메뉴 건너뛰기




Volumn 32, Issue 8, 2008, Pages 10-13

Emergency management for the ice disaster in power grids and some suggestions

Author keywords

Break down; Contingency analysis; Ice disaster; Power grid emergency management

Indexed keywords

DISASTERS; ELECTRIC LINES; ELECTRIC POWER TRANSMISSION NETWORKS; FREEZING;

EID: 43749103808     PISSN: 10001026     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (38)

References (11)
  • 1
    • 4644267563 scopus 로고    scopus 로고
    • Final report on the August 14, 2003 blackout in the United States and Canada: Causes and recommendations
    • US-Canada Power System Outage Task Force
    • US-Canada Power System Outage Task Force. Final report on the August 14, 2003 blackout in the United States and Canada: Causes and Recommendations. 2004.
    • (2004)
  • 2
    • 33747065679 scopus 로고    scopus 로고
    • After the 2003 blackouts across several continentals
    • GAN Deqiang, HU Jiangyi, HAN Zhenxiang. After the 2003 blackouts across several continentals. Automation of Electric Power Systems, 2004, 28(3): 1-4, 9.
    • (2004) Automation of Electric Power Systems , vol.28 , Issue.3
    • Gan, D.1    Hu, J.2    Han, Z.3
  • 4
    • 43749119749 scopus 로고    scopus 로고
    • Analysis of the Apr. 28 fault on North China power system
    • ZHOU Xinfeng, SHI Guirong, ZHAO Gang. Analysis of the Apr. 28 fault on North China power system. Automation of Electric Power Systems, 2000, 24(12): 61-64.
    • (2000) Automation of Electric Power Systems , vol.24 , Issue.12 , pp. 61-64
    • Zhou, X.1    Shi, G.2    Zhao, G.3
  • 5
    • 43749094471 scopus 로고    scopus 로고
    • Analysis of central China power system accident on January 17, 2000
    • ZHANG Dequan, WANG Chunming, YANG Gang, et al. Analysis of central China power system accident on January 17, 2000. Automation of Electric Power Systems, 2000, 24(21): 61-63.
    • (2000) Automation of Electric Power Systems , vol.24 , Issue.21 , pp. 61-63
    • Zhang, D.1    Wang, C.2    Yang, G.3
  • 6
    • 33645652242 scopus 로고    scopus 로고
    • Review of blackout in Hainan on September 26th-causes and recommendations
    • TANG Siqing, ZHANG Mi, LI Jianshe, et al. Review of blackout in Hainan on September 26th-causes and recommendations. Automation of Electric Power Systems, 2006, 30(1): 1-7.
    • (2006) Automation of Electric Power Systems , vol.30 , Issue.1 , pp. 1-7
    • Tang, S.1    Zhang, M.2    Li, J.3
  • 7
    • 0348233153 scopus 로고    scopus 로고
    • The way from a simple contingency to system-wide disaster lesson from the eastern interconnection blackout in 2003
    • XUE Yusheng. The way from a simple contingency to system-wide disaster lesson from the eastern interconnection blackout in 2003. Automation of Electric Power Systems, 2003, 27(18): 1-5, 37.
    • (2003) Automation of Electric Power Systems , vol.27 , Issue.18
    • Xue, Y.1
  • 8
    • 33644933621 scopus 로고    scopus 로고
    • Space-time cooperative framework for defending blackouts: Part I From isolated defense lines to coordinated defending
    • XUE Yusheng. Space-time cooperative framework for defending blackouts: Part I From isolated defense lines to coordinated defending. Automation of Electric Power Systems, 2006, 30(1): 8-16.
    • (2006) Automation of Electric Power Systems , vol.30 , Issue.1 , pp. 8-16
    • Xue, Y.1
  • 9
    • 2342434260 scopus 로고    scopus 로고
    • Draw lessons from large scope blackout of interconnected North American Power Grid
    • ZHOU Xiaoxin, ZHENG Jianchao, SHEN Guorong, et al. Draw lessons from large scope blackout of interconnected North American Power Grid. Power System Technology, 2003, 27(9): 1.
    • (2003) Power System Technology , vol.27 , Issue.9 , pp. 1
    • Zhou, X.1    Zheng, J.2    Shen, G.3
  • 10
    • 19044388727 scopus 로고    scopus 로고
    • Summary on power system security problems on 2004 IEEE PES Meeting and Recommendations for Developing Defense Measures
    • FU Shuti. Summary on power system security problems on 2004 IEEE PES Meeting and Recommendations for Developing Defense Measures. Automation of Electric Power Systems, 2005, 29(8): 1-4.
    • (2005) Automation of Electric Power Systems , vol.29 , Issue.8 , pp. 1-4
    • Fu, S.1
  • 11
    • 3142712567 scopus 로고    scopus 로고
    • To focus on improving power system reliability: A pondering over the east North-America major blackout
    • GUO Yongji. To focus on improving power system reliability: a pondering over the east North-America major blackout. Automation of Electric Power Systems, 2003, 27(19): 1-5.
    • (2003) Automation of Electric Power Systems , vol.27 , Issue.19 , pp. 1-5
    • Guo, Y.1