메뉴 건너뛰기




Volumn 101, Issue 4, 2004, Pages 37-58

Implementing the continuous commissioning process in retrofit projects

Author keywords

[No Author keywords available]

Indexed keywords

BUILDING SYSTEM CONTROL; BUILDING SYSTEM OPERATIONS; COMMERCIAL BUILDINGS; CONTINUOUS COMMISSIONING PROCESS; ENERGY SAVINGS; INSTITUTIONAL BUILDINGS; RETROFIT PROJECTS;

EID: 4344708189     PISSN: 01998595     EISSN: 15460118     Source Type: Journal    
DOI: 10.1080/01998590409509272     Document Type: Article
Times cited : (3)

References (5)
  • 2
    • 0001962695 scopus 로고    scopus 로고
    • Can You Achieve 150 percent of Predicted Retrofit Savings: Is It Time for Recommissioning?
    • Operation and Maintenance, American Council for an Energy Efficient Economy, Washington, D.C
    • Claridge D.E., Haberl J., Liu M., Houcek J., and Athar A., “Can You Achieve 150 percent of Predicted Retrofit Savings: Is It Time for Recommissioning?” ACEEE 1994 Summer Study on Energy Efficiency In Buildings Proceedings: Commissioning, Operation and Maintenance, Vol. 5, pp. 73-87, American Council for an Energy Efficient Economy, Washington, D.C.
    • ACEEE 1994 Summer Study on Energy Efficiency in Buildings Proceedings: Commissioning , vol.5 , pp. 73-87
    • Claridge, D.E.1    Haberl, J.2    Liu, M.3    Houcek, J.4    Athar, A.5
  • 3
    • 0032671024 scopus 로고    scopus 로고
    • Improving Building Energy System Performance by Continuous Commissioning
    • Liu M., Claridge D.E., and Turner W.D., 1999, “Improving Building Energy System Performance by Continuous Commissioning,” Energy Engineering, Vol. 96, No. 5, pp. 46-57.
    • (1999) Energy Engineering , vol.96 , Issue.5 , pp. 46-57
    • Liu, M.1    Claridge, D.E.2    Turner, W.D.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.