메뉴 건너뛰기




Volumn 35, Issue 11, 2008, Pages 3696-3713

Heuristics for the single machine scheduling problem with quadratic earliness and tardiness penalties

Author keywords

Dispatching rules; Early tardy; Quadratic penalties; Scheduling; Single machine

Indexed keywords

COMPUTATIONAL COMPLEXITY; HEURISTIC METHODS; LINEAR PROGRAMMING; PROBLEM SOLVING;

EID: 41149174854     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2007.04.006     Document Type: Article
Times cited : (29)

References (25)
  • 1
    • 0036626376 scopus 로고    scopus 로고
    • The production of several items in a single facility with linearly changing demand rates
    • Wagner B.J., Davis D.J., and Kher H. The production of several items in a single facility with linearly changing demand rates. Decision Sciences 33 (2002) 317-346
    • (2002) Decision Sciences , vol.33 , pp. 317-346
    • Wagner, B.J.1    Davis, D.J.2    Kher, H.3
  • 2
    • 41149132945 scopus 로고    scopus 로고
    • Korman K. A pressing matter. Video 1994; 46-50.
    • Korman K. A pressing matter. Video 1994; 46-50.
  • 3
    • 41149149794 scopus 로고    scopus 로고
    • Landis K. Group technology and cellular manufacturing in the Westvaco Los Angeles VH department. Project report in IOM 581, School of Business, University of Southern California, 1993.
    • Landis K. Group technology and cellular manufacturing in the Westvaco Los Angeles VH department. Project report in IOM 581, School of Business, University of Southern California, 1993.
  • 4
    • 41149136268 scopus 로고    scopus 로고
    • Valente JMS. An exact approach for single machine scheduling with quadratic earliness and tardiness penalties. Working Paper 238, Faculdade de Economia, Universidade do Porto, Portugal, 2007.
    • Valente JMS. An exact approach for single machine scheduling with quadratic earliness and tardiness penalties. Working Paper 238, Faculdade de Economia, Universidade do Porto, Portugal, 2007.
  • 5
    • 0023965120 scopus 로고
    • Dynamic programming state-space relaxation for single machine scheduling
    • Abdul-Razaq T., and Potts C.N. Dynamic programming state-space relaxation for single machine scheduling. Journal of the Operational Research Society 39 (1988) 141-152
    • (1988) Journal of the Operational Research Society , vol.39 , pp. 141-152
    • Abdul-Razaq, T.1    Potts, C.N.2
  • 6
    • 0031076201 scopus 로고    scopus 로고
    • Single machine earliness and tardiness scheduling
    • Li G. Single machine earliness and tardiness scheduling. European Journal of Operational Research 96 (1997) 546-558
    • (1997) European Journal of Operational Research , vol.96 , pp. 546-558
    • Li, G.1
  • 7
    • 0033165933 scopus 로고    scopus 로고
    • A branch-and-bound algorithm for the single machine earliness and tardiness scheduling problem
    • Liaw C.F. A branch-and-bound algorithm for the single machine earliness and tardiness scheduling problem. Computers and Operations Research 26 (1999) 679-693
    • (1999) Computers and Operations Research , vol.26 , pp. 679-693
    • Liaw, C.F.1
  • 8
    • 17644417123 scopus 로고    scopus 로고
    • Improved lower bounds for the early/tardy scheduling problem with no idle time
    • Valente J.M.S., and Alves R.A.F.S. Improved lower bounds for the early/tardy scheduling problem with no idle time. Journal of the Operational Research Society 56 (2005) 604-612
    • (2005) Journal of the Operational Research Society , vol.56 , pp. 604-612
    • Valente, J.M.S.1    Alves, R.A.F.S.2
  • 9
    • 0000245614 scopus 로고
    • The single machine early/tardy problem
    • Ow P.S., and Morton T.E. The single machine early/tardy problem. Management Science 35 (1989) 177-191
    • (1989) Management Science , vol.35 , pp. 177-191
    • Ow, P.S.1    Morton, T.E.2
  • 10
    • 4744370447 scopus 로고    scopus 로고
    • Improved heuristics for the early/tardy scheduling problem with no idle time
    • Valente J.M.S., and Alves R.A.F.S. Improved heuristics for the early/tardy scheduling problem with no idle time. Computers and Operations Research 32 (2005) 557-569
    • (2005) Computers and Operations Research , vol.32 , pp. 557-569
    • Valente, J.M.S.1    Alves, R.A.F.S.2
  • 11
    • 14044249418 scopus 로고    scopus 로고
    • Filtered and recovering beam search algorithms for the early/tardy scheduling problem with no idle time
    • Valente J.M.S., and Alves R.A.F.S. Filtered and recovering beam search algorithms for the early/tardy scheduling problem with no idle time. Computers and Industrial Engineering 48 (2005) 363-375
    • (2005) Computers and Industrial Engineering , vol.48 , pp. 363-375
    • Valente, J.M.S.1    Alves, R.A.F.S.2
  • 12
    • 3543096874 scopus 로고    scopus 로고
    • The one machine problem with earliness and tardiness penalties
    • Sourd F., and Kedad-Sidhoum S. The one machine problem with earliness and tardiness penalties. Journal of Scheduling 6 (2003) 533-549
    • (2003) Journal of Scheduling , vol.6 , pp. 533-549
    • Sourd, F.1    Kedad-Sidhoum, S.2
  • 14
    • 0032209032 scopus 로고    scopus 로고
    • Single-machine scheduling of unit-time jobs with earliness and tardiness penalties
    • Verma S., and Dessouky M. Single-machine scheduling of unit-time jobs with earliness and tardiness penalties. Mathematics of Operations Research 23 (1998) 930-943
    • (1998) Mathematics of Operations Research , vol.23 , pp. 930-943
    • Verma, S.1    Dessouky, M.2
  • 15
    • 0037290972 scopus 로고    scopus 로고
    • Single-machine scheduling for minimizing earliness and tardiness penalties by meta-heuristic approaches
    • Feldmann M., and Biskup D. Single-machine scheduling for minimizing earliness and tardiness penalties by meta-heuristic approaches. Computers and Industrial Engineering 44 (2003) 307-323
    • (2003) Computers and Industrial Engineering , vol.44 , pp. 307-323
    • Feldmann, M.1    Biskup, D.2
  • 16
    • 0028734441 scopus 로고
    • Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates
    • Kim Y.D., and Yano C.A. Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates. Naval Research Logistics 41 (1994) 913-933
    • (1994) Naval Research Logistics , vol.41 , pp. 913-933
    • Kim, Y.D.1    Yano, C.A.2
  • 17
    • 0037290066 scopus 로고    scopus 로고
    • Single machine scheduling with symmetric earliness and tardiness penalties
    • Ventura J.A., and Radhakrishnan S. Single machine scheduling with symmetric earliness and tardiness penalties. European Journal of Operational Research 144 (2003) 598-612
    • (2003) European Journal of Operational Research , vol.144 , pp. 598-612
    • Ventura, J.A.1    Radhakrishnan, S.2
  • 18
    • 0021439811 scopus 로고
    • Minimizing the sum of absolute lateness in single-machine scheduling
    • Sundararaghavan P.S., and Ahmed M.U. Minimizing the sum of absolute lateness in single-machine scheduling. Naval Research Logistics Quarterly 31 (1984) 325-333
    • (1984) Naval Research Logistics Quarterly , vol.31 , pp. 325-333
    • Sundararaghavan, P.S.1    Ahmed, M.U.2
  • 19
    • 2342473349 scopus 로고    scopus 로고
    • Single machine scheduling with early and quadratic tardy penalties
    • Schaller J. Single machine scheduling with early and quadratic tardy penalties. Computers and Industrial Engineering 46 (2004) 511-532
    • (2004) Computers and Industrial Engineering , vol.46 , pp. 511-532
    • Schaller, J.1
  • 20
    • 0020809540 scopus 로고
    • Minimizing a quadratic function of job lateness on a single machine
    • Gupta S.K., and Sen T. Minimizing a quadratic function of job lateness on a single machine. Engineering Costs and Production Economics 7 (1983) 187-194
    • (1983) Engineering Costs and Production Economics , vol.7 , pp. 187-194
    • Gupta, S.K.1    Sen, T.2
  • 21
    • 0032114993 scopus 로고    scopus 로고
    • A heuristic to minimize a quadratic function of job lateness on a single machine
    • Su L.H., and Chang P.C. A heuristic to minimize a quadratic function of job lateness on a single machine. International Journal of Production Economics 55 (1998) 169-175
    • (1998) International Journal of Production Economics , vol.55 , pp. 169-175
    • Su, L.H.1    Chang, P.C.2
  • 22
    • 0037121183 scopus 로고    scopus 로고
    • Minimizing the sum of squares lateness on a single machine
    • Schaller J. Minimizing the sum of squares lateness on a single machine. European Journal of Operational Research 143 (2002) 64-79
    • (2002) European Journal of Operational Research , vol.143 , pp. 64-79
    • Schaller, J.1
  • 23
    • 0030125484 scopus 로고
    • Minimizing a weighted quadratic function of job lateness in the single machine system
    • Sen T., Dileepan P., and Lind M.R. Minimizing a weighted quadratic function of job lateness in the single machine system. International Journal of Production Economics 42 (1995) 237-243
    • (1995) International Journal of Production Economics , vol.42 , pp. 237-243
    • Sen, T.1    Dileepan, P.2    Lind, M.R.3
  • 24
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: a review
    • Baker K.R., and Scudder G.D. Sequencing with earliness and tardiness penalties: a review. Operations Research 38 (1990) 22-36
    • (1990) Operations Research , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 25
    • 0033685372 scopus 로고    scopus 로고
    • Scheduling with inserted idle time: problem taxonomy and literature review
    • Kanet J.J., and Sridharan V. Scheduling with inserted idle time: problem taxonomy and literature review. Operations Research 48 (2000) 99-110
    • (2000) Operations Research , vol.48 , pp. 99-110
    • Kanet, J.J.1    Sridharan, V.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.