메뉴 건너뛰기




Volumn , Issue , 2007, Pages

Application of Analytic Network Process (ANP) in assessing construction risk of urban bridge project

Author keywords

[No Author keywords available]

Indexed keywords

BRIDGES; CONCRETE CONSTRUCTION; RISK ASSESSMENT; URBAN PLANNING;

EID: 39049096827     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICICIC.2007.172     Document Type: Conference Paper
Times cited : (19)

References (26)
  • 3
    • 0035313962 scopus 로고    scopus 로고
    • The Controlling Influences on Effective Risk Identification and Assessment for Construction Design Management
    • Chapman, R. J., "The Controlling Influences on Effective Risk Identification and Assessment for Construction Design Management," International Journal of Project Management, Vol.19, No.2 pp.147-160,2001.
    • (2001) International Journal of Project Management , vol.19 , Issue.2 , pp. 147-160
    • Chapman, R.J.1
  • 4
    • 0344267707 scopus 로고    scopus 로고
    • Contractual Risk and Liability Sharing in Hydropower Construction
    • Charoenngam, C. and Yeh, C. Y., "Contractual Risk and Liability Sharing in Hydropower Construction," International Journal of Project Management, Vol. 17, No. 1 pp.29-37, 1999.
    • (1999) International Journal of Project Management , vol.17 , Issue.1 , pp. 29-37
    • Charoenngam, C.1    Yeh, C.Y.2
  • 5
    • 0032332292 scopus 로고    scopus 로고
    • ConSERV, a Project Specific Risk Management Concept
    • Conroy, G. and Soltan, H., "ConSERV, a Project Specific Risk Management Concept," International Journal of Project Management, Vol.16, No.6 pp.353-366, 1998.
    • (1998) International Journal of Project Management , vol.16 , Issue.6 , pp. 353-366
    • Conroy, G.1    Soltan, H.2
  • 6
    • 12344283812 scopus 로고    scopus 로고
    • Analytic network process (ANP) approach for product mix planning in semiconductor fabricator
    • Chung S.H., Lee, H.I. and Pearn W.L., "Analytic network process (ANP) approach for product mix planning in semiconductor fabricator," Int. J. Production Economics, Vol.96, No.1 pp.15-36, 2005.
    • (2005) Int. J. Production Economics , vol.96 , Issue.1 , pp. 15-36
    • Chung, S.H.1    Lee, H.I.2    Pearn, W.L.3
  • 7
    • 0344894852 scopus 로고    scopus 로고
    • Estimating Project and Activity Duration: A Risk Management Approach Using Network Analysis
    • Dawood, N., "Estimating Project and Activity Duration: A Risk Management Approach Using Network Analysis," Construction Management and Economics, Vol.16, No.1 pp.41-48, 1998.
    • (1998) Construction Management and Economics , vol.16 , Issue.1 , pp. 41-48
    • Dawood, N.1
  • 10
    • 15944399746 scopus 로고    scopus 로고
    • Multidimensional data in multidimensional scaling using the analytic network process
    • Huang, J.J., Tzeng, G.H. and Ong C.S., "Multidimensional data in multidimensional scaling using the analytic network process," Pattern Recognition Letters, Vol.26, No.6 pp.755-767, 2005.
    • (2005) Pattern Recognition Letters , vol.26 , Issue.6 , pp. 755-767
    • Huang, J.J.1    Tzeng, G.H.2    Ong, C.S.3
  • 13
    • 0343826814 scopus 로고    scopus 로고
    • Using Risk Analysis to Determine Construction Project Contingencies
    • Mak, S. and Picken, D., "Using Risk Analysis to Determine Construction Project Contingencies," Journal of Construction Engineering and Management, Vol.126, No.2 pp.130-136, 2000.
    • (2000) Journal of Construction Engineering and Management , vol.126 , Issue.2 , pp. 130-136
    • Mak, S.1    Picken, D.2
  • 14
    • 33744823280 scopus 로고    scopus 로고
    • Analytic network process model for landslide hazard zonation
    • Neaupane, K.M. and Piantanakuluchai, M., "Analytic network process model for landslide hazard zonation," Engineering Geology, Vol.85, No.3-4 pp.281-294, 2006.
    • (2006) Engineering Geology , vol.85 , Issue.3-4 , pp. 281-294
    • Neaupane, K.M.1    Piantanakuluchai, M.2
  • 16
    • 49449122896 scopus 로고    scopus 로고
    • Saaty, T. L., A Scaling Method for Priorities in Hierarchical Structures, Journal of Mathematical Psychology, 15, No.3pp.234-281, 1997.
    • Saaty, T. L., "A Scaling Method for Priorities in Hierarchical Structures," Journal of Mathematical Psychology, Vol.15, No.3pp.234-281, 1997.
  • 19
    • 0032118577 scopus 로고    scopus 로고
    • Diagnosis with dependent symptoms: Bayes theorem and the analytic hierarchy process
    • Saaty, T.L., Vargas, L.G., "Diagnosis with dependent symptoms: Bayes theorem and the analytic hierarchy process," Operation Research, Vol.46, No.4 pp.491-502, 1998.
    • (1998) Operation Research , vol.46 , Issue.4 , pp. 491-502
    • Saaty, T.L.1    Vargas, L.G.2
  • 20
    • 0033099726 scopus 로고    scopus 로고
    • Small to Medium Contractor Contingency and Assumption of Risk
    • Smith, G. R. and Bohn, C. M., "Small to Medium Contractor Contingency and Assumption of Risk," Journal of Construction Engineering and Management, Vol.125, No.2 pp.101-108, 1999.
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.2 , pp. 101-108
    • Smith, G.R.1    Bohn, C.M.2
  • 21
    • 33748259237 scopus 로고    scopus 로고
    • Selection of logistics service provider: An analytic network process (ANP) approach
    • Sanjay, J. and Ravi, S., "Selection of logistics service provider: An analytic network process (ANP) approach," Omega, Vol.35, No.3 pp.274-289, 2007.
    • (2007) Omega , vol.35 , Issue.3 , pp. 274-289
    • Sanjay, J.1    Ravi, S.2
  • 22


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.