메뉴 건너뛰기




Volumn 4692 LNAI, Issue PART 1, 2007, Pages 172-179

An investigation of agent-based hybrid approach to solve flowshop and job-shop scheduling problems

Author keywords

A team; Flow shop and job shop scheduling; Population learning algorithm

Indexed keywords

ALGORITHMS; LEARNING SYSTEMS; SCHEDULING;

EID: 38149141661     PISSN: 03029743     EISSN: 16113349     Source Type: Book Series    
DOI: None     Document Type: Conference Paper
Times cited : (1)

References (17)
  • 1
    • 3142729923 scopus 로고    scopus 로고
    • Teams of Autonomous Agents for Job-Shop Scheduling Problems. An Experimental Study
    • Aydin, M.E., Fogarty, T.C.: Teams of Autonomous Agents for Job-Shop Scheduling Problems. An Experimental Study, Journal of Intelligent Manufacturing 15(4), 455-462 (2004)
    • (2004) Journal of Intelligent Manufacturing , vol.15 , Issue.4 , pp. 455-462
    • Aydin, M.E.1    Fogarty, T.C.2
  • 2
    • 4944232011 scopus 로고    scopus 로고
    • A Simulated Annealing Algorithm for Multi-agent Systems: A Job-Shop Scheduling Application
    • Aydin, M.E., Fogarty, T.C.: A Simulated Annealing Algorithm for Multi-agent Systems: a Job-Shop Scheduling Application. Journal of Intelligent Manufacturing 15(6), 805-814 (2004)
    • (2004) Journal of Intelligent Manufacturing , vol.15 , Issue.6 , pp. 805-814
    • Aydin, M.E.1    Fogarty, T.C.2
  • 3
    • 38149086365 scopus 로고    scopus 로고
    • Bellifemine, F., Caire, G., Poggi, A., Rimossa, G.: JADE. A White Paper 3(3), 6-20 (2003)
    • Bellifemine, F., Caire, G., Poggi, A., Rimossa, G.: JADE. A White Paper 3(3), 6-20 (2003)
  • 5
    • 84989487658 scopus 로고
    • Heuristics for Integer Programming Using Surrogate Constraints
    • Glover, F.: Heuristics for Integer Programming Using Surrogate Constraints. Decision Sciences, 8(1), 156-166 (1977)
    • (1977) Decision Sciences , vol.8 , Issue.1 , pp. 156-166
    • Glover, F.1
  • 8
    • 26944480382 scopus 로고    scopus 로고
    • Jȩdrzejowicz, J., Jȩdrzejowicz, P.: New Upper Bounds for the Permutation Flowshop Scheduling problem. In: Ali, M., Esposito, F. (eds.) IEA/AIE 2005. LNCS (LNAI), 3533, pp. 232-235. Springer, Heidelberg (2005)
    • Jȩdrzejowicz, J., Jȩdrzejowicz, P.: New Upper Bounds for the Permutation Flowshop Scheduling problem. In: Ali, M., Esposito, F. (eds.) IEA/AIE 2005. LNCS (LNAI), vol. 3533, pp. 232-235. Springer, Heidelberg (2005)
  • 9
    • 33746191298 scopus 로고    scopus 로고
    • Jȩdrzejowicz, J., Jȩdrzejowicz, P.: Agent-Based Approach to Solving Difficult Scheduling Problems. In: Ali, M., Dapoigny, R. (eds.) IEA/AIE 2006. LNCS (LNAI), 4031, pp. 24-33. Springer, Heidelberg (2006)
    • Jȩdrzejowicz, J., Jȩdrzejowicz, P.: Agent-Based Approach to Solving Difficult Scheduling Problems. In: Ali, M., Dapoigny, R. (eds.) IEA/AIE 2006. LNCS (LNAI), vol. 4031, pp. 24-33. Springer, Heidelberg (2006)
  • 10
    • 33746770456 scopus 로고    scopus 로고
    • JADE-Based A-Team Environment
    • Alexandrov, V.N, van Albada, G.D, Sloot, P.M.A, Dongarra, J.J, eds, ICCS, Springer, Heidelberg
    • Jȩdrzejowicz, P., Wierzbowska, I.: JADE-Based A-Team Environment. In: Alexandrov, V.N., van Albada, G.D., Sloot, P.M.A., Dongarra, J.J. (eds.) ICCS 2006. LNCS, vol. 3993, pp. 719-726. Springer, Heidelberg (2006)
    • (2006) LNCS , vol.3993 , pp. 719-726
    • Jȩdrzejowicz, P.1    Wierzbowska, I.2
  • 11
    • 26444479778 scopus 로고
    • Optimization by Simulated Annealing
    • Kirkpatrick, S.: Optimization by Simulated Annealing. Science 220, 671-680 (1983)
    • (1983) Science , vol.220 , pp. 671-680
    • Kirkpatrick, S.1
  • 12
    • 0033078591 scopus 로고    scopus 로고
    • Some New Results on Simulated Annealing Applied to Job Shop Scheduling Problem
    • Kolonko, M.: Some New Results on Simulated Annealing Applied to Job Shop Scheduling Problem. European Journal of Operational Research 113, 123-136 (1999)
    • (1999) European Journal of Operational Research , vol.113 , pp. 123-136
    • Kolonko, M.1
  • 13
  • 14
    • 0345982691 scopus 로고    scopus 로고
    • Agents in Overalls: Experiences and Issues in the Development and Deployment of Industrial Agent-Based Systems, Intern
    • Parunak, H.V.D.: Agents in Overalls: Experiences and Issues in the Development and Deployment of Industrial Agent-Based Systems, Intern. J. of Cooperative Information Systems 9(3), 209-228 (2000)
    • (2000) J. of Cooperative Information Systems , vol.9 , Issue.3 , pp. 209-228
    • Parunak, H.V.D.1
  • 17
    • 0043159634 scopus 로고    scopus 로고
    • Asynchronous Teams: Cooperation Schemes for Autonomous, Computer-Based Agents
    • 18-59-96, Carnegie Mellon University, Pittsburgh
    • Talukdar, S., Baerentzen, L., Gove, A., de Souza, P.: Asynchronous Teams: Cooperation Schemes for Autonomous, Computer-Based Agents, Technical Report EDRC 18-59-96, Carnegie Mellon University, Pittsburgh (1996)
    • (1996) Technical Report EDRC
    • Talukdar, S.1    Baerentzen, L.2    Gove, A.3    de Souza, P.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.