-
1
-
-
0035250452
-
Relate, empower and free
-
Feb
-
Rayson P (2001) Relate, empower and free. Manufacturing Engineer, Feb, pp 8-12
-
(2001)
Manufacturing Engineer
, pp. 8-12
-
-
Rayson, P.1
-
2
-
-
0032637730
-
Collaboration rules of autonomous software agents
-
Talukdar SN (1999) Collaboration rules of autonomous software agents. Decis Support Syst 24:269-278
-
(1999)
Decis Support Syst
, vol.24
, pp. 269-278
-
-
Talukdar, S.N.1
-
3
-
-
0035165858
-
Synchronised Web applications for product development in the 21st century
-
Huang GQ, Lee SW, Mak KL (2001) Synchronised Web applications for product development in the 21st century. Int J Adv Manuf Technol 18:605-613
-
(2001)
Int J Adv Manuf Technol
, vol.18
, pp. 605-613
-
-
Huang, G.Q.1
Lee, S.W.2
Mak, K.L.3
-
4
-
-
0036568568
-
Web-based support for collaborative product design review
-
Huang GQ (2002) Web-based support for collaborative product design review. Comput Ind 48:71-88
-
(2002)
Comput Ind
, vol.48
, pp. 71-88
-
-
Huang, G.Q.1
-
5
-
-
0033332071
-
WWW-based collaborative system for integrated design and manufacturing
-
4
-
Chang HC, Lu FL (1999) WWW-based collaborative system for integrated design and manufacturing. Concurr Eng Res Appl 7(4):319-334
-
(1999)
Concurr Eng Res Appl
, vol.7
, pp. 319-334
-
-
Chang, H.C.1
Lu, F.L.2
-
8
-
-
0034809279
-
Developing and computer-aided environment to investigate the influence of design schedule changes on MRP
-
Ou-Yang C, Liu HC (2001) Developing and computer-aided environment to investigate the influence of design schedule changes on MRP. Int J Adv Manuf Technol 17:11-16
-
(2001)
Int J Adv Manuf Technol
, vol.17
, pp. 11-16
-
-
Ou-Yang, C.1
Liu, H.C.2
-
9
-
-
0030151011
-
A decision support tool for planning bills-of-material
-
3
-
Cunningham M, Higgins P, Browne J (1996) A decision support tool for planning bills-of-material. Prod Plan Control 7(3):312-328
-
(1996)
Prod Plan Control
, vol.7
, pp. 312-328
-
-
Cunningham, M.1
Higgins, P.2
Browne, J.3
-
10
-
-
84965936678
-
A data management model for design change control
-
4
-
Krishnamurthy K, Law KH (1995) A data management model for design change control. Concurr Eng Res Appl 3(4):329-343
-
(1995)
Concurr Eng Res Appl
, vol.3
, pp. 329-343
-
-
Krishnamurthy, K.1
Law, K.H.2
-
11
-
-
0011734915
-
Engineering change and manufacturing deployment in new product development
-
Susman GI (ed) Oxford University Press
-
Coughlin PD (1992) Engineering change and manufacturing deployment in new product development. In: Susman GI (ed) Integrated design and manufacturing for competitive advantage. Oxford University Press, pp 157-177
-
(1992)
Integrated Design and Manufacturing for Competitive Advantage
, pp. 157-177
-
-
Coughlin, P.D.1
-
12
-
-
0026414520
-
Engineering change management for long lead-time production environments
-
Reidelbach MA (1991) Engineering change management for long lead-time production environments. Prod Invent Manage J, 2nd Quarter, pp 84-88
-
(1991)
Prod Invent Manage J, 2nd Quarter
, pp. 84-88
-
-
Ma, R.1
-
14
-
-
31744440623
-
Production control framework for supply chain management-an application in the elevator manufacturing industry
-
20
-
Lu TP, Chang TM, Yih Y (2005) Production control framework for supply chain management-an application in the elevator manufacturing industry. Int J Prod Res 43(20):4219-4233
-
(2005)
Int J Prod Res
, vol.43
, pp. 4219-4233
-
-
Lu, T.P.1
Chang, T.M.2
Yih, Y.3
-
15
-
-
27744579304
-
Architecture and operational mechanism of networked manufacturing integrated platform
-
12
-
Fan Y, Huang C, Wang Y, Zhang L (2005) Architecture and operational mechanism of networked manufacturing integrated platform. Int J Prod Res 43(12):2615-2629
-
(2005)
Int J Prod Res
, vol.43
, pp. 2615-2629
-
-
Fan, Y.1
Huang, C.2
Wang, Y.3
Zhang, L.4
-
17
-
-
10444274970
-
Collaborative supply chain planning using the artificial neural network approach
-
8
-
Chiu M, Lin G (2004) Collaborative supply chain planning using the artificial neural network approach. J Manuf Technol Manag 15(8):787-796
-
(2004)
J Manuf Technol Manag
, vol.15
, pp. 787-796
-
-
Chiu, M.1
Lin, G.2
-
18
-
-
31744434723
-
Improving supply chain collaboration by linking intelligent agent to CPFR
-
20
-
Cardid M, Cigolini R, Marco DD (2005) Improving supply chain collaboration by linking intelligent agent to CPFR. Int J Prod Res 43(20):4191-4218
-
(2005)
Int J Prod Res
, vol.43
, pp. 4191-4218
-
-
Cardid, M.1
Cigolini, R.2
Marco, D.D.3
-
19
-
-
30844461556
-
Distributed project scheduling with information sharing in supply chains: Part I: An agent-based negotiation model
-
22
-
Lau JSK, Huang GQ, Mak KL, Liang L (2005) Distributed project scheduling with information sharing in supply chains: part I: an agent-based negotiation model. Int J Prod Res 43(22):4813-4838
-
(2005)
Int J Prod Res
, vol.43
, pp. 4813-4838
-
-
Lau, J.S.K.1
Huang, G.Q.2
Mak, K.L.3
Liang, L.4
-
20
-
-
0035387938
-
A multi-agent framework for automated online bargaining
-
4
-
Lin FR, Chang KY (2001) A multi-agent framework for automated online bargaining. IEEE Intell Syst 16(4):41-47
-
(2001)
IEEE Intell Syst
, vol.16
, pp. 41-47
-
-
Lin, F.R.1
Chang, K.Y.2
-
21
-
-
7744247341
-
InterMarket-towards intelligent mobile agent e-marketplaces
-
Kowalczyk R, Franczyk B, Speck A, Braun P, Eismann J, Rossak W (2002) InterMarket-towards intelligent mobile agent e-marketplaces. Proceedings of 9th Annual IEEE Int Conf Workshop Eng Computer-Based Syst pp 268-2752
-
(2002)
Proceedings of 9th Annual IEEE Int Conf Workshop Eng Computer-Based Syst
, pp. 268-2752
-
-
Kowalczyk, R.1
Franczyk, B.2
Speck, A.3
Braun, P.4
Eismann, J.5
Rossak, W.6
-
22
-
-
0343805765
-
Multiagent systems engineering: A methodology and language for designing agent systems
-
DeLoach SA (1999) Multiagent systems engineering: a methodology and language for designing agent systems. Proc Agent-Oriented Inf Syst (AOIS) 99
-
(1999)
Proc Agent-Oriented Inf Syst (AOIS) 99
-
-
Deloach, S.A.1
-
24
-
-
0032804027
-
ZEUS: A tool-kit for building distributed multi-agent systems
-
Nwana H, Ndumu D, Lee L, Collis J (1999) ZEUS: a tool-kit for building distributed multi-agent systems. J Appl Artif Intell 13:187-208
-
(1999)
J Appl Artif Intell
, vol.13
, pp. 187-208
-
-
Nwana, H.1
Ndumu, D.2
Lee, L.3
Collis, J.4
-
27
-
-
0036758148
-
A case study on the integration of APS and ERP in a steel processing plant
-
6
-
Wiers VCS (2002) A case study on the integration of APS and ERP in a steel processing plant. Prod Plan Control 13(6):552-560
-
(2002)
Prod Plan Control
, vol.13
, pp. 552-560
-
-
Wiers, V.C.S.1
-
28
-
-
0034694442
-
Autonomy and viability-measures for agent-based manufacturing systems
-
17
-
Huang CY, Nof SY (2000) Autonomy and viability-measures for agent-based manufacturing systems. Int J Prod Res 38(17):4129-4148
-
(2000)
Int J Prod Res
, vol.38
, pp. 4129-4148
-
-
Huang, C.Y.1
Nof, S.Y.2
|