메뉴 건너뛰기




Volumn 14, Issue 3-4, 2008, Pages 266-288

A robust scheduling rule using a Neural Network in dynamically changing job-shop environments

Author keywords

Dispatching rule; Dynamic scheduling; Job shop; Neural network; NN; Priority rule; Tardiness cost

Indexed keywords

JOB ANALYSIS; NEURAL NETWORKS; NUMERICAL METHODS; ROBUST CONTROL;

EID: 41549141780     PISSN: 13682148     EISSN: None     Source Type: Journal    
DOI: 10.1504/IJMTM.2008.017727     Document Type: Article
Times cited : (15)

References (12)
  • 2
    • 0028468293 scopus 로고
    • Using mutual information for selecting features in supervised neural net learning
    • Battiti, R. (1994) 'Using mutual information for selecting features in supervised neural net learning', IEEE Trans. on Neural Network, Vol. 5, No. 4, pp.537-550.
    • (1994) IEEE Trans. on Neural Network , vol.5 , Issue.4 , pp. 537-550
    • Battiti, R.1
  • 3
    • 0020013653 scopus 로고
    • A state-of-the-art survey of dispatching rules for manufacturing job shop operations
    • Blackstone, J.H., Phillips, D.T. and Hogg, G.L. (1982) 'A state-of-the-art survey of dispatching rules for manufacturing job shop operations', International Journal of Production Research, Vol. 20, No. 1, pp.27-45.
    • (1982) International Journal of Production Research , vol.20 , Issue.1 , pp. 27-45
    • Blackstone, J.H.1    Phillips, D.T.2    Hogg, G.L.3
  • 4
    • 0030212629 scopus 로고    scopus 로고
    • The job shop scheduling problem: Conventional and new solution techniques
    • Blazewicz, J., Domschke, W. and Pesch, E. (1996) 'The job shop scheduling problem: conventional and new solution techniques', European Journal of Operational Research, Vol. 93, pp. 1-33.
    • (1996) European Journal of Operational Research , vol.93 , pp. 1-33
    • Blazewicz, J.1    Domschke, W.2    Pesch, E.3
  • 5
    • 0032658233 scopus 로고    scopus 로고
    • Neural networks in production planning and control
    • Garetti, M. and Taisch, M. (1999) 'Neural networks in production planning and control', Production Planning and Control, Vol. 10, No. 4, pp.324-339.
    • (1999) Production Planning and Control , vol.10 , Issue.4 , pp. 324-339
    • Garetti, M.1    Taisch, M.2
  • 8
    • 0032784020 scopus 로고    scopus 로고
    • An analysis of heuristics in a dynamic job shop with weighted tardiness objectives
    • Kutanoglu, E. and Sabuncuoglu, I. (1999) 'An analysis of heuristics in a dynamic job shop with weighted tardiness objectives', International Journal of Production Research, Vol. 37, No. 1, pp.165-187.
    • (1999) International Journal of Production Research , vol.37 , Issue.1 , pp. 165-187
    • Kutanoglu, E.1    Sabuncuoglu, I.2
  • 10
    • 0031627997 scopus 로고    scopus 로고
    • Scheduling with neural networks: A review of the literature and new research directions
    • Sabuncuoglu, I. (1998) 'Scheduling with neural networks: a review of the literature and new research directions', Production Planning and Control, Vol. 9, No. 1, pp.2-12.
    • (1998) Production Planning and Control , vol.9 , Issue.1 , pp. 2-12
    • Sabuncuoglu, I.1
  • 11
    • 84952488322 scopus 로고
    • An expert neural network system for dynamic job shop scheduling
    • Sim, S.K., Yeo, K.Y. and Lee, W.H. (1994) 'An expert neural network system for dynamic job shop scheduling', International Journal of Production Research, Vol. 32, No. 8, pp. 1759-1773.
    • (1994) International Journal of Production Research , vol.32 , Issue.8 , pp. 1759-1773
    • Sim, S.K.1    Yeo, K.Y.2    Lee, W.H.3
  • 12
    • 0023399009 scopus 로고
    • Priority rules for job shops with weighted tardiness costs
    • Vepsalainen, A.P.J. and Morton, T.E. (1987) 'Priority rules for job shops with weighted tardiness costs', Management Science, Vol. 33, No. 8, pp.1035-1047.
    • (1987) Management Science , vol.33 , Issue.8 , pp. 1035-1047
    • Vepsalainen, A.P.J.1    Morton, T.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.