메뉴 건너뛰기




Volumn 46, Issue 12, 2008, Pages 3259-3295

Two-level hedging point control of a manufacturing system with multiple product-types and uncertain demands

Author keywords

Demand uncertainty; Multiple product type manufacturing system; Prioritised hedging point policy; Two level hedging point control

Indexed keywords

SCHEDULING; SWITCHING;

EID: 42449087387     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540600793471     Document Type: Article
Times cited : (8)

References (18)
  • 1
    • 0022667867 scopus 로고
    • Optimal control of production rate in a failure prone manufacturing system
    • Akella, R. and Kumar, P.R., Optimal control of production rate in a failure prone manufacturing system. IEEE Transactions on Automatic Control, 1986, 31(2), 116-126.
    • (1986) IEEE Transactions on Automatic Control , vol.31 , Issue.2 , pp. 116-126
    • Akella, R.1    Kumar, P.R.2
  • 2
    • 0024037430 scopus 로고
    • Optimality of zero-inventory policies for unreliable manufacturing systems
    • Bielecki, T. and Kumar, P.R., Optimality of zero-inventory policies for unreliable manufacturing systems. Operations Research, 1988, 36(4), 532-541.
    • (1988) Operations Research , vol.36 , Issue.4 , pp. 532-541
    • Bielecki, T.1    Kumar, P.R.2
  • 3
    • 42449085373 scopus 로고    scopus 로고
    • A two-level hedging point policy for controlling a manufacturing system with time-delay, demand uncertainty and extra capacity
    • accepted
    • Chan, F.T.S., Wang, Z. and Zhang, J., A two-level hedging point policy for controlling a manufacturing system with time-delay, demand uncertainty and extra capacity. European Journal of Operational Research, 2005 (accepted).
    • (2005) European Journal of Operational Research
    • Chan, F.T.S.1    Wang, Z.2    Zhang, J.3
  • 4
    • 0036646995 scopus 로고    scopus 로고
    • Optimal threshold control in discrete failure-prone manufacturing systems
    • Feng, Y. and Xiao, B., Optimal threshold control in discrete failure-prone manufacturing systems. IEEE Transactions on Automatic Control, 2002, 47(7), 1167-1174.
    • (2002) IEEE Transactions on Automatic Control , vol.47 , Issue.7 , pp. 1167-1174
    • Feng, Y.1    Xiao, B.2
  • 6
    • 0030721412 scopus 로고    scopus 로고
    • Design and operation of manufacturing system - control- and system-theoretical models and issues
    • Albuquerque, New Mexico
    • Gershwin, S.B., Design and operation of manufacturing system - control- and system-theoretical models and issues, in Proceedings of the American Control Conference, Albuquerque, New Mexico, 1997, pp. 1909-1913.
    • (1997) Proceedings of the American Control Conference , pp. 1909-1913
    • Gershwin, S.B.1
  • 7
    • 0034288452 scopus 로고    scopus 로고
    • Design and operation of manufacturing systems
    • Gershwin, S.B., Design and operation of manufacturing systems. IIE Transactions, 2000, 32, 891-906.
    • (2000) IIE Transactions , vol.32 , pp. 891-906
    • Gershwin, S.B.1
  • 8
    • 0027558877 scopus 로고
    • The queueing equivalence to a manufacturing system with failures
    • Hu, J.Q. and Xiang, D., The queueing equivalence to a manufacturing system with failures. IEEE Transactions on Automatic Control, 1993, 38(3), 499-502.
    • (1993) IEEE Transactions on Automatic Control , vol.38 , Issue.3 , pp. 499-502
    • Hu, J.Q.1    Xiang, D.2
  • 9
    • 0020915621 scopus 로고
    • An algorithm for the computer control of a flexible manufacturing system
    • Kimemia, J. and Gershwin, S.B., An algorithm for the computer control of a flexible manufacturing system. IIE Transactions, 1983, 15(4), 353-362.
    • (1983) IIE Transactions , vol.15 , Issue.4 , pp. 353-362
    • Kimemia, J.1    Gershwin, S.B.2
  • 10
    • 0031100305 scopus 로고    scopus 로고
    • Scheduling multiple part-types in an unreliable single-machine manufacturing system
    • Perkins, J.R. and Srikant, R., Scheduling multiple part-types in an unreliable single-machine manufacturing system. IEEE Transaction on Automatic Control, 1997, 42(3), 364-377.
    • (1997) IEEE Transaction on Automatic Control , vol.42 , Issue.3 , pp. 364-377
    • Perkins, J.R.1    Srikant, R.2
  • 11
    • 0032122062 scopus 로고    scopus 로고
    • Hedging policies for failure-prone manufacturing systems: Optimality of JIT and bounds on buffer levels
    • Perkins, J.R. and Srikant, R., Hedging policies for failure-prone manufacturing systems: optimality of JIT and bounds on buffer levels. IEEE Transaction on Automatic Control, 1998, 43(7), 953-957.
    • (1998) IEEE Transaction on Automatic Control , vol.43 , Issue.7 , pp. 953-957
    • Perkins, J.R.1    Srikant, R.2
  • 12
    • 0035279831 scopus 로고    scopus 로고
    • Failure-prone production systems with uncertain demand
    • Perkins, J.R. and Srikant, R., Failure-prone production systems with uncertain demand. IEEE Transactions on Automatic Control, 2001, 46(3), 441-449.
    • (2001) IEEE Transactions on Automatic Control , vol.46 , Issue.3 , pp. 441-449
    • Perkins, J.R.1    Srikant, R.2
  • 13
    • 0027666614 scopus 로고
    • Production control for a tandem two-machine system
    • Van Ryzin, G., Lou, S.X.C. and Gershwin, S.B., Production control for a tandem two-machine system. IIE Transactions, 1993, 25(5), 5-20.
    • (1993) IIE Transactions , vol.25 , Issue.5 , pp. 5-20
    • Van Ryzin, G.1    Lou, S.X.C.2    Gershwin, S.B.3
  • 15
    • 0031652421 scopus 로고    scopus 로고
    • Partial characterisation of optimal hedging point policies in unreliable two-part-type manufacturing systems
    • Srivastan, N. and Dallery, Y., Partial characterisation of optimal hedging point policies in unreliable two-part-type manufacturing systems. Operations Research, 1998, 46(1), 36-45.
    • (1998) Operations Research , vol.46 , Issue.1 , pp. 36-45
    • Srivastan, N.1    Dallery, Y.2
  • 16
    • 0036576750 scopus 로고    scopus 로고
    • Production control of a pull system with production and demand uncertainty
    • Tan, B., Production control of a pull system with production and demand uncertainty. IEEE Transactions on Automatic Control, 2002, 47(5), 779-783.
    • (2002) IEEE Transactions on Automatic Control , vol.47 , Issue.5 , pp. 779-783
    • Tan, B.1
  • 17


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.