메뉴 건너뛰기




Volumn 16, Issue 3, 2008, Pages 278-293

A simulation based experimental design to analyze factors affecting production flow time

Author keywords

Anova; Experimental design; Facility design; Flow time; Simulation

Indexed keywords

CELLULAR MANUFACTURING; COMPUTER SOFTWARE; FUNCTIONAL ANALYSIS; PARAMETER ESTIMATION; SCHEDULING;

EID: 39749151554     PISSN: 1569190X     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.simpat.2007.11.016     Document Type: Article
Times cited : (33)

References (24)
  • 5
    • 0031622580 scopus 로고    scopus 로고
    • A review and analysis of comparative performance studies on functional and cellular manufacturing layouts
    • Agarwal A., and Sarkis J. A review and analysis of comparative performance studies on functional and cellular manufacturing layouts. Computers & Industrial Engineering 34 (1998) 77-89
    • (1998) Computers & Industrial Engineering , vol.34 , pp. 77-89
    • Agarwal, A.1    Sarkis, J.2
  • 6
    • 0242301598 scopus 로고    scopus 로고
    • Comparing functional and cellular layouts: a simulation study based on standardization
    • Assad A.A., Kramer S.B., and Kaku B.K. Comparing functional and cellular layouts: a simulation study based on standardization. International Journal of Production Research 41 (2003) 1639-1663
    • (2003) International Journal of Production Research , vol.41 , pp. 1639-1663
    • Assad, A.A.1    Kramer, S.B.2    Kaku, B.K.3
  • 7
    • 38249034192 scopus 로고
    • Repetitive lots: the use of a sequence dependent set-up time scheduling procedure in group technology and traditional shops
    • Flynn B.B. Repetitive lots: the use of a sequence dependent set-up time scheduling procedure in group technology and traditional shops. Journal of Operations Management 7 (1987) 203-216
    • (1987) Journal of Operations Management , vol.7 , pp. 203-216
    • Flynn, B.B.1
  • 8
    • 0034780059 scopus 로고    scopus 로고
    • A simulation analysis of factors influencing the flow-time and throughput performance of functional and cellular layouts
    • Huq F., Hensler D.A., and Mohamed Z.M. A simulation analysis of factors influencing the flow-time and throughput performance of functional and cellular layouts. Integrated Manufacturing Systems 12 (2001) 285-295
    • (2001) Integrated Manufacturing Systems , vol.12 , pp. 285-295
    • Huq, F.1    Hensler, D.A.2    Mohamed, Z.M.3
  • 9
    • 0000970291 scopus 로고
    • A heuristic algorithm and simulation approach to relative location of facilities
    • Armour G.C., and Buffa E.S. A heuristic algorithm and simulation approach to relative location of facilities. Management Science 9 (1963) 294-309
    • (1963) Management Science , vol.9 , pp. 294-309
    • Armour, G.C.1    Buffa, E.S.2
  • 10
    • 0030140603 scopus 로고    scopus 로고
    • Achieving competitive advantage through group technology
    • Fraizer G.V., and Spriggs M.T. Achieving competitive advantage through group technology. Business Horizons 39 (1996) 83-90
    • (1996) Business Horizons , vol.39 , pp. 83-90
    • Fraizer, G.V.1    Spriggs, M.T.2
  • 11
    • 0018991743 scopus 로고
    • Machine-component grouping in production flow analysis: an approach using rank order clustering algorithm
    • King J.R. Machine-component grouping in production flow analysis: an approach using rank order clustering algorithm. International Journal of Production Research 18 (1980) 213-232
    • (1980) International Journal of Production Research , vol.18 , pp. 213-232
    • King, J.R.1
  • 12
    • 0025560330 scopus 로고
    • A simulation analysis of factors influencing the attractiveness of group technology cellular layouts
    • Morris J.S., and Tersine R.J. A simulation analysis of factors influencing the attractiveness of group technology cellular layouts. Management Science 36 (1990) 1567-1578
    • (1990) Management Science , vol.36 , pp. 1567-1578
    • Morris, J.S.1    Tersine, R.J.2
  • 13
    • 0028532489 scopus 로고
    • A simulation comparison of process and cellular layouts in a dual resource constrained environment
    • Morris J.S., and Tersine R.J. A simulation comparison of process and cellular layouts in a dual resource constrained environment. Computers & Industrial Engineering 26 (1994) 733-741
    • (1994) Computers & Industrial Engineering , vol.26 , pp. 733-741
    • Morris, J.S.1    Tersine, R.J.2
  • 14
    • 21144479925 scopus 로고
    • An empirically based simulation study of functional versus cellular layouts with operations overlapping
    • Shafer M.S., and Meredith J.R. An empirically based simulation study of functional versus cellular layouts with operations overlapping. International Journal of Operations & Production Management 13 (1993) 47-63
    • (1993) International Journal of Operations & Production Management , vol.13 , pp. 47-63
    • Shafer, M.S.1    Meredith, J.R.2
  • 16
    • 84985788221 scopus 로고
    • Partitioning work centers for group technology: analytical extension and shop-level simulation investigation
    • Suresh N.C. Partitioning work centers for group technology: analytical extension and shop-level simulation investigation. Decision Sciences 23 (1992) 267-290
    • (1992) Decision Sciences , vol.23 , pp. 267-290
    • Suresh, N.C.1
  • 17
    • 84985829464 scopus 로고
    • Partitioning work centers for group technology: insights from an analytical model
    • Suresh N.C. Partitioning work centers for group technology: insights from an analytical model. Decision Sciences 22 (1991) 772-791
    • (1991) Decision Sciences , vol.22 , pp. 772-791
    • Suresh, N.C.1
  • 18
    • 0031637954 scopus 로고    scopus 로고
    • Evaluation of the performance domain of cellular and functional layouts
    • Farrington P.A., and Nazemetz J.W. Evaluation of the performance domain of cellular and functional layouts. Computers & Industrial Engineering 34 (1998) 91-101
    • (1998) Computers & Industrial Engineering , vol.34 , pp. 91-101
    • Farrington, P.A.1    Nazemetz, J.W.2
  • 19
    • 84990623231 scopus 로고
    • Performance of selected part-machine grouping techniques for data sets of wide ranging sizes and imperfection
    • Kaparthi S., and Suresh N.C. Performance of selected part-machine grouping techniques for data sets of wide ranging sizes and imperfection. Decision Sciences 25 (1994) 515-539
    • (1994) Decision Sciences , vol.25 , pp. 515-539
    • Kaparthi, S.1    Suresh, N.C.2
  • 20
    • 84990614224 scopus 로고
    • Cellular versus functional layouts under a variety of shop operating conditions
    • Shafer S.M., and Charnes J.M. Cellular versus functional layouts under a variety of shop operating conditions. Decision Sciences 24 (1993) 665-682
    • (1993) Decision Sciences , vol.24 , pp. 665-682
    • Shafer, S.M.1    Charnes, J.M.2
  • 21
    • 0037575180 scopus 로고
    • A simulation study comparing GT versus job shop manufacturing systems
    • Gupta T., and Leelaket S. A simulation study comparing GT versus job shop manufacturing systems. Computers & Industrial Engineering 25 (1993) 195-198
    • (1993) Computers & Industrial Engineering , vol.25 , pp. 195-198
    • Gupta, T.1    Leelaket, S.2
  • 24
    • 39749137651 scopus 로고    scopus 로고
    • K. Balakrishnan, Integrating simulation and design of experiments to identify factors for layout design, M.Sc. Thesis, University of Cincinnati, 2000.
    • K. Balakrishnan, Integrating simulation and design of experiments to identify factors for layout design, M.Sc. Thesis, University of Cincinnati, 2000.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.