메뉴 건너뛰기




Volumn 3, Issue 5, 2008, Pages 610-624

Stochastic models for reliable and unreliable flexible manufacturing cells with two machines and two robots

Author keywords

Failure analysis; FMC productivity; Manufacturing cells; Stochastic modelling

Indexed keywords

AUTOMATION; FAILURE ANALYSIS; FLEXIBLE MANUFACTURING SYSTEMS; MARKOV PROCESSES; MATERIALS HANDLING; MATHEMATICAL MODELS; NUMERICAL METHODS; RANDOM PROCESSES; ROBOTICS;

EID: 44349159510     PISSN: 17485037     EISSN: 17485045     Source Type: Journal    
DOI: 10.1504/IJISE.2008.018235     Document Type: Article
Times cited : (24)

References (22)
  • 1
    • 42649135470 scopus 로고    scopus 로고
    • Simulation of tool change policies in a flexible manufacturing cell
    • Abdulmalek, F., Savsar, M. and Aldaihani, M. (2004) ‘Simulation of tool change policies in a flexible manufacturing cell’, WSEAS Transactions on Systems, Vol. 7, No. 3, pp.2546–2552.
    • (2004) WSEAS Transactions on Systems , vol.7 , Issue.3 , pp. 2546-2552
    • Abdulmalek, F.1    Savsar, M.2    Aldaihani, M.3
  • 2
    • 3242707580 scopus 로고    scopus 로고
    • Part batching and scheduling in a flexible cell to minimize setup costs
    • Agnetis, A., Alfieri, A. and Nicosia, G. (2003) ‘Part batching and scheduling in a flexible cell to minimize setup costs’, Journal of Scheduling, Vol. 6, No. 1, pp.87–108.
    • (2003) Journal of Scheduling , vol.6 , Issue.1 , pp. 87-108
    • Agnetis, A.1    Alfieri, A.2    Nicosia, G.3
  • 3
    • 28044470318 scopus 로고    scopus 로고
    • A stochastic model for the analysis of a two-machine flexible manufacturing cell
    • Aldaihani, M. and Savsar, M. (2005) ‘A stochastic model for the analysis of a two-machine flexible manufacturing cell’, Computers and Industrial Engineering, Vol. 49, No. 4, pp. 600–610.
    • (2005) Computers and Industrial Engineering , vol.49 , Issue.4 , pp. 600-610
    • Aldaihani, M.1    Savsar, M.2
  • 4
    • 0343699912 scopus 로고
    • Design of a scheduling system for flexible manufacturing cells
    • Chan, D. and Bedworth, D.D. (1990) ‘Design of a scheduling system for flexible manufacturing cells’, International Journal of Production Research, Vol. 28, pp.2037–2049.
    • (1990) International Journal of Production Research , vol.28 , pp. 2037-2049
    • Chan, D.1    Bedworth, D.D.2
  • 5
    • 0030372389 scopus 로고    scopus 로고
    • Performance evaluation of a flexible manufacturing cell (FMC) by computer simulation
    • Cogun, C. and Savsar, M. (1996) ‘Performance evaluation of a flexible manufacturing cell (FMC) by computer simulation’, Modeling Measurement, and Control B, Vol. 62, No. 2, pp.31–44.
    • (1996) Modeling Measurement, and Control B , vol.62 , Issue.2 , pp. 31-44
    • Cogun, C.1    Savsar, M.2
  • 6
    • 85087229082 scopus 로고    scopus 로고
    • Using simulation to support implementation of flexible manufacturing cell
    • Orlando, FL, USA
    • Farahmand, K. (2000) ‘Using simulation to support implementation of flexible manufacturing cell’, Winter Simulation Conference Proceedings, Orlando, FL, USA, p.2.
    • (2000) Winter Simulation Conference Proceedings , pp. 2
    • Farahmand, K.1
  • 7
    • 33846053575 scopus 로고    scopus 로고
    • Scheduling in a three-machine robotic flexible manufacturing cell
    • Gultekin, H., Akturk, M.S. and Karasan, O.E. (2007) ‘Scheduling in a three-machine robotic flexible manufacturing cell’, Computers and Operations Research, Vol. 34, No. 8, p.2463.
    • (2007) Computers and Operations Research , vol.34 , Issue.8 , pp. 2463
    • Gultekin, H.1    Akturk, M.S.2    Karasan, O.E.3
  • 8
    • 0025640439 scopus 로고
    • Evaluation of FMS parameters on overall system parameters
    • Henneke, M.J. and Choi, R.H. (1990) ‘Evaluation of FMS parameters on overall system parameters’, Computers and Industrial Engineering, Vol. 18, pp.105–110.
    • (1990) Computers and Industrial Engineering , vol.18 , pp. 105-110
    • Henneke, M.J.1    Choi, R.H.2
  • 9
    • 0343854912 scopus 로고
    • Operations scheduling for work transportation by industrial robots in automated manufacturing systems
    • Hitomi, K. and Yoshimura, M. (1986) ‘Operations scheduling for work transportation by industrial robots in automated manufacturing systems’, Material Flow, Vol. 3, pp.131–139.
    • (1986) Material Flow , vol.3 , pp. 131-139
    • Hitomi, K.1    Yoshimura, M.2
  • 10
    • 85093706197 scopus 로고    scopus 로고
    • Is there a new manufacturing paradigm?
    • Hogan, B.J. (2005) ‘Is there a new manufacturing paradigm?’ Manufacturing Engineering, Vol. 11, p.10.
    • (2005) Manufacturing Engineering , vol.11 , pp. 10
    • Hogan, B.J.1
  • 13
    • 0026947210 scopus 로고
    • A stochastic model for a machining cell with tool failure and tool replacement considerations
    • Koulamas, C.P. (1992) ‘A stochastic model for a machining cell with tool failure and tool replacement considerations’, Computers and Operations Research, Vol. 19, pp.717–729.
    • (1992) Computers and Operations Research , vol.19 , pp. 717-729
    • Koulamas, C.P.1
  • 14
    • 0036734054 scopus 로고    scopus 로고
    • A multi-objective model for the allocation of pallets in a flexible manufacturing cell
    • Lashkari, R.S., Balakrishnan, B. and Dutta, S.P. (2002) ‘A multi-objective model for the allocation of pallets in a flexible manufacturing cell’, International Journal of Industrial Engineering, Vol. 9, No. 3, pp.287–300.
    • (2002) International Journal of Industrial Engineering , vol.9 , Issue.3 , pp. 287-300
    • Lashkari, R.S.1    Balakrishnan, B.2    Dutta, S.P.3
  • 15
    • 84952955816 scopus 로고    scopus 로고
    • A review of literature on manufacturing systems productivity measurements and improvement
    • Muthiah, K.M.N. and Huang, S.H. (2006) ‘A review of literature on manufacturing systems productivity measurements and improvement’, International Journal of Industrial and Systems Engineering, Vol. 1, No. 4, pp.461–484.
    • (2006) International Journal of Industrial and Systems Engineering , vol.1 , Issue.4 , pp. 461-484
    • Muthiah, K.M.N.1    Huang, S.H.2
  • 16
    • 85093705962 scopus 로고    scopus 로고
    • Robot market up
    • Newsdesk (2005) ‘Robot market up’, Manufacturing Engineering, Vol. 10, pp.23–31.
    • (2005) Manufacturing Engineering , vol.10 , pp. 23-31
  • 17
    • 33748962343 scopus 로고    scopus 로고
    • Evaluation of entropy-based dispatching in flexible manufacturing systems
    • Piplani, R. and Wetjens, D. (2007) ‘Evaluation of entropy-based dispatching in flexible manufacturing systems’, European Journal of Operational Research, Vol. 176, No. 1, p.317.
    • (2007) European Journal of Operational Research , vol.176 , Issue.1 , pp. 317
    • Piplani, R.1    Wetjens, D.2
  • 18
    • 40749149746 scopus 로고    scopus 로고
    • Machine group selection in a flexible manufacturing cell using diagraph and matrix methods
    • Rao, R.V. (2006) ‘Machine group selection in a flexible manufacturing cell using diagraph and matrix methods’, International Journal of Industrial and Systems Engineering, Vol. 1, No. 4, pp.502–518.
    • (2006) International Journal of Industrial and Systems Engineering , vol.1 , Issue.4 , pp. 502-518
    • Rao, R.V.1
  • 19
    • 0034135357 scopus 로고    scopus 로고
    • Reliability analysis of a flexible manufacturing cell
    • Savsar, M. (2000) ‘Reliability analysis of a flexible manufacturing cell’, Reliability Engineering and System Safety, Vol. 67, pp.147–132.
    • (2000) Reliability Engineering and System Safety , vol.67 , pp. 147-1132
    • Savsar, M.1
  • 20
    • 85093706253 scopus 로고    scopus 로고
    • Modeling of machine failures in a flexible manufacturing cell with two machines served by a robot
    • to appear
    • Savsar, M. and Aldaihani, M. (to appear) ‘Modeling of machine failures in a flexible manufacturing cell with two machines served by a robot’, Reliability Engineering and System Safety.
    • Reliability Engineering and System Safety
    • Savsar, M.1    Aldaihani, M.2
  • 21
    • 0027558003 scopus 로고
    • Stochastic modeling and comparisons of two flexible manufacturing cells with single and double gripper robots
    • Savsar, M. and Cogun, C. (1993) ‘Stochastic modeling and comparisons of two flexible manufacturing cells with single and double gripper robots’, International Journal of Production Research, Vol. 31, pp.633–645.
    • (1993) International Journal of Production Research , vol.31 , pp. 633-645
    • Savsar, M.1    Cogun, C.2
  • 22
    • 0034769420 scopus 로고    scopus 로고
    • A longitudinal study of a flexible manufacturing cell
    • Sohal, A.S., Fitzpatrick, P. and Power, D. (2001) ‘A longitudinal study of a flexible manufacturing cell’, Integrated Manufacturing Systems, Vol. 12, No. 4, pp.236–245.
    • (2001) Integrated Manufacturing Systems , vol.12 , Issue.4 , pp. 236-245
    • Sohal, A.S.1    Fitzpatrick, P.2    Power, D.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.