|
Volumn 46, Issue 7, 2004, Pages 27-33
|
Primary-secondary chilled water systems: Making them work
a
a
ASHRAE
(United States)
|
Author keywords
[No Author keywords available]
|
Indexed keywords
CONDITION MONITORING;
DESIGN;
FLOW MEASUREMENT;
MAINTENANCE;
OPERATIONS RESEARCH;
PERSONNEL TRAINING;
PRESSURE DROP;
PROCESS ENGINEERING;
PUMPING PLANTS;
SYSTEMS ENGINEERING;
TEMPERATURE;
WATER COOLING TOWERS;
CHILLED WATER PLANT;
CHILLED WATER PUMPING SYSTEMS;
CHILLER;
DECOUPLER BRIDGE;
DELTA T;
EXPANSION TANK CONNECTION;
PRIMARY PUMPING;
SECONDARY PUMPING;
PUMPS;
|
EID: 4043179002
PISSN: 00012491
EISSN: None
Source Type: Journal
DOI: None Document Type: Article |
Times cited : (6)
|
References (4)
|