-
1
-
-
0242406690
-
Object-oriented modeling and decision support for supply chain
-
Biswas S, Narahari Y (2004) Object-oriented modeling and decision support for supply chain. Eur J Oper Res 153:704-726
-
(2004)
Eur J Oper Res
, vol.153
, pp. 704-726
-
-
Biswas, S.1
Narahari, Y.2
-
2
-
-
1542580427
-
Network-based approach to modeling uncertainty in a supply chain
-
8
-
Blackhurst J, Wu T, O'Grady P (2004) Network-based approach to modeling uncertainty in a supply chain. Int J Prod Res 42(8):1639-1658
-
(2004)
Int J Prod Res
, vol.42
, pp. 1639-1658
-
-
Blackhurst, J.1
Wu, T.2
O'Grady, P.3
-
4
-
-
0036881796
-
Modeling impacts of process architecture on cost and schedule risk in product development
-
4
-
Browning TR, Eppinger SD (2002) Modeling impacts of process architecture on cost and schedule risk in product development. IEEE Trans Eng Manage 49(4):428-442
-
(2002)
IEEE Trans Eng Manage
, vol.49
, pp. 428-442
-
-
Browning, T.R.1
Eppinger, S.D.2
-
5
-
-
33646107079
-
Customer satisfaction through design, manufacturing and supply networks: Introduction to the special issue
-
3
-
Chakravarty A, Kumar KR (2002) Customer satisfaction through design, manufacturing and supply networks: introduction to the special issue. Prod Oper Manage 11(3):289-292
-
(2002)
Prod Oper Manage
, vol.11
, pp. 289-292
-
-
Chakravarty, A.1
Kumar, K.R.2
-
6
-
-
2442589689
-
Modeling team member characteristics for the formation of a multifunctional team in concurrent engineering
-
2
-
Chen SJ, Lin L (2004) Modeling team member characteristics for the formation of a multifunctional team in concurrent engineering. IEEE Trans Eng Manage 51(2):111-124
-
(2004)
IEEE Trans Eng Manage
, vol.51
, pp. 111-124
-
-
Chen, S.J.1
Lin, L.2
-
7
-
-
0036563774
-
Supplier-supplier relationships and their implications for buyer-supplier relationships
-
2
-
Choi TY, Wu Z, Ellram L, Koka BR (2002) Supplier-supplier relationships and their implications for buyer-supplier relationships. IEEE Trans Eng Manage 49(2):119-130
-
(2002)
IEEE Trans Eng Manage
, vol.49
, pp. 119-130
-
-
Choi, T.Y.1
Wu, Z.2
Ellram, L.3
Koka, B.R.4
-
8
-
-
0036132450
-
Computing small-fleet aircraft availabilities including redundancy and spares
-
Cochran JK, Lewis TP (2002) Computing small-fleet aircraft availabilities including redundancy and spares. Comput Oper Res 29:529-540
-
(2002)
Comput Oper Res
, vol.29
, pp. 529-540
-
-
Cochran, J.K.1
Lewis, T.P.2
-
10
-
-
1642278275
-
Forecasting for the ordering and stock-holding of spare parts
-
Eaves AHC, Kingsman BG (2004) Forecasting for the ordering and stock-holding of spare parts. J Oper Res Soc 55:431-437
-
(2004)
J Oper Res Soc
, vol.55
, pp. 431-437
-
-
Eaves, A.H.C.1
Kingsman, B.G.2
-
11
-
-
0032118217
-
Configuring large systems using generative constraint satisfaction
-
4
-
Fleischanderl G, Friedrich GE, Haselböck A, Schreiner H, Stumptner M (1998) Configuring large systems using generative constraint satisfaction. IEEE Intell Syst 13(4):59-68
-
(1998)
IEEE Intell Syst
, vol.13
, pp. 59-68
-
-
Fleischanderl, G.1
Friedrich, G.E.2
Haselböck, A.3
Schreiner, H.4
Stumptner, M.5
-
12
-
-
0242269854
-
Flexibility-driven index for measuring mass customization feasibility on industrialized products
-
8
-
Fogliatto FS, Da Silverira GJC, Royer R (2003) Flexibility-driven index for measuring mass customization feasibility on industrialized products. Int J Prod Res 41(8):1811-1829
-
(2003)
Int J Prod Res
, vol.41
, pp. 1811-1829
-
-
Fogliatto, F.S.1
Da Silverira, G.J.C.2
Royer, R.3
-
13
-
-
0242386658
-
Toward an information systems development acceptance model: The case of object-oriented system development
-
3
-
Hardgrave BC, Johnson RA (2003) Toward an information systems development acceptance model: the case of object-oriented system development. IEEE Trans Eng Manage 50(3):322-336
-
(2003)
IEEE Trans Eng Manage
, vol.50
, pp. 322-336
-
-
Hardgrave, B.C.1
Johnson, R.A.2
-
14
-
-
2442581327
-
An exploration of the adoption of e-auctions in supply management
-
2
-
Hartley JL, Lane MD, Hong Y (2004) An exploration of the adoption of e-auctions in supply management. IEEE Trans Eng Manage 51(2):153-161
-
(2004)
IEEE Trans Eng Manage
, vol.51
, pp. 153-161
-
-
Hartley, J.L.1
Lane, M.D.2
Hong, Y.3
-
15
-
-
5644298657
-
E-Business and supply chain management: An overview and framework
-
4
-
Johnson ME, Whang SJ (2002) e-Business and supply chain management: an overview and framework. Prod Oper Manage 11(4):413-423
-
(2002)
Prod Oper Manage
, vol.11
, pp. 413-423
-
-
Johnson, M.E.1
Whang, S.J.2
-
16
-
-
0038271967
-
Can lean media support knowledge sharing? Investigating a hidden advantage of process improvement
-
2
-
Kock N, Davison R (2003) Can lean media support knowledge sharing? Investigating a hidden advantage of process improvement. IEEE Trans Eng Manage 50(2):151-163
-
(2003)
IEEE Trans Eng Manage
, vol.50
, pp. 151-163
-
-
Kock, N.1
Davison, R.2
-
17
-
-
0442311253
-
Facing the challenges of service automation: An enabler for e-commerce and productivity gain in traditional services
-
4
-
Linton JD (2003) Facing the challenges of service automation: an enabler for e-commerce and productivity gain in traditional services. IEEE Trans Eng Manage 50(4):478-484
-
(2003)
IEEE Trans Eng Manage
, vol.50
, pp. 478-484
-
-
Linton, J.D.1
-
19
-
-
0038610816
-
Managing modularity of product architectures: Toward an integrated theory
-
2
-
Mikkola JH, Gassmann O (2003) Managing modularity of product architectures: toward an integrated theory. IEEE Trans Eng Manage 50(2):204-218
-
(2003)
IEEE Trans Eng Manage
, vol.50
, pp. 204-218
-
-
Mikkola, J.H.1
Gassmann, O.2
-
20
-
-
0242333985
-
Examining a curvilinear relationship between communication frequency and team performance in cross-functional project teams
-
3
-
Patrashkova-Volzdoska RR, McComb SA, Green SG, Compton WD (2003) Examining a curvilinear relationship between communication frequency and team performance in cross-functional project teams. IEEE Trans Eng Manage 50(3):262-269
-
(2003)
IEEE Trans Eng Manage
, vol.50
, pp. 262-269
-
-
Patrashkova-Volzdoska, R.R.1
McComb, S.A.2
Green, S.G.3
Compton, W.D.4
-
21
-
-
0042913187
-
Fast simulations of large-scale highly congested systems
-
3
-
Schruben LW, Roeder TM (2003) Fast simulations of large-scale highly congested systems. Simulation 79(3):115-125
-
(2003)
Simulation
, vol.79
, pp. 115-125
-
-
Schruben, L.W.1
Roeder, T.M.2
-
22
-
-
0036704311
-
Aligning supply chain management characteristics and interorganizational information system types: An exploratory study
-
3
-
Shah R, Goldstein SM, Ward PT (2002) Aligning supply chain management characteristics and interorganizational information system types: an exploratory study. IEEE Trans Eng Manage 49(3):282-292
-
(2002)
IEEE Trans Eng Manage
, vol.49
, pp. 282-292
-
-
Shah, R.1
Goldstein, S.M.2
Ward, P.T.3
-
23
-
-
3943065024
-
Optimal modes and levels of integration, and the identification of cross-functional coordination deficiencies in concurrent engineering
-
3
-
Sherman JD (2004) Optimal modes and levels of integration, and the identification of cross-functional coordination deficiencies in concurrent engineering. IEEE Trans Eng Manage 51(3):268-278
-
(2004)
IEEE Trans Eng Manage
, vol.51
, pp. 268-278
-
-
Sherman, J.D.1
-
24
-
-
3042692204
-
Survey on the use of simulation for manufacturing system design and operation
-
2
-
Smith JS (2003) Survey on the use of simulation for manufacturing system design and operation. J Manuf Syst 22(2):157-171
-
(2003)
J Manuf Syst
, vol.22
, pp. 157-171
-
-
Smith, J.S.1
-
25
-
-
0037934558
-
Interactive R&D portfolio analysis with project interdependencies and time profiles of multiple objectives
-
2
-
Stummer C, Heidenberger K (2003) Interactive R&D portfolio analysis with project interdependencies and time profiles of multiple objectives. IEEE Trans Eng Manage 50(2):175-183
-
(2003)
IEEE Trans Eng Manage
, vol.50
, pp. 175-183
-
-
Stummer, C.1
Heidenberger, K.2
-
26
-
-
2442420109
-
Inventory strategies for systems with fast remanufacturing
-
Teunter R, van der Laan E, Vlachos D (2004) Inventory strategies for systems with fast remanufacturing. J Oper Res Soc 55:475-484
-
(2004)
J Oper Res Soc
, vol.55
, pp. 475-484
-
-
Teunter, R.1
Van Der Laan, E.2
Vlachos, D.3
-
27
-
-
0032295859
-
Virtual prototyping for customized product development
-
6
-
Tseng MM, Jiao J, Su CJ (1998) Virtual prototyping for customized product development. Integr Manuf Syst 9(6):334-343
-
(1998)
Integr Manuf Syst
, vol.9
, pp. 334-343
-
-
Tseng, M.M.1
Jiao, J.2
Su, C.J.3
-
28
-
-
0036704308
-
An exploratory investigation of the effects of supply chain complexity on delivery performance
-
3
-
Vachon S, Klassen RD (2002) An exploratory investigation of the effects of supply chain complexity on delivery performance. IEEE Trans Eng Manage 49(3):218-230
-
(2002)
IEEE Trans Eng Manage
, vol.49
, pp. 218-230
-
-
Vachon, S.1
Klassen, R.D.2
-
29
-
-
0034774160
-
Logistic control for fully automated large scale freight transport systems; Event based control for the underground logistic system schiphol
-
Verbraeck A, Versteegt C (2001) Logistic control for fully automated large scale freight transport systems; event based control for the underground logistic system schiphol. In: 2001 IEEE intelligent transportation systems conference proceedings
-
(2001)
2001 IEEE Intelligent Transportation Systems Conference Proceedings
-
-
Verbraeck, A.1
Versteegt, C.2
-
30
-
-
0037109610
-
Emerging trends in large-scale supply chain management
-
15
-
Villa A (2002) Emerging trends in large-scale supply chain management. Int J Prod Res 40(15):3487-3498
-
(2002)
Int J Prod Res
, vol.40
, pp. 3487-3498
-
-
Villa, A.1
-
31
-
-
0242269897
-
Continuous-time dynamic modeling of variable lead times
-
12
-
Wikner J (2003) Continuous-time dynamic modeling of variable lead times. Int J Prod Res 41(12):2787-2798
-
(2003)
Int J Prod Res
, vol.41
, pp. 2787-2798
-
-
Wikner, J.1
|