|
Volumn , Issue , 2007, Pages
|
Operations of electric power systems with high penetration of wind power: Risks and possible solutions
|
Author keywords
[No Author keywords available]
|
Indexed keywords
AUTOMATIC GENERATION CONTROL;
INFRASTRUCTURE COST;
INTERMITTENT WIND POWER;
AUTOMATION;
COSTS;
ELECTRIC POWER GENERATION;
RISK ASSESSMENT;
WIND POWER;
ELECTRIC POWER SYSTEM INTERCONNECTION;
|
EID: 42549110324
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.1109/PES.2007.386237 Document Type: Conference Paper |
Times cited : (24)
|
References (11)
|