-
1
-
-
38049038024
-
The new idea of generic type models general objectives of the project risk analysis theory research
-
Beijing
-
Cunbin LI, "The new idea of generic type models general objectives of the project risk analysis theory research". Technological Economy, Beijing,2004(7),pp.56-58.
-
(2004)
Technological Economy
, Issue.7
, pp. 56-58
-
-
Cunbin, L.I.1
-
2
-
-
38049084891
-
-
Ni Ji., the use of Markov Chain with Absorbable State Commecial Research,Shandong,2000,pp.75-76.
-
Ni Ji., "the use of Markov Chain with Absorbable State" Commecial Research,Shandong,2000,pp.75-76.
-
-
-
-
4
-
-
38049005085
-
The Application of Markov Process in the Analysis of Banks' Undesirable Assets Risk
-
Sun Xingqiang. "The Application of Markov Process in the Analysis of Banks' Undesirable Assets Risk". Journal of Shaoxing University,Shaoxing, 2002(08),pp.13-15.
-
(2002)
Journal of Shaoxing University,Shaoxing
, Issue.8
, pp. 13-15
-
-
Xingqiang, S.1
-
5
-
-
38048998700
-
The Research of Markov Chain Theory and Its Applications in the Field of Economic Management
-
Nanjing
-
Xia Letian. "The Research of Markov Chain Theory and Its Applications in the Field of Economic Management", For the Degree of Master of Mathematic, Nanjing 2006(02).
-
(2006)
For the Degree of Master of Mathematic
, Issue.2
-
-
Letian, X.1
-
6
-
-
38049092175
-
The Risk Management of Bank Loans Based on Markov Chain with Absorbable State
-
Guangdong
-
Liu Xiaoxing."The Risk Management of Bank Loans Based on Markov Chain with Absorbable State" .Modem Management Science,Guangdong,2006,pp. 96-98.
-
(2006)
Modem Management Science
, pp. 96-98
-
-
Xiaoxing, L.1
-
8
-
-
38049049904
-
On the Establishment and Application of Risk Evaluation System of Engineering Project Contracting
-
Construction & Design for Project,2006,pp.94-97
-
Chen wei, "On the Establishment and Application of Risk Evaluation System of Engineering Project Contracting", Construction & Design for Project,2006,pp.94-97.
-
-
-
wei, C.1
-
9
-
-
38049011040
-
-
Li Wan qing Wei Zhao bin. Analysis Of Risk Factor In Construction Contracting Based On Markov Building Technique Development,2003.pp.85-87.
-
Li Wan qing Wei Zhao bin. "Analysis Of Risk Factor In Construction Contracting Based On Markov" Building Technique Development,2003.pp.85-87.
-
-
-
-
10
-
-
38049006616
-
-
Li Wanqing, We Zhaobin, Meng Wenqing, the Application of Fuzzy AHP Comprehensive Evaluation Method to Engineering Contracting Risk Evaluation, Optimization of Capital Construction, Hebei Institute of Architectural Science and Technology ,2003,pp.20-22.
-
Li Wanqing, We Zhaobin, Meng Wenqing, "the Application of Fuzzy AHP Comprehensive Evaluation Method to Engineering Contracting Risk Evaluation", Optimization of Capital Construction, Hebei Institute of Architectural Science and Technology ,2003,pp.20-22.
-
-
-
-
11
-
-
38049010125
-
Analysis on the Risk of Engineering Project
-
Shenyang, Northeast University
-
Xu Hengsheng, Liu Tiemin. "Analysis on the Risk of Engineering Project", Optimization of Capital Construction, Shenyang, Northeast University,2005,pp.34-38.
-
(2005)
Optimization of Capital Construction
, pp. 34-38
-
-
Hengsheng, X.1
Tiemin, L.2
|