메뉴 건너뛰기




Volumn 35, Issue 9-10, 2008, Pages 943-967

Developing an agent-based APS and ERP collaboration framework

Author keywords

Agent; APS; Collaboration; ERP

Indexed keywords

COMPETITIVE INTELLIGENCE; CUSTOMER SATISFACTION; MATHEMATICAL MODELS; SUPPLY CHAIN MANAGEMENT; SYSTEMS ANALYSIS;

EID: 38349155813     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-006-0779-9     Document Type: Article
Times cited : (19)

References (28)
  • 1
    • 0035250452 scopus 로고    scopus 로고
    • Relate, empower and free
    • Feb
    • Rayson P (2001) Relate, empower and free. Manufacturing Engineer, Feb, pp 8-12
    • (2001) Manufacturing Engineer , pp. 8-12
    • Rayson, P.1
  • 2
    • 0032637730 scopus 로고    scopus 로고
    • Collaboration rules of autonomous software agents
    • Talukdar SN (1999) Collaboration rules of autonomous software agents. Decis Support Syst 24:269-278
    • (1999) Decis Support Syst , vol.24 , pp. 269-278
    • Talukdar, S.N.1
  • 3
    • 0035165858 scopus 로고    scopus 로고
    • Synchronised Web applications for product development in the 21st century
    • Huang GQ, Lee SW, Mak KL (2001) Synchronised Web applications for product development in the 21st century. Int J Adv Manuf Technol 18:605-613
    • (2001) Int J Adv Manuf Technol , vol.18 , pp. 605-613
    • Huang, G.Q.1    Lee, S.W.2    Mak, K.L.3
  • 4
    • 0036568568 scopus 로고    scopus 로고
    • Web-based support for collaborative product design review
    • Huang GQ (2002) Web-based support for collaborative product design review. Comput Ind 48:71-88
    • (2002) Comput Ind , vol.48 , pp. 71-88
    • Huang, G.Q.1
  • 5
    • 0033332071 scopus 로고    scopus 로고
    • WWW-based collaborative system for integrated design and manufacturing
    • 4
    • Chang HC, Lu FL (1999) WWW-based collaborative system for integrated design and manufacturing. Concurr Eng Res Appl 7(4):319-334
    • (1999) Concurr Eng Res Appl , vol.7 , pp. 319-334
    • Chang, H.C.1    Lu, F.L.2
  • 8
    • 0034809279 scopus 로고    scopus 로고
    • Developing and computer-aided environment to investigate the influence of design schedule changes on MRP
    • Ou-Yang C, Liu HC (2001) Developing and computer-aided environment to investigate the influence of design schedule changes on MRP. Int J Adv Manuf Technol 17:11-16
    • (2001) Int J Adv Manuf Technol , vol.17 , pp. 11-16
    • Ou-Yang, C.1    Liu, H.C.2
  • 9
    • 0030151011 scopus 로고    scopus 로고
    • A decision support tool for planning bills-of-material
    • 3
    • Cunningham M, Higgins P, Browne J (1996) A decision support tool for planning bills-of-material. Prod Plan Control 7(3):312-328
    • (1996) Prod Plan Control , vol.7 , pp. 312-328
    • Cunningham, M.1    Higgins, P.2    Browne, J.3
  • 10
    • 84965936678 scopus 로고
    • A data management model for design change control
    • 4
    • Krishnamurthy K, Law KH (1995) A data management model for design change control. Concurr Eng Res Appl 3(4):329-343
    • (1995) Concurr Eng Res Appl , vol.3 , pp. 329-343
    • Krishnamurthy, K.1    Law, K.H.2
  • 11
    • 0011734915 scopus 로고
    • Engineering change and manufacturing deployment in new product development
    • Susman GI (ed) Oxford University Press
    • Coughlin PD (1992) Engineering change and manufacturing deployment in new product development. In: Susman GI (ed) Integrated design and manufacturing for competitive advantage. Oxford University Press, pp 157-177
    • (1992) Integrated Design and Manufacturing for Competitive Advantage , pp. 157-177
    • Coughlin, P.D.1
  • 12
    • 0026414520 scopus 로고
    • Engineering change management for long lead-time production environments
    • Reidelbach MA (1991) Engineering change management for long lead-time production environments. Prod Invent Manage J, 2nd Quarter, pp 84-88
    • (1991) Prod Invent Manage J, 2nd Quarter , pp. 84-88
    • Ma, R.1
  • 14
    • 31744440623 scopus 로고    scopus 로고
    • Production control framework for supply chain management-an application in the elevator manufacturing industry
    • 20
    • Lu TP, Chang TM, Yih Y (2005) Production control framework for supply chain management-an application in the elevator manufacturing industry. Int J Prod Res 43(20):4219-4233
    • (2005) Int J Prod Res , vol.43 , pp. 4219-4233
    • Lu, T.P.1    Chang, T.M.2    Yih, Y.3
  • 15
    • 27744579304 scopus 로고    scopus 로고
    • Architecture and operational mechanism of networked manufacturing integrated platform
    • 12
    • Fan Y, Huang C, Wang Y, Zhang L (2005) Architecture and operational mechanism of networked manufacturing integrated platform. Int J Prod Res 43(12):2615-2629
    • (2005) Int J Prod Res , vol.43 , pp. 2615-2629
    • Fan, Y.1    Huang, C.2    Wang, Y.3    Zhang, L.4
  • 17
    • 10444274970 scopus 로고    scopus 로고
    • Collaborative supply chain planning using the artificial neural network approach
    • 8
    • Chiu M, Lin G (2004) Collaborative supply chain planning using the artificial neural network approach. J Manuf Technol Manag 15(8):787-796
    • (2004) J Manuf Technol Manag , vol.15 , pp. 787-796
    • Chiu, M.1    Lin, G.2
  • 18
    • 31744434723 scopus 로고    scopus 로고
    • Improving supply chain collaboration by linking intelligent agent to CPFR
    • 20
    • Cardid M, Cigolini R, Marco DD (2005) Improving supply chain collaboration by linking intelligent agent to CPFR. Int J Prod Res 43(20):4191-4218
    • (2005) Int J Prod Res , vol.43 , pp. 4191-4218
    • Cardid, M.1    Cigolini, R.2    Marco, D.D.3
  • 19
    • 30844461556 scopus 로고    scopus 로고
    • Distributed project scheduling with information sharing in supply chains: Part I: An agent-based negotiation model
    • 22
    • Lau JSK, Huang GQ, Mak KL, Liang L (2005) Distributed project scheduling with information sharing in supply chains: part I: an agent-based negotiation model. Int J Prod Res 43(22):4813-4838
    • (2005) Int J Prod Res , vol.43 , pp. 4813-4838
    • Lau, J.S.K.1    Huang, G.Q.2    Mak, K.L.3    Liang, L.4
  • 20
    • 0035387938 scopus 로고    scopus 로고
    • A multi-agent framework for automated online bargaining
    • 4
    • Lin FR, Chang KY (2001) A multi-agent framework for automated online bargaining. IEEE Intell Syst 16(4):41-47
    • (2001) IEEE Intell Syst , vol.16 , pp. 41-47
    • Lin, F.R.1    Chang, K.Y.2
  • 22
    • 0343805765 scopus 로고    scopus 로고
    • Multiagent systems engineering: A methodology and language for designing agent systems
    • DeLoach SA (1999) Multiagent systems engineering: a methodology and language for designing agent systems. Proc Agent-Oriented Inf Syst (AOIS) 99
    • (1999) Proc Agent-Oriented Inf Syst (AOIS) 99
    • Deloach, S.A.1
  • 24
    • 0032804027 scopus 로고    scopus 로고
    • ZEUS: A tool-kit for building distributed multi-agent systems
    • Nwana H, Ndumu D, Lee L, Collis J (1999) ZEUS: a tool-kit for building distributed multi-agent systems. J Appl Artif Intell 13:187-208
    • (1999) J Appl Artif Intell , vol.13 , pp. 187-208
    • Nwana, H.1    Ndumu, D.2    Lee, L.3    Collis, J.4
  • 27
    • 0036758148 scopus 로고    scopus 로고
    • A case study on the integration of APS and ERP in a steel processing plant
    • 6
    • Wiers VCS (2002) A case study on the integration of APS and ERP in a steel processing plant. Prod Plan Control 13(6):552-560
    • (2002) Prod Plan Control , vol.13 , pp. 552-560
    • Wiers, V.C.S.1
  • 28
    • 0034694442 scopus 로고    scopus 로고
    • Autonomy and viability-measures for agent-based manufacturing systems
    • 17
    • Huang CY, Nof SY (2000) Autonomy and viability-measures for agent-based manufacturing systems. Int J Prod Res 38(17):4129-4148
    • (2000) Int J Prod Res , vol.38 , pp. 4129-4148
    • Huang, C.Y.1    Nof, S.Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.