고    scopus 로고
    • Whole Life Costing in Construction: A State of the Art Review
    • Electronic Reference PS0420
    • Kishk, M., Al-Hajj, A., Pollock, R., Aouad, G., Bakis, N. and Sun., M., 2003, "Whole Life Costing in Construction: A State of the Art Review", RICS Foundation, Vol. 4, No. 18, Electronic Reference PS0420.
    • (2003) RICS Foundation , vol.4 , Issue.18
    • Kishk, M.1    Al-Hajj, A.2    Pollock, R.3    Aouad, G.4    Bakis, N.5    Sun, M.6
  • 17
    • 1542710394 scopus 로고    scopus 로고
    • Whole Life Cost: The Future Trend in Software Development
    • Bradley, M. and Dawson, R., 1999, "Whole Life Cost: The Future Trend in Software Development", Software Quality Journal, Vol. 8, No. 2, pp.121-131.
    • (1999) Software Quality Journal , vol.8 , Issue.2 , pp. 121-131
    • Bradley, M.1    Dawson, R.2
  • 18
    • 0036282930 scopus 로고    scopus 로고
    • El-Haram M. A, Marenjak S., Homer R.M.W., 2002, Development of a Generic Framework for Collecting Whole Life Cost Data for the Building Industry, Journal of Quality in Maintenance Engineering, MCB University Press, 8, No. 2, pp. 144-151.
    • El-Haram M. A, Marenjak S., Homer R.M.W., 2002, "Development of a Generic Framework for Collecting Whole Life Cost Data for the Building Industry", Journal of Quality in Maintenance Engineering, MCB University Press, Vol. 8, No. 2, pp. 144-151.
  • 19
    • 0034562014 scopus 로고    scopus 로고
    • Can Target Costing and Whole Life Costing be Applied in the Construction Industry?: Evidence from Two Case Studies
    • Nicolini, D., Tomkins, C., Holti, R, Oldman, A. and Smalley, M., 2000, "Can Target Costing and Whole Life Costing be Applied in the Construction Industry?: Evidence from Two Case Studies", British Journal of Management, Vol. 11, pp. 303-324.
    • (2000) British Journal of Management , vol.11 , pp. 303-324
    • Nicolini, D.1    Tomkins, C.2    Holti, R.3    Oldman, A.4    Smalley, M.5
  • 20
    • 0036499214 scopus 로고    scopus 로고
    • A New Approach to Production Regularity Assessment in the Oil and Chemical Industries
    • Kawauchi, Y. and Rausand, M., 2002, "A New Approach to Production Regularity Assessment in the Oil and Chemical Industries", Reliability Engineering and System Safety, Vol. 75, pp. 379-388.
    • (2002) Reliability Engineering and System Safety , vol.75 , pp. 379-388
    • Kawauchi, Y.1    Rausand, M.2
  • 21
    • 84885278105 scopus 로고    scopus 로고
    • Gamerman, D., 2006, Markov Chain Monte Carlo: Stochastic Simulation for Bayesian Inference, Chapman and Hall, 2nd Edition, ISBN-10: 1584885874, ISBN-13: 978-1584885870.
    • Gamerman, D., 2006, Markov Chain Monte Carlo: Stochastic Simulation for Bayesian Inference, Chapman and Hall, 2nd Edition, ISBN-10: 1584885874, ISBN-13: 978-1584885870.
  • 22
    • 0037258746 scopus 로고    scopus 로고
    • Davis, N., Jones, J. and Warrington, L., 2003, A Framework for Documenting and Analyzing Life-Cycle Costs Using a Simple Network Based Representation, Proceedings of Annual Reliability and Maintainability Symposium, pp. 232-236, ISBN: 0-7803-7717-6.
    • Davis, N., Jones, J. and Warrington, L., 2003, "A Framework for Documenting and Analyzing Life-Cycle Costs Using a Simple Network Based Representation", Proceedings of Annual Reliability and Maintainability Symposium, pp. 232-236, ISBN: 0-7803-7717-6.
  • 23
    • 33744950997 scopus 로고    scopus 로고
    • Obsolescence Driven Design Refresh Planning for Sustainment-Dominated Systems
    • Singh., P., Sandbom., P., 2006, "Obsolescence Driven Design Refresh Planning for Sustainment-Dominated Systems", Engineering Economist, Vol. 51, No. 2, pp.115-139.
    • (2006) Engineering Economist , vol.51 , Issue.2 , pp. 115-139
    • Singh, P.1    Sandbom, P.2
  • 24
    • 3042549454 scopus 로고    scopus 로고
    • Managing Product Obsolescence - Now You See It Now You Don't
    • Schneiderman, R., 2004, "Managing Product Obsolescence - Now You See It Now You Don't", Electronic Design, Vol. 52, No. 12, pp 47-52.
    • (2004) Electronic Design , vol.52 , Issue.12 , pp. 47-52
    • Schneiderman, R.1
  • 25
    • 84885278322 scopus 로고    scopus 로고
    • Acquisition Management System, 2007, (Last accessed, April, 2007), http://www.ams.mod.uk/content/topics/pages/2584p.htm
    • Acquisition Management System, 2007, (Last accessed, April, 2007), http://www.ams.mod.uk/content/topics/pages/2584p.htm
  • 26
    • 84885284984 scopus 로고    scopus 로고
    • Lifecycle Management and the Impact of Obsolescence on Military Systems
    • Last accessed, April
    • Young, D., 2003, "Lifecycle Management and the Impact of Obsolescence on Military Systems", (Last accessed, April, 2007), http://www.vmecritical.com/columns/military/2003.08/
    • (2003)
    • Young, D.1
  • 27
    • 27744452364 scopus 로고    scopus 로고
    • Singh, P and Sandbom, P., 2005, Forecasting Technology Insertion Concurrent with Design Refresh Planning for COTS-Based Electronic Systems, Proceedings and Annual of Reliability and Maintainability Symposium, pp. 349- 354, ISBN: 0-7803-8824-0.
    • Singh, P and Sandbom, P., 2005, "Forecasting Technology Insertion Concurrent with Design Refresh Planning for COTS-Based Electronic Systems", Proceedings and Annual of Reliability and Maintainability Symposium, pp. 349- 354, ISBN: 0-7803-8824-0.
  • 28
    • 23744483570 scopus 로고    scopus 로고
    • Object-Oriented Framework for Durability Assessment and Life Cycle Costing of Highway Bridges
    • Ugwua, O.O., Kumaraswamya, T, M.M., Kung, F. and Ng, S.T., 2005, "Object-Oriented Framework for Durability Assessment and Life Cycle Costing of Highway Bridges", Automation in Construction, Vol. 14, pp. 611- 632.
    • (2005) Automation in Construction , vol.14 , pp. 611-632
    • Ugwua, O.O.1    Kumaraswamya, T.M.M.2    Kung, F.3    Ng, S.T.4
  • 29
    • 84885264134 scopus 로고    scopus 로고
    • lccWare, 2007, (Last accessed, February, 2007), http://www.isograph- software.com/lccWare
    • lccWare, 2007, (Last accessed, February, 2007), http://www.isograph- software.com/lccWare
  • 30
    • 84885267553 scopus 로고    scopus 로고
    • RelexLCC, 2007, ((Last accessed, February, 2007), http://www. relexsoftware.co.uk/
    • RelexLCC, 2007, ((Last accessed, February, 2007), http://www. relexsoftware.co.uk/
  • 31
    • 84885287132 scopus 로고    scopus 로고
    • Vanguard software, 2007, (Last accessed, February, 2007), http://www.vanguardsw.com/
    • Vanguard software, 2007, (Last accessed, February, 2007), http://www.vanguardsw.com/
  • 32
    • 84885254180 scopus 로고    scopus 로고
    • SEER-H and SEER-DFM, 2007, (Last accessed, February, 2007), http://www.galorath.com/
    • SEER-H and SEER-DFM, 2007, (Last accessed, February, 2007), http://www.galorath.com/
  • 36
    • 84885281346 scopus 로고    scopus 로고
    • Wiggins, J.F. and Graveline, W., 2000, Defence Acquisitions: Air Force Operating and Support Cost Reductions Need Higher Priority, A Report for the United States General Accounting Office (GAO/NSIAD-00-165), 08/2000.
    • Wiggins, J.F. and Graveline, W., 2000, Defence Acquisitions: Air Force Operating and Support Cost Reductions Need Higher Priority, A Report for the United States General Accounting Office (GAO/NSIAD-00-165), 08/2000.
  • 37
    • 2442500784 scopus 로고    scopus 로고
    • The Use of Lifetime Distributions in Bridge Maintenance and Replacement Modelling
    • Van Noortwijk, J.M. and Klatter, H.E., 2004, "The Use of Lifetime Distributions in Bridge Maintenance and Replacement Modelling", Computers and Structures, Vol. 82, pp.1091 1099.
    • (2004) Computers and Structures , vol.82 , pp. 1091-1099
    • Van Noortwijk, J.M.1    Klatter, H.E.2
  • 38
    • 0842346787 scopus 로고    scopus 로고
    • Change as a Cost Driver in Defence Procurement
    • Hedvall, M., 2004, "Change as a Cost Driver in Defence Procurement", Defence and Peace Economics, Vol. 15(1), pp. 101-108.
    • (2004) Defence and Peace Economics , vol.15 , Issue.1 , pp. 101-108
    • Hedvall, M.1
  • 39
    • 33646472901 scopus 로고    scopus 로고
    • Electronic Manufacturing and Consumers Confront a Rising Tide of Counterfeit Electronics
    • Pecht, M. and Tiku, S., 2006, "Electronic Manufacturing and Consumers Confront a Rising Tide of Counterfeit Electronics," IEEE Spectrum, Vol.43, No.5, pp.37-46.
    • (2006) IEEE Spectrum , vol.43 , Issue.5 , pp. 37-46
    • Pecht, M.1    Tiku, S.2
  • 41
    • 0034429241 scopus 로고    scopus 로고
    • Herald, T.E., 2000, Technology Refreshment Strategy and Plan for Application in Military Systems a How-to Systems Development Process and Linkage with CAIV, NAECON 2000, Proceedings of the IEEE 2000, pp.729-736.
    • Herald, T.E., 2000, "Technology Refreshment Strategy and Plan for Application in Military Systems a "How-to Systems Development Process" and Linkage with CAIV, NAECON 2000, Proceedings of the IEEE 2000, pp.729-736.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.