-
1
-
-
0002016604
-
A simulation study of FMS tool allocation procedures
-
AMOAKO-GYAMPAH, K. and MEREDITH, J., 1996, A simulation study of FMS tool allocation procedures. Journal of Manufacturing Systems, 15, 419-431.
-
(1996)
Journal of Manufacturing Systems
, vol.15
, pp. 419-431
-
-
Amoako-Gyampah, K.1
Meredith, J.2
-
2
-
-
0006606816
-
FMS loading in presence of tool sharing
-
Capri, Italy
-
COLOSIMO, B. M., CONTI, C., GRIECO, A. and TOLIO, T., 1998, FMS loading in presence of tool sharing. Proceedings of the ICME-CIRP International Seminar on Intelligent Computation in Manufacturing Engineering, Capri, Italy, pp. 137-144.
-
(1998)
Proceedings of the ICME-CIRP International Seminar on Intelligent Computation in Manufacturing Engineering
, pp. 137-144
-
-
Colosimo, B.M.1
Conti, C.2
Grieco, A.3
Tolio, T.4
-
3
-
-
84870875371
-
APPG: A method to automatically transform a linear part program in a network part program
-
Bari, Italy
-
COLOSIMO, B. M., IMBERTI, L. and TOLIO, T., 2001, APPG: a method to automatically transform a linear part program in a network part program. Proceedings of the AITEM, Bari, Italy.
-
(2001)
Proceedings of the AITEM
-
-
Colosimo, B.M.1
Imberti, L.2
Tolio, T.3
-
4
-
-
4344598927
-
APPG1: A new approach for alternative process plans generation
-
Leuven, Belgium
-
COLOSIMO, B. M., PELLIZZARO, M., SEMERARO, Q. and TOLIO, T., 1999, APPG1: a new approach for alternative process plans generation. Proceedings of the 32nd CIRP International Seminar on Manufacturing Systems, Leuven, Belgium.
-
(1999)
Proceedings of the 32nd CIRP International Seminar on Manufacturing Systems
-
-
Colosimo, B.M.1
Pellizzaro, M.2
Semeraro, Q.3
Tolio, T.4
-
5
-
-
1542401340
-
Rule based system for non linear process plan generation
-
COLOSIMO, B. M., SEMERARO, Q. and TOLIO, T., 2000, Rule based system for non linear process plan generation. Studies in Informatics and Control, 9, 133-143.
-
(2000)
Studies in Informatics and Control
, vol.9
, pp. 133-143
-
-
Colosimo, B.M.1
Semeraro, Q.2
Tolio, T.3
-
6
-
-
0031095154
-
Tool-provisioning strategies for flexible manufacturing systems
-
DE SOUZA, R., 1997, Tool-provisioning strategies for flexible manufacturing systems. Robotics and Computer-Integrated Manufacturing, 13, 31-39.
-
(1997)
Robotics and Computer-integrated Manufacturing
, vol.13
, pp. 31-39
-
-
De Souza, R.1
-
7
-
-
0000329136
-
Simulation of tool and part flow in FMSs
-
GRIECO, A., SEMERARO, Q., TOLIO, T. and TOMA, S., 1995, Simulation of tool and part flow in FMSs. International Journal of Production Research, 33, 643-658.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 643-658
-
-
Grieco, A.1
Semeraro, Q.2
Tolio, T.3
Toma, S.4
-
9
-
-
0029760756
-
Analysis of tool sharing in an FMS: A simulation study
-
KASHYAP, A. and KHATOR, S., 1996, Analysis of tool sharing in an FMS: a simulation study. Computers in Industrial Engineering, 30, 137-145.
-
(1996)
Computers in Industrial Engineering
, vol.30
, pp. 137-145
-
-
Kashyap, A.1
Khator, S.2
-
10
-
-
0033099219
-
Real-time operation and tool selection in single stage multimachine systems
-
Koo, P. H. and TANCHOCO, J. M. A., 1999, Real-time operation and tool selection in single stage multimachine systems. International Journal of Production Research, 37, 1023-1040.
-
(1999)
International Journal of Production Research
, vol.37
, pp. 1023-1040
-
-
Koo, P.H.1
Tanchoco, J.M.A.2
-
11
-
-
0032095740
-
Estimation of tool requirements in single-stage multimachine systems
-
Koo, P. H., TANCHOCO, J. M. A. and TALAVAGE, J. J. T., 1998, Estimation of tool requirements in single-stage multimachine systems. International Journal of Production Research, 36, 1699-1713.
-
(1998)
International Journal of Production Research
, vol.36
, pp. 1699-1713
-
-
Koo, P.H.1
Tanchoco, J.M.A.2
Talavage, J.J.T.3
-
12
-
-
0031332099
-
Tool planning models for flexible manufacturing systems
-
MAHAMED, Z. and BERNARDO, J., 1997, Tool planning models for flexible manufacturing systems. European Journal of Operational Research, 103, 497-514.
-
(1997)
European Journal of Operational Research
, vol.103
, pp. 497-514
-
-
Mahamed, Z.1
Bernardo, J.2
-
13
-
-
84890453833
-
A simulation study of tool management policy in FMS with network part program
-
Reconfigurable Manufacturing, Michigan, USA
-
MATTA, A. and TOLIO, T., 2001, A simulation study of tool management policy in FMS with network part program. Proceedings of the CIRP International Conference on Agile, Reconfigurable Manufacturing, Michigan, USA.
-
(2001)
Proceedings of the CIRP International Conference on Agile
-
-
Matta, A.1
Tolio, T.2
-
14
-
-
0034499979
-
New policy to manage tools in flexible manufacturing systems using network part programs
-
Boston, MA, USA
-
MATTA, A., TOLIO, T., NUCCI, F. and GRIECO, A., 2000, New policy to manage tools in flexible manufacturing systems using network part programs. Proceedings of the SPIE Conference on Intelligent Systems in Design and Manufacturing III, Boston, MA, USA.
-
(2000)
Proceedings of the SPIE Conference on Intelligent Systems in Design and Manufacturing III
-
-
Matta, A.1
Tolio, T.2
Nucci, F.3
Grieco, A.4
-
15
-
-
4344594159
-
Analysis of the average idle time for lack of tools in FMSs
-
Budapest, Hungary
-
SEMERARO, Q., TOLIO, T. and GRIECO, A., 1997, Analysis of the average idle time for lack of tools in FMSs. Proceedings of the 2nd World Congress on Intelligent Manufacturing Processes & Systems, Budapest, Hungary, pp. 170-175.
-
(1997)
Proceedings of the 2nd World Congress on Intelligent Manufacturing Processes & Systems
, pp. 170-175
-
-
Semeraro, Q.1
Tolio, T.2
Grieco, A.3
-
16
-
-
34248539177
-
Flexibility in manufacturing: A survey
-
SETHI, A. K. and SETHI, S. P., 1990, Flexibility in manufacturing: a survey. International Journal of Flexible Manufacturing Systems, 2, 289-328.
-
(1990)
International Journal of Flexible Manufacturing Systems
, vol.2
, pp. 289-328
-
-
Sethi, A.K.1
Sethi, S.P.2
-
17
-
-
0030673848
-
A method for tooling configuration in integrated manufacturing systems
-
TOLIO, T., COLOSIMO, B. M., SEMERARO, Q. and JOVANE, F., 1997, A method for tooling configuration in integrated manufacturing systems. Proceedings of the CIRP on General Assembly.
-
(1997)
Proceedings of the CIRP on General Assembly
-
-
Tolio, T.1
Colosimo, B.M.2
Semeraro, Q.3
Jovane, F.4
-
18
-
-
0027261737
-
Modeling flexible manufacturing systems based on Petri nets
-
VAN BRUSSEL, H., PENG, Y. and VALCKENAENS, P., 1993, Modeling flexible manufacturing systems based on Petri nets. Annals of CIRP, 42, 479-484.
-
(1993)
Annals of CIRP
, vol.42
, pp. 479-484
-
-
Van Brussel, H.1
Peng, Y.2
Valckenaens, P.3
|