1
-
-
0031079503
-
Risk Analysis and Management in Construction
-
Akintoye A. S. and MacLeod M. J., "Risk Analysis and Management in Construction," International Journal of Project Management, Vol.15, No.1 pp. 131-38, 1997.
-
(1997)
International Journal of Project Management
, vol.15
, Issue.1
, pp. 131-138
-
-
Akintoye, A.S.1
MacLeod, M.J.2
-
2
-
-
0035313973
-
The Risk Ranking of Projects: A Methodology
-
Baccarini, D. and Archer, R., "The Risk Ranking of Projects: a Methodology," International Journal of Project Management, Vol.19, No.2 pp.139-145, 2001.
-
(2001)
International Journal of Project Management
, vol.19
, Issue.2
, pp. 139-145
-
-
Baccarini, D.1
Archer, R.2
-
3
-
-
0035313962
-
The Controlling Influences on Effective Risk Identification and Assessment for Construction Design Management
-
Chapman, R. J., "The Controlling Influences on Effective Risk Identification and Assessment for Construction Design Management," International Journal of Project Management, Vol.19, No.2 pp.147-160,2001.
-
(2001)
International Journal of Project Management
, vol.19
, Issue.2
, pp. 147-160
-
-
Chapman, R.J.1
-
4
-
-
0344267707
-
Contractual Risk and Liability Sharing in Hydropower Construction
-
Charoenngam, C. and Yeh, C. Y., "Contractual Risk and Liability Sharing in Hydropower Construction," International Journal of Project Management, Vol. 17, No. 1 pp.29-37, 1999.
-
(1999)
International Journal of Project Management
, vol.17
, Issue.1
, pp. 29-37
-
-
Charoenngam, C.1
Yeh, C.Y.2
-
5
-
-
0032332292
-
ConSERV, a Project Specific Risk Management Concept
-
Conroy, G. and Soltan, H., "ConSERV, a Project Specific Risk Management Concept," International Journal of Project Management, Vol.16, No.6 pp.353-366, 1998.
-
(1998)
International Journal of Project Management
, vol.16
, Issue.6
, pp. 353-366
-
-
Conroy, G.1
Soltan, H.2
-
6
-
-
12344283812
-
Analytic network process (ANP) approach for product mix planning in semiconductor fabricator
-
Chung S.H., Lee, H.I. and Pearn W.L., "Analytic network process (ANP) approach for product mix planning in semiconductor fabricator," Int. J. Production Economics, Vol.96, No.1 pp.15-36, 2005.
-
(2005)
Int. J. Production Economics
, vol.96
, Issue.1
, pp. 15-36
-
-
Chung, S.H.1
Lee, H.I.2
Pearn, W.L.3
-
7
-
-
0344894852
-
Estimating Project and Activity Duration: A Risk Management Approach Using Network Analysis
-
Dawood, N., "Estimating Project and Activity Duration: A Risk Management Approach Using Network Analysis," Construction Management and Economics, Vol.16, No.1 pp.41-48, 1998.
-
(1998)
Construction Management and Economics
, vol.16
, Issue.1
, pp. 41-48
-
-
Dawood, N.1
-
8
-
-
0033904040
-
Stochastic Budget Simulation
-
Elkjaer, M., "Stochastic Budget Simulation," International Journal of Project Management, Vol. 18, No.1 pp.139-147, 2000.
-
(2000)
International Journal of Project Management
, vol.18
, Issue.1
, pp. 139-147
-
-
Elkjaer, M.1
-
10
-
-
15944399746
-
Multidimensional data in multidimensional scaling using the analytic network process
-
Huang, J.J., Tzeng, G.H. and Ong C.S., "Multidimensional data in multidimensional scaling using the analytic network process," Pattern Recognition Letters, Vol.26, No.6 pp.755-767, 2005.
-
(2005)
Pattern Recognition Letters
, vol.26
, Issue.6
, pp. 755-767
-
-
Huang, J.J.1
Tzeng, G.H.2
Ong, C.S.3
-
11
-
-
34250836481
-
Construction Risk Assessment by Linguistics
-
Kangari, R. and Riggs, L.S., "Construction Risk Assessment by Linguistics," IEEE Transactions on Engineering Management, Vol.36, No.2 pp.126-131, 1989.
-
(1989)
IEEE Transactions on Engineering Management
, vol.36
, Issue.2
, pp. 126-131
-
-
Kangari, R.1
Riggs, L.S.2
-
12
-
-
39049123042
-
A Decision Support System for Planning and Design Tender Selection in Public Buildings
-
Hong Kong
-
Lu, S. T., Hsieh, T. Y., Lee, J. S. and Tzeng, G. H., "A Decision Support System for Planning and Design Tender Selection in Public Buildings," Proceedings of the First International Conference on Electronic Business, Hong Kong, 215-217, 2001.
-
(2001)
Proceedings of the First International Conference on Electronic Business
, pp. 215-217
-
-
Lu, S.T.1
Hsieh, T.Y.2
Lee, J.S.3
Tzeng, G.H.4
-
13
-
-
0343826814
-
Using Risk Analysis to Determine Construction Project Contingencies
-
Mak, S. and Picken, D., "Using Risk Analysis to Determine Construction Project Contingencies," Journal of Construction Engineering and Management, Vol.126, No.2 pp.130-136, 2000.
-
(2000)
Journal of Construction Engineering and Management
, vol.126
, Issue.2
, pp. 130-136
-
-
Mak, S.1
Picken, D.2
-
14
-
-
33744823280
-
Analytic network process model for landslide hazard zonation
-
Neaupane, K.M. and Piantanakuluchai, M., "Analytic network process model for landslide hazard zonation," Engineering Geology, Vol.85, No.3-4 pp.281-294, 2006.
-
(2006)
Engineering Geology
, vol.85
, Issue.3-4
, pp. 281-294
-
-
Neaupane, K.M.1
Piantanakuluchai, M.2
-
16
-
-
49449122896
-
-
Saaty, T. L., A Scaling Method for Priorities in Hierarchical Structures, Journal of Mathematical Psychology, 15, No.3pp.234-281, 1997.
-
Saaty, T. L., "A Scaling Method for Priorities in Hierarchical Structures," Journal of Mathematical Psychology, Vol.15, No.3pp.234-281, 1997.
-
-
-
-
19
-
-
0032118577
-
Diagnosis with dependent symptoms: Bayes theorem and the analytic hierarchy process
-
Saaty, T.L., Vargas, L.G., "Diagnosis with dependent symptoms: Bayes theorem and the analytic hierarchy process," Operation Research, Vol.46, No.4 pp.491-502, 1998.
-
(1998)
Operation Research
, vol.46
, Issue.4
, pp. 491-502
-
-
Saaty, T.L.1
Vargas, L.G.2
-
20
-
-
0033099726
-
Small to Medium Contractor Contingency and Assumption of Risk
-
Smith, G. R. and Bohn, C. M., "Small to Medium Contractor Contingency and Assumption of Risk," Journal of Construction Engineering and Management, Vol.125, No.2 pp.101-108, 1999.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.2
, pp. 101-108
-
-
Smith, G.R.1
Bohn, C.M.2
-
21
-
-
33748259237
-
Selection of logistics service provider: An analytic network process (ANP) approach
-
Sanjay, J. and Ravi, S., "Selection of logistics service provider: An analytic network process (ANP) approach," Omega, Vol.35, No.3 pp.274-289, 2007.
-
(2007)
Omega
, vol.35
, Issue.3
, pp. 274-289
-
-
Sanjay, J.1
Ravi, S.2
-
22
-
-
84993012288
-
Information Modeling for Project Risk Analysis and Management
-
Tah, J. H. M. and Carr, V., "Information Modeling for Project Risk Analysis and Management," Engineering, Construction and Architectural management, Vol.17, No.2 pp.107-119, 2000.
-
(2000)
Engineering, Construction and Architectural management
, vol.17
, Issue.2
, pp. 107-119
-
-
Tah, J.H.M.1
Carr, V.2
-
23
-
-
0035398703
-
Knowledge-Based Approach To Construction Project Risk Management
-
Tah, J. H. M. and Carr, V., "Knowledge-Based Approach To Construction Project Risk Management," Journal of Computing in Civil Engineering, ASCE, pp.170-177, 2001.
-
(2001)
Journal of Computing in Civil Engineering, ASCE
, pp. 170-177
-
-
Tah, J.H.M.1
Carr, V.2
-
25
-
-
0031076114
-
Robust Technology' in Risk Management
-
Titarenko, B. P., "Robust Technology' in Risk Management," International Journal of Project Management, Vol.15, No.1 pp.11-14, 1997.
-
(1997)
International Journal of Project Management
, vol.15
, Issue.1
, pp. 11-14
-
-
Titarenko, B.P.1
-
26
-
-
0005809609
-
Risk Management
-
Wideman, R. M., "Risk Management", Project Management Journal, Vol.17, No.4 pp.20-26, 1986.
-
(1986)
Project Management Journal
, vol.17
, Issue.4
, pp. 20-26
-
-
Wideman, R.M.1
|