|
Volumn 105, Issue 11, 2007, Pages 577-582
|
Emergency operation of a 3AC 50 Hz power grid in the Lötschberg base tunnel;Notbetrieb der Energieversorgung 3AC 50 Hz im Lötschberg-basistunnel
|
Author keywords
[No Author keywords available]
|
Indexed keywords
GRID COMPUTING;
POWER PLANTS;
RAILROAD TRANSPORTATION;
TUNNELS;
BASE TUNNELS;
EMERGENCY OPERATION;
KANDERGRUND FEEDS;
POWER SUPPLY CIRCUITS;
|
EID: 37749010601
PISSN: 00135437
EISSN: None
Source Type: Trade Journal
DOI: None Document Type: Article |
Times cited : (2)
|
References (2)
|