메뉴 건너뛰기




Volumn , Issue , 2007, Pages

Transmission system expansion planning considering outage cost

Author keywords

[No Author keywords available]

Indexed keywords

INVESTMENTS; MATHEMATICAL MODELS; OPTIMAL SYSTEMS; UNCERTAINTY ANALYSIS;

EID: 39049152467     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICICIC.2007.603     Document Type: Conference Paper
Times cited : (9)

References (11)
  • 3
    • 13844309159 scopus 로고
    • Expansion planning of Power Systems with Stepwise Cost Characteristics
    • written by Japanese, Aug
    • T.OKADA and Y.KAWAI, "Expansion planning of Power Systems with Stepwise Cost Characteristics" JIEEJ, Vol.90, No.8, pp.166-174, Aug.1970. (written by Japanese)
    • (1970) JIEEJ , vol.90 , Issue.8 , pp. 166-174
    • OKADA, T.1    KAWAI, Y.2
  • 4
    • 0016109975 scopus 로고
    • Transmission Expansion of Branch and Bound Integer Programming with Optimal Cost Capacity Curves
    • Aug
    • S.T.Y. Lee, K.L. Hocks, E. Hnyilicza, "Transmission Expansion of Branch and Bound Integer Programming with Optimal Cost Capacity Curves," IEEE, Trans. on PAS, vol. PAS-93, pp.1390-1400, Aug. 1970.
    • (1970) IEEE, Trans. on PAS , vol.PAS-93 , pp. 1390-1400
    • Lee, S.T.Y.1    Hocks, K.L.2    Hnyilicza, E.3
  • 5
    • 0034242059 scopus 로고    scopus 로고
    • Transmission network expansion planning under an improved genetic algorithm
    • Aug
    • E. L. Silva, H. A. Gil, J. M. Areiza, "Transmission network expansion planning under an improved genetic algorithm," IEEE Trans. Power Syst., vol. 15, pp. 1168-1175, Aug. 2000.
    • (2000) IEEE Trans. Power Syst , vol.15 , pp. 1168-1175
    • Silva, E.L.1    Gil, H.A.2    Areiza, J.M.3
  • 10
    • 14744306406 scopus 로고    scopus 로고
    • J. Choi, R. Billinton, M. Futuhi-Firuzabed, Development of a New Nodal Effective Load Model Considering of Transmission System Element Unavailabilities, at standby to be published by IEE proceedings on T&D 2005.
    • J. Choi, R. Billinton, M. Futuhi-Firuzabed, "Development of a New Nodal Effective Load Model Considering of Transmission System Element Unavailabilities," at standby to be published by IEE proceedings on T&D 2005.
  • 11
    • 24944564730 scopus 로고    scopus 로고
    • A Method for Transmission System Expansion Planning Considering Probabilistic Reliability Criteria
    • August
    • J.S. Choi. Trungtinh Tran, A. A. El-Keik, Robert Thomas, HyungSeon Oh, Roy Billinton: "A Method for Transmission System Expansion Planning Considering Probabilistic Reliability Criteria", IEEE Trans., Vol.20, August 2005, page 1606-1615.
    • (2005) IEEE Trans , vol.20 , pp. 1606-1615
    • Choi, J.S.1    Trungtinh Tran, A.2    El-Keik, A.3    Thomas, R.4    Oh, H.5    Billinton, R.6


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.