-
1
-
-
0037209879
-
A tabu search based algorithm for minimizing the number of tool switches on a flexible machine
-
Al-Fawzan, M. A., K. S. Al-Sultan. 2002. A tabu search based algorithm for minimizing the number of tool switches on a flexible machine. Comput. Indust. Engrg. 44 35-47.
-
(2002)
Comput. Indust. Engrg
, vol.44
, pp. 35-47
-
-
Al-Fawzan, M.A.1
Al-Sultan, K.S.2
-
3
-
-
27844445109
-
Living in Dell time
-
Breen, B. 2004. Living in Dell time. Fast Company 88 86.
-
(2004)
Fast Company
, vol.88
, pp. 86
-
-
Breen, B.1
-
4
-
-
0001707164
-
Worst-case performance of approximation algorithms for tool management problems
-
Crama, Y., J. van de Klundert. 1999. Worst-case performance of approximation algorithms for tool management problems. Naval; Res. Logist. 46 445-462.
-
(1999)
Naval; Res. Logist
, vol.46
, pp. 445-462
-
-
Crama, Y.1
van de Klundert, J.2
-
5
-
-
0032011520
-
The power of virtual integration: An interview with Dell Computer's Michael Dell
-
Dell, M., J. Magretta. 1998. The power of virtual integration: An interview with Dell Computer's Michael Dell. Harvard Bus. Rev. 76(2) 72-84.
-
(1998)
Harvard Bus. Rev
, vol.76
, Issue.2
, pp. 72-84
-
-
Dell, M.1
Magretta, J.2
-
6
-
-
38849117234
-
A production scheduling heuristic for an electronics manufacturer with sequence dependent setup costs
-
Forthcoming
-
Monkman, S. K., D. J. Morrice, J. F. Bard. 2007. A production scheduling heuristic for an electronics manufacturer with sequence dependent setup costs. Eur. J. Oper. Res. Forthcoming.
-
(2007)
Eur. J. Oper. Res
-
-
Monkman, S.K.1
Morrice, D.J.2
Bard, J.F.3
-
7
-
-
0032386621
-
Assignment and sequencing models for the scheduling of process systems
-
Pinto, J. M., I. E. Grossmann. 1988. Assignment and sequencing models for the scheduling of process systems. Ann. Oper. Res. 81 433-466.
-
(1988)
Ann. Oper. Res
, vol.81
, pp. 433-466
-
-
Pinto, J.M.1
Grossmann, I.E.2
-
9
-
-
38849135689
-
-
Working paper, University of Texas at Austin, Austin, TX
-
Tanrisever, F., D. J. Morrice. 2005. Designing and operating a high-volume, make-to-order assembly line under uncertain demand. Working paper, University of Texas at Austin, Austin, TX.
-
(2005)
Designing and operating a high-volume, make-to-order assembly line under uncertain demand
-
-
Tanrisever, F.1
Morrice, D.J.2
-
10
-
-
0029338650
-
Scheduling groups of jobs on a single machine
-
Webster, S., K. R. Baker. 1995. Scheduling groups of jobs on a single machine. Oper. Res. 43(4) 692-703.
-
(1995)
Oper. Res
, vol.43
, Issue.4
, pp. 692-703
-
-
Webster, S.1
Baker, K.R.2
|