메뉴 건너뛰기




Volumn 14, Issue 1, 2008, Pages 59-70

Integrating Six-Sigma with other reliability improvement methods in equipment reliability and maintenance applications

Author keywords

Maintenance reliability; Service improvements; Six sigma

Indexed keywords

ADMINISTRATIVE DATA PROCESSING; DATA REDUCTION; INDUSTRIAL RESEARCH; MAINTAINABILITY; RELIABILITY ANALYSIS;

EID: 41749119620     PISSN: 13552511     EISSN: None     Source Type: Journal    
DOI: 10.1108/13552510810861941     Document Type: Article
Times cited : (36)

References (26)
  • 1
    • 0035194121 scopus 로고    scopus 로고
    • Reliability of sequential systems using the cause-consequence diagram method
    • Andrews, J.D. and Ridley, L.M. (2001), "Reliability of sequential systems using the cause-consequence diagram method", Proceedings of the Institution of Mechanical Engineers, No. 215 Part E, pp. 207-20.
    • (2001) Proceedings of the Institution of Mechanical Engineers , Issue.215 , pp. 207-20
    • Andrews, J.D.1    Ridley, L.M.2
  • 2
    • 0442314766 scopus 로고    scopus 로고
    • What is Six Sigma
    • Bendell, T. (2000), "What is Six Sigma", Quality World, Vol. 26, pp. 14-17.
    • (2000) Quality World , vol.26 , pp. 14-17
    • Bendell, T.1
  • 3
    • 6344270169 scopus 로고    scopus 로고
    • An assessment of RPN prioritization in a failure modes effects and criticality analysis
    • (annual edition)
    • Bowles, J.B. (2004), "An assessment of RPN prioritization in a failure modes effects and criticality analysis", Journal of the IEST, Vol. 47, pp. 51-6 (annual edition).
    • (2004) Journal of the IEST , vol.47 , pp. 51-6
    • Bowles, J.B.1
  • 4
    • 0442279650 scopus 로고    scopus 로고
    • Looking beyond audit-oriented evaluation of gauge repeatability and reproducibility: A case study
    • Dasgupta, T. and Murthy, S.V. (2001), "Looking beyond audit-oriented evaluation of gauge repeatability and reproducibility: a case study", Total Quality Management, Vol. 12 No. 6, pp. 649-55.
    • (2001) Total Quality Management , vol.12 , Issue.6 , pp. 649-55
    • Dasgupta, T.1    Murthy, S.V.2
  • 5
    • 0035101705 scopus 로고    scopus 로고
    • Rotating equipment risk-based assessment and benchmarking
    • Drosjack, M.J. and Tanner, G. (2001), "Rotating equipment risk-based assessment and benchmarking", Hydrocarbon Processing, Vol. 80 No. 1, pp. 38-50.
    • (2001) Hydrocarbon Processing , vol.80 , Issue.1 , pp. 38-50
    • Drosjack, M.J.1    Tanner, G.2
  • 7
    • 5044227167 scopus 로고    scopus 로고
    • Implementing total productive maintenance in Nigerian manufacturing industries
    • Eti, M.C., Ogaji, S.O.T. and Probert, S. (2004), "Implementing total productive maintenance in Nigerian manufacturing industries", Applied Energy, Vol. 79 No. 4, pp. 385-96.
    • (2004) Applied Energy , vol.79 , Issue.4 , pp. 385-96
    • Eti, M.C.1    Ogaji, S.O.T.2    Probert, S.3
  • 8
    • 0034427587 scopus 로고    scopus 로고
    • A knowledge-based system for preventive maintenance
    • Fonseca, D.J. (2000), "A knowledge-based system for preventive maintenance", Expert Systems, Vol. 17 No. 5, pp. 241-7.
    • (2000) Expert Systems , vol.17 , Issue.5 , pp. 241-7
    • Fonseca, D.J.1
  • 11
    • 0442279095 scopus 로고    scopus 로고
    • The role of total productive maintenance in business excellence
    • Hassan, K., Chan, J.F-L. and Metcalfe, A.V. (2000), "The role of total productive maintenance in business excellence", Total Quality Management, Vol. 11 Nos 4/5/6, pp. S596-S601.
    • (2000) Total Quality Management , vol.11 , Issue.456
    • Hassan, K.1    Chan, J.F-L.2    Metcalfe, A.V.3
  • 12
    • 0242273406 scopus 로고    scopus 로고
    • Preventive maintenance of multi-state system with phase-type failure time distribution and non-zero inspection time
    • Hong, Y. (2003), "Preventive maintenance of multi-state system with phase-type failure time distribution and non-zero inspection time", International Journal of Reliability, Quality and Safety Engineering, Vol. 10 No. 3.
    • (2003) International Journal of Reliability, Quality and Safety Engineering , vol.10 , Issue.3
    • Hong, Y.1
  • 14
    • 10844289735 scopus 로고    scopus 로고
    • Maintenance strategy for a coal-based steam power plant equipment: A graph theoretic approach
    • Mohan, M., Gandhi, O.P. and Agrawal, V.P. (2004), "Maintenance strategy for a coal-based steam power plant equipment: a graph theoretic approach", Proceedings of the Institution of Mechanical Engineers, No. 218 Part A: J. Power and Energy, pp. 619-36.
    • (2004) Proceedings of the Institution of Mechanical Engineers , Issue.218 , pp. 619-36
    • Mohan, M.1    Gandhi, O.P.2    Agrawal, V.P.3
  • 16
  • 18
    • 41749119126 scopus 로고    scopus 로고
    • available at: www.lmu.ac.uk/lis/imgtserv/ tools/tools.htm
    • Productivity Tools (2005), available at: www.lmu.ac.uk/lis/imgtserv/ tools/tools.htm.
    • (2005)
    • Tools, P.1
  • 19
    • 0242721745 scopus 로고    scopus 로고
    • Integrating Six-Sigma with total quality management: A case example for measuring medication errors
    • Revere, L. (2000), "Integrating Six-Sigma with total quality management: a case example for measuring medication errors", Journal of Healthcare Management, Vol. 48 No. 6, pp. 377-91.
    • (2000) Journal of Healthcare Management , vol.48 , Issue.6 , pp. 377-91
    • Revere, L.1
  • 20
    • 0035628146 scopus 로고    scopus 로고
    • Individual control schemes for monitoring the mean and variance of processes subject to drifts
    • Reynolds, M.R. Jr and Stoumbos, Z. (2001), "Individual control schemes for monitoring the mean and variance of processes subject to drifts", Stochastic Analysis and Applications, Vol. 19 No. 5, pp. 863-92.
    • (2001) Stochastic Analysis and Applications , vol.19 , Issue.5 , pp. 863-92
    • Jr R., R.M.1    Stoumbos, Z.2
  • 24
    • 26244449279 scopus 로고    scopus 로고
    • Modeling and reasoning for failure modes and effects analysis generation
    • Teoh, P.C. and Case, K. (2004), "Modeling and reasoning for failure modes and effects analysis generation", Proc Instn Mech Engrs, Nos 218, Part B: Engineering Manufacture, pp. 289-300.
    • (2004) Proc Instn Mech Engrs , Issue.218 , pp. 289-300
    • Teoh, P.C.1    Case, K.2
  • 26
    • 0005667349 scopus 로고    scopus 로고
    • Reliability centered maintenance: A case study
    • Wilmeth, G.W. and Usrey, M.W. (2000), "Reliability centered maintenance: a case study", Engineering Management Journal, Vol. 12 No. 4, pp. 25-31.
    • (2000) Engineering Management Journal , vol.12 , Issue.4 , pp. 25-31
    • Wilmeth, G.W.1    Usrey, M.W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.