-
1
-
-
33847792238
-
Service restoration strategy for the distribution system with DGs
-
LU Zhigang, DONG Yuxiang. Service restoration strategy for the distribution system with DGs. Automation of Electric Power Systems, 2007, 31(1): 89-92.
-
(2007)
Automation of Electric Power Systems
, vol.31
, Issue.1
, pp. 89-92
-
-
Lu, Z.1
Dong, Y.2
-
2
-
-
33947520429
-
Supplement and improvement of asynchronous iteration mode for distributed power flow between multi-control-centers
-
ZHANG Haibo, ZHANG Boming, SUN Hongbin. Supplement and improvement of asynchronous iteration mode for distributed power flow between multi-control-centers. Automation of Electric Power Systems, 2007, 31(2): 12-16.
-
(2007)
Automation of Electric Power Systems
, vol.31
, Issue.2
, pp. 12-16
-
-
Zhang, H.1
Zhang, B.2
Sun, H.3
-
3
-
-
33750201774
-
Three-phase unbalanced radial distribution power flow analysis with wind farms considered
-
WANG Chengshan, GUINDO Maiiki. Three-phase unbalanced radial distribution power flow analysis with wind farms considered. Automation of Electric Power Systems, 2006, 30(16): 21-26.
-
(2006)
Automation of Electric Power Systems
, vol.30
, Issue.16
, pp. 21-26
-
-
Wang, C.1
Guindo, M.2
-
4
-
-
33748702550
-
Optimal reactive power planning of radial distribution systems with distributed generation
-
CHEN Lin, ZHONG Jin, NI Yixin, et al. Optimal reactive power planning of radial distribution systems with distributed generation. Automation of Electric Power Systems, 2006, 30(14): 20-24.
-
(2006)
Automation of Electric Power Systems
, vol.30
, Issue.14
, pp. 20-24
-
-
Chen, L.1
Zhong, J.2
Ni, Y.3
-
5
-
-
33749029254
-
Impact of large scale wind farm integration on power system transient stability
-
CHI Yongning, WANG Weisheng, LIU Yanhua, et al. Impact of large scale wind farm integration on power system transient stability. Automation of Electric Power Systems, 2006, 30(15): 10-14.
-
(2006)
Automation of Electric Power Systems
, vol.30
, Issue.15
, pp. 10-14
-
-
Chi, Y.1
Wang, W.2
Liu, Y.3
-
6
-
-
39149127894
-
Distributed and electric power system aggregation model and field configuration equivalency validation testing
-
DAVIS M, COSTYK D, NARANG A. Distributed and electric power system aggregation model and field configuration equivalency validation testing[R/OL].[2006-12-01]. http://www.osti.gov/bridge/.
-
(2006)
-
-
Davis, M.1
Costyk, D.2
Narang, A.3
-
7
-
-
0037973010
-
Protection relay coordination on ring-fed distribution network with distributed generations
-
Beijing, China
-
SO C W, LI K K. Protection relay coordination on ring-fed distribution network with distributed generations//Proceedings of 2002 IEEE Region 10 Conference on Computers, Communications, Control and Power Engineering: Vol 3, Oct 28-31, 2002, Beijing, China, 1885-1888.
-
(2002)
Proceedings of 2002 IEEE Region 10 Conference on Computers, Communications, Control and Power Engineering
, vol.3
, pp. 1885-1888
-
-
So, C.W.1
Li, K.K.2
-
8
-
-
0021439594
-
Integrating dispersed storage and generation (DSG) with an automated distribution system
-
DUGAN R C, THOMAS S A, RIZY D T. Integrating dispersed storage and generation (DSG) with an automated distribution system. IEEE Trans on Power Apparatus and Systems, 1984, 103(3): 1142-1146.
-
(1984)
IEEE Trans on Power Apparatus and Systems
, vol.103
, Issue.3
, pp. 1142-1146
-
-
Dugan, R.C.1
Thomas, S.A.2
Rizy, D.T.3
-
9
-
-
34047214544
-
IEEE 1547 IEEE standard for interconnecting distributed resources with electric power systems
-
IEEE 1547 IEEE standard for interconnecting distributed resources with electric power systems. 2003.
-
(2003)
-
-
-
10
-
-
34047212788
-
Computing the maximum penetrating level of distributed generators in distribution network by taking into account of harmonic constraints
-
JIANG Nan, GONG Jianrong, GAN Deqiang. Computing the maximum penetrating level of distributed generators in distribution network by taking into account of harmonic constraints. Automation of Electric Power Systems, 2007, 31(3): 19-23.
-
(2007)
Automation of Electric Power Systems
, vol.31
, Issue.3
, pp. 19-23
-
-
Jiang, N.1
Gong, J.2
Gan, D.3
-
11
-
-
33845786648
-
Penetration level calculation taking into consideration the unit commitment of small hydro power
-
XIA Xiang, HUANG Wei, XU Xianghai, et al. Penetration level calculation taking into consideration the unit commitment of small hydro power. Automation of Electric Power Systems, 2006, 30(22): 48-52.
-
(2006)
Automation of Electric Power Systems
, vol.30
, Issue.22
, pp. 48-52
-
-
Xia, X.1
Huang, W.2
Xu, X.3
-
12
-
-
33751410920
-
Computing the maximum penetration level of multiple distributed generators in distribution network taking into account voltage regulation constraints
-
HU Hua, WU Shan, XIA Xiang, et al. Computing the maximum penetration level of multiple distributed generators in distribution network taking into account voltage regulation constraints. Proceedings of the CSEE, 2006, 26(19): 13-19.
-
(2006)
Proceedings of the CSEE
, vol.26
, Issue.19
, pp. 13-19
-
-
Hu, H.1
Wu, S.2
Xia, X.3
-
14
-
-
0024045629
-
Optimal coordination of directional overcurrent relays in interconnected power systems
-
URDANETA A J, NADIRA R, PEREZ L G. Optimal coordination of directional overcurrent relays in interconnected power systems. IEEE Trans on Power Delivery, 1988, 3(3): 903-911.
-
(1988)
IEEE Trans on Power Delivery
, vol.3
, Issue.3
, pp. 903-911
-
-
Urdaneta, A.J.1
Nadira, R.2
Perez, L.G.3
-
15
-
-
0029520508
-
Application of adaptive reclosers to automatic distribution systems
-
Caracas, Venezuela
-
PEREZ L G, SORRENTINO E, HERNANDEN A E, et al. Application of adaptive reclosers to automatic distribution systems//Proceedings of IEEE PES Winter Meeting, Dec 12-14, 1995, Caracas, Venezuela: 159-163.
-
(1995)
Proceedings of IEEE PES Winter Meeting
, pp. 159-163
-
-
Perez, L.G.1
Sorrentino, E.2
Hernanden, A.E.3
-
16
-
-
39149125722
-
-
in Chinese
-
-
-
|