메뉴 건너뛰기




Volumn 36, Issue 1-2, 2008, Pages 132-139

Optimal parallel machines scheduling with machine availability and eligibility constraints

Author keywords

Availability constraint; Branch and bound algorithm; Eligibility constraint; Maximum lateness; Parallel machine scheduling

Indexed keywords

ALGORITHMS; BRANCH AND BOUND METHOD; CONSTRAINT THEORY; PROBLEM SOLVING;

EID: 38949112196     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-006-0810-1     Document Type: Article
Times cited : (19)

References (25)
  • 3
    • 0021506728 scopus 로고
    • Scheduling on semi-identical processors
    • Schmidt G (1984) Scheduling on semi-identical processors. Zeitschrift für Oper Res A28:153-162
    • (1984) Zeitschrift für Oper Res , vol.28 , pp. 153-162
    • Schmidt, G.1
  • 4
    • 0023978728 scopus 로고
    • Scheduling independent tasks with deadlines on semi-identical processors
    • Schmidt G (1988) Scheduling independent tasks with deadlines on semi-identical processors. J Oper Res Soc 39:271-277
    • (1988) J Oper Res Soc , vol.39 , pp. 271-277
    • Schmidt, G.1
  • 6
    • 0031492360 scopus 로고    scopus 로고
    • Current trends in deterministic scheduling
    • Lee CY, Lei L, Pinedo M (1997) Current trends in deterministic scheduling. Ann Oper Res 70:1-41
    • (1997) Ann Oper Res , vol.70 , pp. 1-41
    • Lee, C.Y.1    Lei, L.2    Pinedo, M.3
  • 7
    • 0032362468 scopus 로고    scopus 로고
    • Machine scheduling with availability constraints
    • Sanlaville E, Schmidt G (1998) Machine scheduling with availability constraints. Acta Informatica 35:795-811
    • (1998) Acta Informatica , vol.35 , pp. 795-811
    • Sanlaville, E.1    Schmidt, G.2
  • 8
    • 0343963100 scopus 로고    scopus 로고
    • Scheduling with limited machine availability
    • Schmidt G (2000) Scheduling with limited machine availability. Eur J Oper Res 121:1-15
    • (2000) Eur J Oper Res , vol.121 , pp. 1-15
    • Schmidt, G.1
  • 10
    • 0031246527 scopus 로고    scopus 로고
    • Parallel machine scheduling with release time and machine eligibility restrictions
    • 1-2
    • Centeno G, Armacost RL (1997) Parallel machine scheduling with release time and machine eligibility restrictions. Comput Ind Eng 33(1-2): 273-276
    • (1997) Comput Ind Eng , vol.33 , pp. 273-276
    • Centeno, G.1    Armacost, R.L.2
  • 11
    • 1242265218 scopus 로고    scopus 로고
    • Minimizing makespan on parallel machines with release time and machine eligibility restrictions
    • 6
    • Centeno G, Armacost RL (2004) Minimizing makespan on parallel machines with release time and machine eligibility restrictions. Int J Prod Res 42(6):1243-1256
    • (2004) Int J Prod Res , vol.42 , pp. 1243-1256
    • Centeno, G.1    Armacost, R.L.2
  • 12
    • 74849101820 scopus 로고
    • Optimization and approximation in deterministic sequencing and scheduling: A survey
    • Graham RL, Lawer EL, Lenstra JK, Rinnooy Ken AHG (1979) Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann Discrete Math 5: 287-326
    • (1979) Ann Discrete Math , vol.5 , pp. 287-326
    • Graham, R.L.1    Lawer, E.L.2    Lenstra, J.K.3    Rinnooy Ken, A.H.G.4
  • 13
    • 0032136846 scopus 로고    scopus 로고
    • Parallel machines scheduling with machine shutdowns
    • 3
    • Hwang HC, Chang SY (1998) Parallel machines scheduling with machine shutdowns. Comput Math App 36(3): 21-31
    • (1998) Comput Math App , vol.36 , pp. 21-31
    • Hwang, H.C.1    Chang, S.Y.2
  • 14
    • 15344342575 scopus 로고    scopus 로고
    • The effect of machine availability on the worst-case performance
    • Hwang HC, Lee K, Chang SY (2005) The effect of machine availability on the worst-case performance. Discrete Appl Math 148:49-61
    • (2005) Discrete Appl Math , vol.148 , pp. 49-61
    • Hwang, H.C.1    Lee, K.2    Chang, S.Y.3
  • 15
    • 0032262155 scopus 로고    scopus 로고
    • Algorithm for multiprocessor scheduling with machine release time
    • Kellerer H (1998) Algorithm for multiprocessor scheduling with machine release time. IIE Trans 30:991-999
    • (1998) IIE Trans , vol.30 , pp. 991-999
    • Kellerer, H.1
  • 16
    • 0001880962 scopus 로고
    • Parallel machines scheduling with nonsimultaneous machine available time
    • Lee CY (1991) Parallel machines scheduling with nonsimultaneous machine available time. Discrete Appl Math 30:53-61
    • (1991) Discrete Appl Math , vol.30 , pp. 53-61
    • Lee, C.Y.1
  • 17
    • 0000541519 scopus 로고    scopus 로고
    • Machine scheduling with an availability constraint
    • Lee CY (1996) Machine scheduling with an availability constraint. J Global Optim 9:395-416
    • (1996) J Global Optim , vol.9 , pp. 395-416
    • Lee, C.Y.1
  • 18
    • 0001504672 scopus 로고    scopus 로고
    • A note on "parallel machine scheduling with non-simultaneous machine available time"
    • Lee CY, He Y, Tang G (2000) A note on "parallel machine scheduling with non-simultaneous machine available time". Discrete Appl Math 100:133-135
    • (2000) Discrete Appl Math , vol.100 , pp. 133-135
    • Lee, C.Y.1    He, Y.2    Tang, G.3
  • 19
    • 15344340708 scopus 로고    scopus 로고
    • Optimal parallel machines scheduling with availability constraints
    • Gharbi A, Haouari M (2005) Optimal parallel machines scheduling with availability constraints. Discrete Appl Math 148:63-87
    • (2005) Discrete Appl Math , vol.148 , pp. 63-87
    • Gharbi, A.1    Haouari, M.2
  • 20
    • 34250846679 scopus 로고    scopus 로고
    • A note on single-machine scheduling with learning effect and an availability constraint
    • Wu CC, Lee WC (2006) A note on single-machine scheduling with learning effect and an availability constraint. Int J Adv Manuf Technol DOI 10.1007/s00170-006-0469-7
    • (2006) Int J Adv Manuf Technol
    • Wu, C.C.1    Lee, W.C.2
  • 21
    • 0039001378 scopus 로고
    • Nearly on line scheduling of preemptive independent tasks
    • Sanlaville E (1995) Nearly on line scheduling of preemptive independent tasks. Discrete Appl Math 57: 229-241
    • (1995) Discrete Appl Math , vol.57 , pp. 229-241
    • Sanlaville, E.1
  • 22
    • 0016034348 scopus 로고
    • Some simple scheduling algorithms
    • Horn WA (1974) Some simple scheduling algorithms. Nav Res Log Quarterly 21:177-185
    • (1974) Nav Res Log Quarterly , vol.21 , pp. 177-185
    • Horn, W.A.1
  • 25
    • 1242320993 scopus 로고    scopus 로고
    • Parallel machine scheduling of machine-dependent jobs with unit-length
    • Lin Y, Li W (2004) Parallel machine scheduling of machine-dependent jobs with unit-length. Eur J Oper Res 156:261-266
    • (2004) Eur J Oper Res , vol.156 , pp. 261-266
    • Lin, Y.1    Li, W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.