메뉴 건너뛰기




Volumn 37, Issue 3, 2007, Pages 209-219

Dell uses a new production-scheduling algorithm to accommodate increased product variety

Author keywords

Assemble to order. History: This paper was refereed; Heuristic; Optimization; Parallel lines; Product families; Production scheduling

Indexed keywords


EID: 38849209238     PISSN: 00922102     EISSN: 1526551X     Source Type: Journal    
DOI: 10.1287/inte.1060.0264     Document Type: Article
Times cited : (15)

References (10)
  • 1
    • 0037209879 scopus 로고    scopus 로고
    • A tabu search based algorithm for minimizing the number of tool switches on a flexible machine
    • Al-Fawzan, M. A., K. S. Al-Sultan. 2002. A tabu search based algorithm for minimizing the number of tool switches on a flexible machine. Comput. Indust. Engrg. 44 35-47.
    • (2002) Comput. Indust. Engrg , vol.44 , pp. 35-47
    • Al-Fawzan, M.A.1    Al-Sultan, K.S.2
  • 3
    • 27844445109 scopus 로고    scopus 로고
    • Living in Dell time
    • Breen, B. 2004. Living in Dell time. Fast Company 88 86.
    • (2004) Fast Company , vol.88 , pp. 86
    • Breen, B.1
  • 4
    • 0001707164 scopus 로고    scopus 로고
    • Worst-case performance of approximation algorithms for tool management problems
    • Crama, Y., J. van de Klundert. 1999. Worst-case performance of approximation algorithms for tool management problems. Naval; Res. Logist. 46 445-462.
    • (1999) Naval; Res. Logist , vol.46 , pp. 445-462
    • Crama, Y.1    van de Klundert, J.2
  • 5
    • 0032011520 scopus 로고    scopus 로고
    • The power of virtual integration: An interview with Dell Computer's Michael Dell
    • Dell, M., J. Magretta. 1998. The power of virtual integration: An interview with Dell Computer's Michael Dell. Harvard Bus. Rev. 76(2) 72-84.
    • (1998) Harvard Bus. Rev , vol.76 , Issue.2 , pp. 72-84
    • Dell, M.1    Magretta, J.2
  • 6
    • 38849117234 scopus 로고    scopus 로고
    • A production scheduling heuristic for an electronics manufacturer with sequence dependent setup costs
    • Forthcoming
    • Monkman, S. K., D. J. Morrice, J. F. Bard. 2007. A production scheduling heuristic for an electronics manufacturer with sequence dependent setup costs. Eur. J. Oper. Res. Forthcoming.
    • (2007) Eur. J. Oper. Res
    • Monkman, S.K.1    Morrice, D.J.2    Bard, J.F.3
  • 7
    • 0032386621 scopus 로고
    • Assignment and sequencing models for the scheduling of process systems
    • Pinto, J. M., I. E. Grossmann. 1988. Assignment and sequencing models for the scheduling of process systems. Ann. Oper. Res. 81 433-466.
    • (1988) Ann. Oper. Res , vol.81 , pp. 433-466
    • Pinto, J.M.1    Grossmann, I.E.2
  • 10
    • 0029338650 scopus 로고
    • Scheduling groups of jobs on a single machine
    • Webster, S., K. R. Baker. 1995. Scheduling groups of jobs on a single machine. Oper. Res. 43(4) 692-703.
    • (1995) Oper. Res , vol.43 , Issue.4 , pp. 692-703
    • Webster, S.1    Baker, K.R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.