메뉴 건너뛰기




Volumn 32, Issue 4, 2008, Pages 6-10

Probabilistic evaluation of power system operational risk based on daily generation scheduling

Author keywords

Daily generation scheduling; Risk evaluation; Risk index; Time dependent outage probability; Under frequency load shedding device

Indexed keywords

OUTAGES; PROBABILITY; SCHEDULING;

EID: 40949160960     PISSN: 10001026     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (15)

References (16)
  • 2
    • 23744515645 scopus 로고    scopus 로고
    • A Preliminary investigation on power system operation risk evaluation in the modern energy control center
    • FENG Yongqing, WU Wenchuan, SUN Hongbin, et al. A Preliminary investigation on power system operation risk evaluation in the modern energy control center. Proceedings of the CSEE, 2005, 25(13): 73-79.
    • (2005) Proceedings of the CSEE , vol.25 , Issue.13 , pp. 73-79
    • Feng, Y.1    Wu, W.2    Sun, H.3
  • 3
    • 16244411326 scopus 로고    scopus 로고
    • Research on on-line assessment of transmission network operation risk
    • SHI Huijie, GE Fei, Ding Ming, et al. Research on on-line assessment of transmission network operation risk. Power System Technology, 2005, 29(6): 43-48.
    • (2005) Power System Technology , vol.29 , Issue.6 , pp. 43-48
    • Shi, H.1    Ge, F.2    Ding, M.3
  • 4
    • 23944463920 scopus 로고    scopus 로고
    • Power system operational reliability evaluation based on real-time operating state
    • SUN Yuanzhang, CHENG Lin, LIU Haitao. Power system operational reliability evaluation based on real-time operating state. Power System Technology, 2005, 29(15): 6-12.
    • (2005) Power System Technology , vol.29 , Issue.15 , pp. 6-12
    • Sun, Y.1    Cheng, L.2    Liu, H.3
  • 5
    • 33947117089 scopus 로고    scopus 로고
    • Impact analysis of model and parameters of transmission lines upon power system operational reliability evaluation
    • CHENG Lin, HE Jian, SUN Yuanzhang. Impact analysis of model and parameters of transmission lines upon power system operational reliability evaluation. Power System Technology, 2006, 30(13): 8-13.
    • (2006) Power System Technology , vol.30 , Issue.13 , pp. 8-13
    • Cheng, L.1    He, J.2    Sun, Y.3
  • 6
    • 33644956659 scopus 로고    scopus 로고
    • Power system operation risk assessment based on. credibility theory: Part one propound and development of operation risk assessment
    • FENG Yongqing, ZHANG Boming, WU Wenchuan, et al. Power system operation risk assessment based on. credibility theory: Part one propound and development of operation risk assessment. Automation of Electric Power Systems, 2006, 30(1): 17-23.
    • (2006) Automation of Electric Power Systems , vol.30 , Issue.1 , pp. 17-23
    • Feng, Y.1    Zhang, B.2    Wu, W.3
  • 7
    • 33645642918 scopus 로고    scopus 로고
    • Power system operation risk assessment based on credibility theory: Part two theory fundament
    • FENG Yongqing, WU Wenchuan, ZHANG Boming, et al. Power system operation risk assessment based on credibility theory: Part two theory fundament. Automation of Electric Power Systems, 2006, 30(2): 11-15.
    • (2006) Automation of Electric Power Systems , vol.30 , Issue.2 , pp. 11-15
    • Feng, Y.1    Wu, W.2    Zhang, B.3
  • 8
    • 33645288607 scopus 로고    scopus 로고
    • Power system operation risk assessment based on credibility theory; Part three engineering application
    • FENG Yongqing, WU Wenchuan, ZHANG Boming, et al. Power system operation risk assessment based on credibility theory; Part three engineering application. Automation of Electric Power Systems, 2006, 30(3): 11-16.
    • (2006) Automation of Electric Power Systems , vol.30 , Issue.3 , pp. 11-16
    • Feng, Y.1    Wu, W.2    Zhang, B.3
  • 9
    • 40949120028 scopus 로고    scopus 로고
    • in Chinese
  • 10
    • 40949124027 scopus 로고    scopus 로고
    • Modeling studies on secondary equipments in power system dynamic simulation
    • ZHOU Junyu. Modeling studies on secondary equipments in power system dynamic simulation. Guangdong Electric Power, 2006, 19(1): 14-17.
    • (2006) Guangdong Electric Power , vol.19 , Issue.1 , pp. 14-17
    • Zhou, J.1
  • 11
    • 40949131544 scopus 로고    scopus 로고
    • in Chinese
  • 12
    • 0018544097 scopus 로고
    • IEEE reliability test system
    • IEEE Task Force
    • IEEE Task Force. IEEE reliability test system. IEEE Trans on Power Apparatus and Systems, 1979, 98(6): 2047-2054.
    • (1979) IEEE Trans on Power Apparatus and Systems , vol.98 , Issue.6 , pp. 2047-2054
  • 13
    • 0029356616 scopus 로고
    • Short-term generation scheduling with transmission and environmental constraints using an augmented Lagrangian relaxation
    • WANG S J, SHAHIDEHPOUR S M, KIRSCHEN D S, et al. Short-term generation scheduling with transmission and environmental constraints using an augmented Lagrangian relaxation. IEEE Trans on Power Systems, 1995, 10(3): 1294-1301.
    • (1995) IEEE Trans on Power Systems , vol.10 , Issue.3 , pp. 1294-1301
    • Wang, S.J.1    Shahidehpour, S.M.2    Kirschen, D.S.3
  • 14
    • 0027647348 scopus 로고
    • Effects of ramp-rate limits on unit commitment and economic dispatch
    • WANG C, SHAHIDEHPOUR S M. Effects of ramp-rate limits on unit commitment and economic dispatch. IEEE Trans on Power Systems, 1993, 8(3): 1341-1349.
    • (1993) IEEE Trans on Power Systems , vol.8 , Issue.3 , pp. 1341-1349
    • Wang, C.1    Shahidehpour, S.M.2
  • 15
    • 33845722326 scopus 로고    scopus 로고
    • Model and method for daily dispatch scheduling in primary power markets
    • CHU Zhuang, YU Jilai. Model and method for daily dispatch scheduling in primary power markets. Automation of Electric Power Systems, 2006, 30(22): 43-47.
    • (2006) Automation of Electric Power Systems , vol.30 , Issue.22 , pp. 43-47
    • Chu, Z.1    Yu, J.2
  • 16
    • 0028482457 scopus 로고
    • Generating system operating health analysis considering stand-by units, interruptible load and postponable outages
    • BILLINTON R, FOTUHI-FIRUZABAD M. Generating system operating health analysis considering stand-by units, interruptible load and postponable outages. IEEE Trans on Power Systems, 1994, 9(3): 1618-1625.
    • (1994) IEEE Trans on Power Systems , vol.9 , Issue.3 , pp. 1618-1625
    • Billinton, R.1    Fotuhi-Firuzabad, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.