메뉴 건너뛰기




Volumn 17, Issue 4, 2007, Pages 582-586

A Heuristic Genetic Algorithm for No-Wait Flowshop Scheduling Problem

Author keywords

flowshop; genetic algorithm; no wait; production scheduling; TP 278

Indexed keywords

COMBINATORIAL OPTIMIZATION; CONVERGENCE OF NUMERICAL METHODS; GENETIC ALGORITHMS; HEURISTIC ALGORITHMS; PROBLEM SOLVING; SCHEDULING;

EID: 37349003784     PISSN: 10061266     EISSN: None     Source Type: Journal    
DOI: 10.1016/S1006-1266(07)60150-3     Document Type: Article
Times cited : (19)

References (8)
  • 1
    • 0032162519 scopus 로고    scopus 로고
    • Total flowtime in no-wait flowshops with separated setup times
    • Aldowaisan T., and Allahverdi A. Total flowtime in no-wait flowshops with separated setup times. Computers and Operations Research 25 9 (1998) 757-765
    • (1998) Computers and Operations Research , vol.25 , Issue.9 , pp. 757-765
    • Aldowaisan, T.1    Allahverdi, A.2
  • 2
    • 0034315880 scopus 로고    scopus 로고
    • Heuristic algorithm for scheduling in the no-wait flowshop
    • Bertolissi E. Heuristic algorithm for scheduling in the no-wait flowshop. Journal of Material Processing Technology 107 1-3 (2000) 459-465
    • (2000) Journal of Material Processing Technology , vol.107 , Issue.1-3 , pp. 459-465
    • Bertolissi, E.1
  • 3
    • 0030134958 scopus 로고    scopus 로고
    • A survey of machine scheduling problems with blocking and no-wait in process
    • Hall N., and Sriskandarajah C. A survey of machine scheduling problems with blocking and no-wait in process. Operations Research 44 3 (1996) 510-525
    • (1996) Operations Research , vol.44 , Issue.3 , pp. 510-525
    • Hall, N.1    Sriskandarajah, C.2
  • 5
    • 17244378471 scopus 로고    scopus 로고
    • Interactive genetic algorithm based on landscape of satisfaction and taboos
    • (In Chinese)
    • Hao G., Gong D., Shi Y., et al. Interactive genetic algorithm based on landscape of satisfaction and taboos. Journal of China University of Mining & Technology 34 2 (2005) 204-208 (In Chinese)
    • (2005) Journal of China University of Mining & Technology , vol.34 , Issue.2 , pp. 204-208
    • Hao, G.1    Gong, D.2    Shi, Y.3
  • 6
    • 2642569957 scopus 로고    scopus 로고
    • New heuristics for m-machine no-wait flowshop to minimize total completion time
    • Aldowaisan T., and Allahverdi A. New heuristics for m-machine no-wait flowshop to minimize total completion time. Omega 32 5 (2004) 345-352
    • (2004) Omega , vol.32 , Issue.5 , pp. 345-352
    • Aldowaisan, T.1    Allahverdi, A.2
  • 7
    • 0346009089 scopus 로고    scopus 로고
    • Improved genetic algorithm for the permutation flowshop scheduling problem
    • Srikanth K., and Barkha S. Improved genetic algorithm for the permutation flowshop scheduling problem. Computers & Operations Research 31 4 (2004) 593-606
    • (2004) Computers & Operations Research , vol.31 , Issue.4 , pp. 593-606
    • Srikanth, K.1    Barkha, S.2
  • 8
    • 0030241758 scopus 로고    scopus 로고
    • Genetic algorithms applied to the continuous flow shop problem
    • Chen C., and Neppalli R. Genetic algorithms applied to the continuous flow shop problem. Computers & Industrial Engineering 30 4 (1996) 919-929
    • (1996) Computers & Industrial Engineering , vol.30 , Issue.4 , pp. 919-929
    • Chen, C.1    Neppalli, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.