-
2
-
-
13844256873
-
Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times
-
Balasubramaniam, H., Monch, L., Fowler, J. and Pfund, M. (2005) 'Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times', International Journal of Production Research, Vol. 32, No. 11, pp.2731-2750.
-
(2005)
International Journal of Production Research
, vol.32
, Issue.11
, pp. 2731-2750
-
-
Balasubramaniam, H.1
Monch, L.2
Fowler, J.3
Pfund, M.4
-
3
-
-
0346636333
-
Decision making in a fuzzy environment
-
Bellman, R.E. and Zadeh, L.A. (1970) 'Decision making in a fuzzy environment', Management Sciences, Vol. 17, No. 4, pp.141-164.
-
(1970)
Management Sciences
, vol.17
, Issue.4
, pp. 141-164
-
-
Bellman, R.E.1
Zadeh, L.A.2
-
4
-
-
0347092029
-
A tabu search algorithm for parallel machine total tardiness problems
-
Bilge, U., Kirac, F., Kurtulan, M. and Pekgon, P. (2004) 'A tabu search algorithm for parallel machine total tardiness problems', Computers and Operations Research, Vol. 31, No. 3, pp.397-414.
-
(2004)
Computers and Operations Research
, vol.31
, Issue.3
, pp. 397-414
-
-
Bilge, U.1
Kirac, F.2
Kurtulan, M.3
Pekgon, P.4
-
5
-
-
0028445470
-
Parallel machine scheduling problems with earliness and tardiness penalties
-
Cheng, T.C.E. and Chen, Z.L. (1994) 'Parallel machine scheduling problems with earliness and tardiness penalties', Journal of the Operational Research Society, Vol. 45, No. 6, pp.685-695.
-
(1994)
Journal of the Operational Research Society
, vol.45
, Issue.6
, pp. 685-695
-
-
Cheng, T.C.E.1
Chen, Z.L.2
-
6
-
-
0042311378
-
Scheduling unrelated parallel machines to minimize total weighted tardiness
-
Ching-Fang, L., Yang-Kuei, L., Chun-Yuan, C. and Mingchin, C. (2003) 'Scheduling unrelated parallel machines to minimize total weighted tardiness', Computers and Operations Research, Vol. 30, No. 12, pp.1777-1789.
-
(2003)
Computers and Operations Research
, vol.30
, Issue.12
, pp. 1777-1789
-
-
Ching-Fang, L.1
Yang-Kuei, L.2
Chun-Yuan, C.3
Mingchin, C.4
-
7
-
-
34047181001
-
-
Davide, A. and Massimo, P. (2006) 'Parallel machine total tardiness scheduling with a new hybrid metaheuristic approach', Computers and Operations Research (Article in Press, corrected proof, available online 13 March 2006).
-
Davide, A. and Massimo, P. (2006) 'Parallel machine total tardiness scheduling with a new hybrid metaheuristic approach', Computers and Operations Research (Article in Press, corrected proof, available online 13 March 2006).
-
-
-
-
8
-
-
0003849948
-
-
Davis, L, Ed, New York, NY: Van Nostrand Reinhold
-
Davis, L. (Ed.) (1991) 'Handbook of Genetic Algorithms', New York, NY: Van Nostrand Reinhold.
-
(1991)
Handbook of Genetic Algorithms
-
-
-
9
-
-
0021297957
-
Assigning looms in a textile weaving operation with changeover limitations
-
Dearing, P.M. and Anderson, R.A. (1984) 'Assigning looms in a textile weaving operation with changeover limitations', Production and Inventory Management, Vol. 25, No. 1, pp.23-31.
-
(1984)
Production and Inventory Management
, vol.25
, Issue.1
, pp. 23-31
-
-
Dearing, P.M.1
Anderson, R.A.2
-
10
-
-
0023531467
-
Scheduling to a common due date on parallel uniform processors
-
Emmons, H. (1987) 'Scheduling to a common due date on parallel uniform processors', Naval Research Logistics, Vol. 34, No. 7, pp.803-810.
-
(1987)
Naval Research Logistics
, vol.34
, Issue.7
, pp. 803-810
-
-
Emmons, H.1
-
11
-
-
0037290972
-
Single-machine scheduling for minimizing earliness and tardiness penalties by meta-heuristic approaches
-
Feldman, M. and Biskup, D. (2003) 'Single-machine scheduling for minimizing earliness and tardiness penalties by meta-heuristic approaches', Computers and Industrial Engineering, Vol. 44, No. 2, pp.307-323.
-
(2003)
Computers and Industrial Engineering
, vol.44
, Issue.2
, pp. 307-323
-
-
Feldman, M.1
Biskup, D.2
-
12
-
-
0030170363
-
A tabu search heuristic for the multiprocessor scheduling problem with sequence dependent setup times
-
Franca, P.M., Gendreau, M., Laporte, G. and Muller, F.M. (1996) 'A tabu search heuristic for the multiprocessor scheduling problem with sequence dependent setup times', International Journal of Production Economics Vol. 43, Nos. 2-3, pp.79-89.
-
(1996)
International Journal of Production Economics
, vol.43
, Issue.2-3
, pp. 79-89
-
-
Franca, P.M.1
Gendreau, M.2
Laporte, G.3
Muller, F.M.4
-
13
-
-
0033166361
-
Parallel machine scheduling with earliness and tardiness penalties
-
Funda, S-S. and Giindiiz, U. (1999) 'Parallel machine scheduling with earliness and tardiness penalties', Computers and Operations Research Vol. 26, No. 8, pp.773-787.
-
(1999)
Computers and Operations Research
, vol.26
, Issue.8
, pp. 773-787
-
-
Funda, S.-S.1
Giindiiz, U.2
-
14
-
-
39149099576
-
-
Furkan, K. and Umit, B. (2002) A report on 'Genetic Algorithm Approach to Parallel Machine Total Tardiness Problem', Department of Industrial Engineering, Bogazici University, Bebak, Istanbul, Turkey.
-
Furkan, K. and Umit, B. (2002) A report on 'Genetic Algorithm Approach to Parallel Machine Total Tardiness Problem', Department of Industrial Engineering, Bogazici University, Bebak, Istanbul, Turkey.
-
-
-
-
15
-
-
0024010206
-
One-processor scheduling with symmetric earliness and tardiness penalties
-
Garey, M.R., Tarjan, R.E. and Wilfong, G.T. (1988) 'One-processor scheduling with symmetric earliness and tardiness penalties', Mathematics of Operations Research, Vol. 13, No. 7, pp.330-348.
-
(1988)
Mathematics of Operations Research
, vol.13
, Issue.7
, pp. 330-348
-
-
Garey, M.R.1
Tarjan, R.E.2
Wilfong, G.T.3
-
16
-
-
0002393136
-
Single and multiprocessor models for minimizing completion time variance
-
Hall, N.G. (1986) 'Single and multiprocessor models for minimizing completion time variance', Naval Research Logistics, Vol. 33, No. 1, pp.49-54.
-
(1986)
Naval Research Logistics
, vol.33
, Issue.1
, pp. 49-54
-
-
Hall, N.G.1
-
17
-
-
18144391228
-
Scheduling optimization of flexible manufacturing systems using particle swarm optimization algorithm
-
Jerald, J., Asokan, P., Prabaharan, G. and Saravanan, R. (2005) 'Scheduling optimization of flexible manufacturing systems using particle swarm optimization algorithm', International Journal of Advanced Manufacturing Technology, Vol. 25, No. 8, pp.964-971.
-
(2005)
International Journal of Advanced Manufacturing Technology
, vol.25
, Issue.8
, pp. 964-971
-
-
Jerald, J.1
Asokan, P.2
Prabaharan, G.3
Saravanan, R.4
-
18
-
-
39149128852
-
-
Laboratoire, France
-
Kedad-Sidhoum, S., Solis, Y.R. and Sourd, F. (2004) Lower Bounds for the Earliness-Tardiness Scheduling Problem on Single and Parallel Machines, Laboratoire, France.
-
(2004)
Lower Bounds for the Earliness-Tardiness Scheduling Problem on Single and Parallel Machines
-
-
Kedad-Sidhoum, S.1
Solis, Y.R.2
Sourd, F.3
-
19
-
-
1442334778
-
A fuzzy goal programming approach for vendor selection problem in a supply chain
-
Manoj, K. and Prem, V.S.R. (2003) 'A fuzzy goal programming approach for vendor selection problem in a supply chain', Computers and Industrial Engineering, Vol. 46, No. 1, pp.69-85.
-
(2003)
Computers and Industrial Engineering
, vol.46
, Issue.1
, pp. 69-85
-
-
Manoj, K.1
Prem, V.S.R.2
-
20
-
-
39149084804
-
On the complexity of scheduling with batch setup times
-
Monma, C. and Potts, C.N. (1989) 'On the complexity of scheduling with batch setup times', Operations Research, Vol. 35, No. 4, pp.177-191.
-
(1989)
Operations Research
, vol.35
, Issue.4
, pp. 177-191
-
-
Monma, C.1
Potts, C.N.2
-
21
-
-
0034826057
-
Minmax earliness-tardiness costs with unit processing times
-
Mosheiov, G. and Shadmon, M. (2001) 'Minmax earliness-tardiness costs with unit processing times', European Journal of Operations Research Vol. 130, No. 3, pp.638-652.
-
(2001)
European Journal of Operations Research
, vol.130
, Issue.3
, pp. 638-652
-
-
Mosheiov, G.1
Shadmon, M.2
-
22
-
-
0033079828
-
Early/ Tardy scheduling with sequence dependent setups on uniform parallel machines
-
Nagaraj Balakrishnan, J., Kanet, J. and Siddharan, S.V. (1999) 'Early/ Tardy scheduling with sequence dependent setups on uniform parallel machines', Computers and Operations Research, Vol. 26, No. 2, pp.127-141.
-
(1999)
Computers and Operations Research
, vol.26
, Issue.2
, pp. 127-141
-
-
Nagaraj Balakrishnan, J.1
Kanet, J.2
Siddharan, S.V.3
-
23
-
-
0029392131
-
Scheduling jobs with proportionate early/tardy penalties
-
Rachamadugu, R. (1995) 'Scheduling jobs with proportionate early/tardy penalties', IIE Transactions, Vol. 27, No. 4, pp.679-682.
-
(1995)
IIE Transactions
, vol.27
, Issue.4
, pp. 679-682
-
-
Rachamadugu, R.1
-
24
-
-
0034631284
-
Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times
-
Radhakrishnan, S. and Ventura, J.A. (2000) 'Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times', International Journal of Production Research, Vol. 38, No. 10, pp.2233-2252.
-
(2000)
International Journal of Production Research
, vol.38
, Issue.10
, pp. 2233-2252
-
-
Radhakrishnan, S.1
Ventura, J.A.2
-
25
-
-
33751402603
-
Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs
-
Ruiz-Torres, A.J., Lopez, F.J. and Ho, J.C. (2007) 'Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs', European Journal of Operations Research, Vol. 179, No. 2, pp.302-315.
-
(2007)
European Journal of Operations Research
, vol.179
, Issue.2
, pp. 302-315
-
-
Ruiz-Torres, A.J.1
Lopez, F.J.2
Ho, J.C.3
-
26
-
-
0031340781
-
Parallel machine scheduling problems using memetic algorithms
-
Runwei, C. and Mitsuo, G. (1997) 'Parallel machine scheduling problems using memetic algorithms', Computers and Industrial Engineering, Vol. 33, Nos. 3-4, pp.761-764.
-
(1997)
Computers and Industrial Engineering
, vol.33
, Issue.3-4
, pp. 761-764
-
-
Runwei, C.1
Mitsuo, G.2
-
27
-
-
0029371267
-
Minimax earliness/ tardiness scheduling in identical parallel machine system using genetic algorithms
-
Runwei, C., Mitsuo, G. and Tatsumi, T. (1995) 'Minimax earliness/ tardiness scheduling in identical parallel machine system using genetic algorithms', Computers and Industrial Engineering, Vol. 29, No. 4, pp.513-517.
-
(1995)
Computers and Industrial Engineering
, vol.29
, Issue.4
, pp. 513-517
-
-
Runwei, C.1
Mitsuo, G.2
Tatsumi, T.3
-
28
-
-
0037278744
-
Machining parameters optimization for turning cylindrical stock into a continuous finished profile using genetic algorithm and simulated annealing
-
Saravanan, R., Asokan, P. and Vijayakumar, K. (2003) 'Machining parameters optimization for turning cylindrical stock into a continuous finished profile using genetic algorithm and simulated annealing', International Journal of Advanced Manufacturing Technology, Vol. 21, No. 1, pp.1-9.
-
(2003)
International Journal of Advanced Manufacturing Technology
, vol.21
, Issue.1
, pp. 1-9
-
-
Saravanan, R.1
Asokan, P.2
Vijayakumar, K.3
-
29
-
-
0033166361
-
Parallel machine scheduling with earliness and tardiness penalties
-
Sivrikaya-Serifoglu, F. and Ulusoy, G. (1999) 'Parallel machine scheduling with earliness and tardiness penalties', Computers & Operations Research, Vol. 26, No. 8, pp.773-787.
-
(1999)
Computers & Operations Research
, vol.26
, Issue.8
, pp. 773-787
-
-
Sivrikaya-Serifoglu, F.1
Ulusoy, G.2
-
30
-
-
0023345805
-
Scheduling parallel processors: An integer linear programming based heuristic for minimizing setup time
-
Smichrast, R. and Baker, K.R. (1987) 'Scheduling parallel processors: An integer linear programming based heuristic for minimizing setup time', International Journal of Production Research, Vol. 25, No. 8, pp.761-771.
-
(1987)
International Journal of Production Research
, vol.25
, Issue.8
, pp. 761-771
-
-
Smichrast, R.1
Baker, K.R.2
-
31
-
-
0037395532
-
Parallel machine earliness and tardiness scheduling with proportional weights
-
Sun, H. and Wang, G. (2003) 'Parallel machine earliness and tardiness scheduling with proportional weights', Computers and Operations Research, Vol. 30, No. 5, pp.801-808.
-
(2003)
Computers and Operations Research
, vol.30
, Issue.5
, pp. 801-808
-
-
Sun, H.1
Wang, G.2
-
32
-
-
84901398419
-
A genetic algorithm approach to multi-objective scheduling problems with earliness and tardiness penalties
-
Tamaki, H., Nishino, E. and Abe, S. (1999) 'A genetic algorithm approach to multi-objective scheduling problems with earliness and tardiness penalties', Proceedings of the Congress of Evolutionary Computation pp.46-52.
-
(1999)
Proceedings of the Congress of Evolutionary Computation
, pp. 46-52
-
-
Tamaki, H.1
Nishino, E.2
Abe, S.3
-
33
-
-
0026841915
-
Scheduling semiconductor test operations: Minimizing maximum lateness and number of tardy jobs on a single machine
-
Uzsoy, R., Lee, C.Y. and Martin-Vega, L.A. (1992) 'Scheduling semiconductor test operations: Minimizing maximum lateness and number of tardy jobs on a single machine', Naval Research Logistics, Vol. 39, No. 3, pp.369-388.
-
(1992)
Naval Research Logistics
, vol.39
, Issue.3
, pp. 369-388
-
-
Uzsoy, R.1
Lee, C.Y.2
Martin-Vega, L.A.3
-
34
-
-
0026253908
-
Production algorithms for semiconductor test facility
-
Uzsoy, R., Martin-Vega, L.A., Lee, C.Y. and Leonard, P.A. (1991) 'Production algorithms for semiconductor test facility', IEEE Transactions on Semiconductor Manufacturing, Vol. 4, No. 4, pp.270-280.
-
(1991)
IEEE Transactions on Semiconductor Manufacturing
, vol.4
, Issue.4
, pp. 270-280
-
-
Uzsoy, R.1
Martin-Vega, L.A.2
Lee, C.Y.3
Leonard, P.A.4
-
35
-
-
0042812478
-
Parallel machine scheduling with earliness-tardiness penalties and additional resource constraints
-
Ventura, J.A. and Kim, D. (2003) 'Parallel machine scheduling with earliness-tardiness penalties and additional resource constraints', Computers and Operations Research, Vol. 30, No. 13, pp.1945-1958.
-
(2003)
Computers and Operations Research
, vol.30
, Issue.13
, pp. 1945-1958
-
-
Ventura, J.A.1
Kim, D.2
-
36
-
-
21244500228
-
Hybrid genetic algorithms for minimizing the maximum completion time for the wafer probing scheduling problem
-
Yang, M-H., Lo, C-C., Chen, H-M. and Huang, H-L. (2005) 'Hybrid genetic algorithms for minimizing the maximum completion time for the wafer probing scheduling problem', Journal of the Chinese Institute of Industrial Engineers, Vol. 22, No. 6, pp.218-225.
-
(2005)
Journal of the Chinese Institute of Industrial Engineers
, vol.22
, Issue.6
, pp. 218-225
-
-
Yang, M.-H.1
Lo, C.-C.2
Chen, H.-M.3
Huang, H.-L.4
-
37
-
-
34248666540
-
-
Zadeh, L.A. (1965) 'Fuzzy sets', Information and Control, 8, No. 4, pp.338-353.
-
Zadeh, L.A. (1965) 'Fuzzy sets', Information and Control, Vol. 8, No. 4, pp.338-353.
-
-
-
|