메뉴 건너뛰기




Volumn 112, Issue 2, 2008, Pages 714-722

Simulating an agile, synchronized manufacturing system

Author keywords

Agile production; Just in time; Quick response; Simulation; Synchronized parallel assembly; Uniform batch size

Indexed keywords

COMPUTER SIMULATION; OPERATIONS RESEARCH; PRODUCTION; SYNCHRONIZATION;

EID: 39649086700     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2007.06.008     Document Type: Article
Times cited : (23)

References (10)
  • 1
    • 34247645931 scopus 로고    scopus 로고
    • General Motors increases its production throughput
    • Alden J.M., et al. General Motors increases its production throughput. Interfaces (2006)
    • (2006) Interfaces
    • Alden, J.M.1
  • 2
    • 0032114994 scopus 로고    scopus 로고
    • Simulation modeling and analysis of a JIT production system
    • Baykoc O.F., and Erol S. Simulation modeling and analysis of a JIT production system. International Journal of Production Economics 55 2 (1998) 203-212
    • (1998) International Journal of Production Economics , vol.55 , Issue.2 , pp. 203-212
    • Baykoc, O.F.1    Erol, S.2
  • 4
    • 0032675021 scopus 로고    scopus 로고
    • Agility, adaptability and leanness: A comparison of concepts and a study of practice
    • Katayama H., and Bennett D. Agility, adaptability and leanness: A comparison of concepts and a study of practice. International Journal of Production Economics 60-61 (1999) 43-51
    • (1999) International Journal of Production Economics , vol.60-61 , pp. 43-51
    • Katayama, H.1    Bennett, D.2
  • 5
    • 39649114181 scopus 로고    scopus 로고
    • Keller, J., Herrell, C., Levey, J., 1991. The three best reasons why simulation fails. Industrial Engineering 27.
    • Keller, J., Herrell, C., Levey, J., 1991. The three best reasons why simulation fails. Industrial Engineering 27.
  • 6
    • 0038966821 scopus 로고
    • Management of wood products manufacturing using simulation/animation
    • Kline D.E., et al. Management of wood products manufacturing using simulation/animation. Forest Products Journal 42 2 (1972)
    • (1972) Forest Products Journal , vol.42 , Issue.2
    • Kline, D.E.1
  • 7
  • 8
    • 0032156540 scopus 로고    scopus 로고
    • An analysis of the impact of plant and management variables in a multi-stage, mixed model production system
    • Sianesi A. An analysis of the impact of plant and management variables in a multi-stage, mixed model production system. International Journal of Production Economics 56-57 (1998) 575-585
    • (1998) International Journal of Production Economics , vol.56-57 , pp. 575-585
    • Sianesi, A.1
  • 9
    • 0032737809 scopus 로고    scopus 로고
    • Application of discrete event simulation to activity based costing of manufacturing systems
    • Spedding T.A., and Sun G.Q. Application of discrete event simulation to activity based costing of manufacturing systems. International Journal of Production Economics 58 3 (1999) 289-301
    • (1999) International Journal of Production Economics , vol.58 , Issue.3 , pp. 289-301
    • Spedding, T.A.1    Sun, G.Q.2
  • 10
    • 39649094807 scopus 로고    scopus 로고
    • Flexibility: Friend or foe?
    • London
    • Whitehead M. Flexibility: Friend or foe?. Supply Management (2000) London
    • (2000) Supply Management
    • Whitehead, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.