메뉴 건너뛰기




Volumn 57, Issue 3, 2008, Pages 195-202

Ex-post evaluation of a water distribution network upgrading project

Author keywords

Cost benefit analysis; Water distribution network upgrading project

Indexed keywords

COST BENEFIT ANALYSIS; MATHEMATICAL MODELS; PRESSURE REGULATION; PROJECT MANAGEMENT; VALVES (MECHANICAL);

EID: 43649103533     PISSN: 00037214     EISSN: None     Source Type: Journal    
DOI: 10.2166/aqua.2008.087     Document Type: Review
Times cited : (8)

References (13)
  • 1
    • 43649083957 scopus 로고
    • Network maintenance through analysis of the cost of water
    • Cabrera, E., Andres, F. & Planells, F. 1995 Network maintenance through analysis of the cost of water. J. AWWA 87(7), 686-698.
    • (1995) J. AWWA , vol.87 , Issue.7 , pp. 686-698
    • Cabrera, E.1    Andres, F.2    Planells, F.3
  • 2
    • 0019632058 scopus 로고
    • Analytical cost model for urban water supply
    • Clark, R. M. & Stevie, R. G. 1981 Analytical cost model for urban water supply. J. WRPM ASCE 107(2), 437-452.
    • (1981) J. WRPM ASCE , vol.107 , Issue.2 , pp. 437-452
    • Clark, R.M.1    Stevie, R.G.2
  • 3
    • 0024702168 scopus 로고
    • Developing a data base on infrastructure needs
    • Clark, R. M. & Goodrich, J. 1989 Developing a data base on infrastructure needs. J. AWWA 81(7), 81-87.
    • (1989) J. AWWA , vol.81 , Issue.7 , pp. 81-87
    • Clark, R.M.1    Goodrich, J.2
  • 4
    • 0020335791 scopus 로고
    • Water distribution systems: A spatial and cost evaluation
    • Clark, R. M., Stafford, C. L. & Goodrich, J. A. 1981 Water distribution systems: a spatial and cost evaluation. J. WRPM, ASCE 108(3), 243-256.
    • (1981) J. WRPM, ASCE , vol.108 , Issue.3 , pp. 243-256
    • Clark, R.M.1    Stafford, C.L.2    Goodrich, J.A.3
  • 5
    • 43649098777 scopus 로고    scopus 로고
    • EYATh S. A. records 1999-2006: Projects, statements and other internal records.
    • EYATh S. A. records 1999-2006: Projects, statements and other internal records.
  • 6
    • 0023959974 scopus 로고
    • Spatial and temporal groupings of water main pipe breakage in Winnipeg
    • Goulter, I. & Kazemi, A. 1988 Spatial and temporal groupings of water main pipe breakage in Winnipeg. J. Can. Civil Eng. 15(1), 91-97.
    • (1988) J. Can. Civil Eng , vol.15 , Issue.1 , pp. 91-97
    • Goulter, I.1    Kazemi, A.2
  • 7
    • 0027628296 scopus 로고
    • Predicting water-main breakage rates
    • Goulter, I., Davidson, J. & Jacobs, P. 1993 Predicting water-main breakage rates. J. WRPM ASCE 119(4), 419-436.
    • (1993) J. WRPM ASCE , vol.119 , Issue.4 , pp. 419-436
    • Goulter, I.1    Davidson, J.2    Jacobs, P.3
  • 8
    • 0034793804 scopus 로고    scopus 로고
    • The role of leaks and breaks in water networks - technical and economical solutions
    • Kanakoudis, V. & Tolikas, D. 2001 The role of leaks and breaks in water networks - technical and economical solutions. J. WSRT-AQUA 50(5), 301-311.
    • (2001) J. WSRT-AQUA , vol.50 , Issue.5 , pp. 301-311
    • Kanakoudis, V.1    Tolikas, D.2
  • 9
    • 0022077716 scopus 로고
    • An analysis of pipe breakage in urban water distribution networks
    • Kettler, A. & Goulter, I. 1985 An analysis of pipe breakage in urban water distribution networks. J. Can. Civil Eng. 12(2), 286-293.
    • (1985) J. Can. Civil Eng , vol.12 , Issue.2 , pp. 286-293
    • Kettler, A.1    Goulter, I.2
  • 10
    • 0003141573 scopus 로고
    • Establishing priorities for replacement of distribution facilities
    • Lane, P. H. & Buehring, N. L. 1978 Establishing priorities for replacement of distribution facilities. J. AWWA 70(7), 355-357.
    • (1978) J. AWWA , vol.70 , Issue.7 , pp. 355-357
    • Lane, P.H.1    Buehring, N.L.2
  • 11
    • 0020205298 scopus 로고
    • Organizing and analyzing leak and break data for making main replacement decisions
    • O'Day, D. K. 1982 Organizing and analyzing leak and break data for making main replacement decisions. J. AWWA 74(11), 589-596.
    • (1982) J. AWWA , vol.74 , Issue.11 , pp. 589-596
    • O'Day, D.K.1
  • 12
    • 0018318075 scopus 로고
    • An analytic approach to scheduling pipe replacement
    • Shamir, U. & Howard, C. D. 1979 An analytic approach to scheduling pipe replacement. J. AWWA 71(5), 248-258.
    • (1979) J. AWWA , vol.71 , Issue.5 , pp. 248-258
    • Shamir, U.1    Howard, C.D.2
  • 13
    • 0020098396 scopus 로고
    • Economic analysis of water main breaks
    • Walski, T. M. & Pelliccia, A. 1982 Economic analysis of water main breaks. J. AWWA 74(3), 140-147.
    • (1982) J. AWWA , vol.74 , Issue.3 , pp. 140-147
    • Walski, T.M.1    Pelliccia, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.