-
1
-
-
0001233812
-
Improved algorithms for economic lot size problems
-
Aggarwal A., and Park J.K. Improved algorithms for economic lot size problems. Operations Research 41 3 (1993) 549-571
-
(1993)
Operations Research
, vol.41
, Issue.3
, pp. 549-571
-
-
Aggarwal, A.1
Park, J.K.2
-
2
-
-
0032639383
-
Lot sizing with backordering and start-ups: The case of Wagner-Whitin costs
-
Agra A., and Constantino M. Lot sizing with backordering and start-ups: The case of Wagner-Whitin costs. Operations Research Letters 25 (1999) 81-88
-
(1999)
Operations Research Letters
, vol.25
, pp. 81-88
-
-
Agra, A.1
Constantino, M.2
-
4
-
-
0033114757
-
A review of scheduling research involving setup considerations
-
Allahverdi A., Gupta J.N.D., and Aldowaisan T. A review of scheduling research involving setup considerations. Omega 27 (1999) 219-239
-
(1999)
Omega
, vol.27
, pp. 219-239
-
-
Allahverdi, A.1
Gupta, J.N.D.2
Aldowaisan, T.3
-
5
-
-
36849082395
-
-
Allahverdi, A., Ng, C.T., Cheng, T.C.E., Kovalyov, M.Y., this issue. A survey of scheduling problems with setup times or costs. European Journal of Operational Research, doi:10.1016/j.ejor.2006.06.060.
-
-
-
-
6
-
-
36849000011
-
-
Berk, E., Toy, A.Ö., Hazi{dotless}r, Ö., 2006. Single item lot sizing problem for a warm/cold process with immediate lost sales: Extended version with proofs. Working Paper #2006-1, Faculty of Business Administration, Bilkent University.
-
-
-
-
7
-
-
0020194024
-
Computational complexity of the capacitated lot size problem
-
Bitran G.R., and Yanasse H.H. Computational complexity of the capacitated lot size problem. Management Science 28 10 (1982) 1174-1186
-
(1982)
Management Science
, vol.28
, Issue.10
, pp. 1174-1186
-
-
Bitran, G.R.1
Yanasse, H.H.2
-
9
-
-
0343878239
-
The discrete lot-sizing and scheduling problem: Complexity and modification for batch availability
-
Bruggemann W., and Jahnke H. The discrete lot-sizing and scheduling problem: Complexity and modification for batch availability. European Journal of Operational Research 124 (2000) 511-528
-
(2000)
European Journal of Operational Research
, vol.124
, pp. 511-528
-
-
Bruggemann, W.1
Jahnke, H.2
-
10
-
-
0001537142
-
2) algorithm for the NI/G/NI/ND capacitated lot size problem
-
2) algorithm for the NI/G/NI/ND capacitated lot size problem. Management Science 34 (1988) 420-426
-
(1988)
Management Science
, vol.34
, pp. 420-426
-
-
Chung, C.1
Lin, C.H.M.2
-
11
-
-
0032667510
-
Production lot sizing with variable production rate and explicit idle capacity cost
-
Eiamkanchanalai S., and Banerjee A. Production lot sizing with variable production rate and explicit idle capacity cost. International Journal of Production Economics 59 (1999) 251-259
-
(1999)
International Journal of Production Economics
, vol.59
, pp. 251-259
-
-
Eiamkanchanalai, S.1
Banerjee, A.2
-
12
-
-
0023456043
-
Solving multi-item capacitated lot-sizing problems using variable redefinition
-
Eppen G.D., and Martin R.K. Solving multi-item capacitated lot-sizing problems using variable redefinition. Operations Research 35 6 (1987) 832-848
-
(1987)
Operations Research
, vol.35
, Issue.6
, pp. 832-848
-
-
Eppen, G.D.1
Martin, R.K.2
-
14
-
-
0002144134
-
Deterministic production planning with concave costs and capacity constraints
-
Florian M., and Klein M. Deterministic production planning with concave costs and capacity constraints. Management Science 18 1 (1971) 12-20
-
(1971)
Management Science
, vol.18
, Issue.1
, pp. 12-20
-
-
Florian, M.1
Klein, M.2
-
15
-
-
0027594688
-
Reduced production rates in the economic lot scheduling problem
-
Gallego G. Reduced production rates in the economic lot scheduling problem. International Journal of Production Research 31 (1993) 1035-1046
-
(1993)
International Journal of Production Research
, vol.31
, pp. 1035-1046
-
-
Gallego, G.1
-
16
-
-
5644274147
-
The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
-
Gupta D., and Magnusson T. The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times. Computers and Operations Research 32 (2005) 727-747
-
(2005)
Computers and Operations Research
, vol.32
, pp. 727-747
-
-
Gupta, D.1
Magnusson, T.2
-
17
-
-
0029389257
-
Efficient solution of the single-item, capacitated lot-sizing problem with start-up and reservation costs
-
Hindi K.S. Efficient solution of the single-item, capacitated lot-sizing problem with start-up and reservation costs. Journal of Operational Research Society 46 10 (1995) 1223-1236
-
(1995)
Journal of Operational Research Society
, vol.46
, Issue.10
, pp. 1223-1236
-
-
Hindi, K.S.1
-
18
-
-
0029389879
-
Solving the single-item, capacitated dynamic lot-sizing problem with startup and reservation costs by tabu search
-
Hindi K.S. Solving the single-item, capacitated dynamic lot-sizing problem with startup and reservation costs by tabu search. Computers and Industrial Engineering 28 4 (1995) 701-707
-
(1995)
Computers and Industrial Engineering
, vol.28
, Issue.4
, pp. 701-707
-
-
Hindi, K.S.1
-
19
-
-
0041511823
-
The capacitated lot sizing problem: A review of models and algorithms
-
Karimi B., Fatemi Ghomi S.M.T., and Wilson J.M. The capacitated lot sizing problem: A review of models and algorithms. Omega 31 5 (2003) 365-378
-
(2003)
Omega
, vol.31
, Issue.5
, pp. 365-378
-
-
Karimi, B.1
Fatemi Ghomi, S.M.T.2
Wilson, J.M.3
-
20
-
-
0023342273
-
The dynamic lot-sizing problem with startup and reservation costs
-
Karmarkar U.S., Kekre S., and Kekre S. The dynamic lot-sizing problem with startup and reservation costs. Operations Research 35 3 (1987) 389-398
-
(1987)
Operations Research
, vol.35
, Issue.3
, pp. 389-398
-
-
Karmarkar, U.S.1
Kekre, S.2
Kekre, S.3
-
21
-
-
4444383414
-
-
Liu, X., Wang, C., Chu, F., Chu, C., 2004. A forward algorithm for capacitated lot sizing problem with lost sales. In: Proceedings of the 5th World Congress on Intelligent Control and Automation, June 15-19.
-
-
-
-
23
-
-
0001372404
-
Programming of economic lot sizes
-
Manne A.S. Programming of economic lot sizes. Management Science 4 2 (1958) 115-135
-
(1958)
Management Science
, vol.4
, Issue.2
, pp. 115-135
-
-
Manne, A.S.1
-
26
-
-
0035732972
-
Economic production lot sizing with periodic costs and overtime
-
Robinson E.P., and Sahin F. Economic production lot sizing with periodic costs and overtime. Decision Sciences Journal 32 3 (2001) 423-452
-
(2001)
Decision Sciences Journal
, vol.32
, Issue.3
, pp. 423-452
-
-
Robinson, E.P.1
Sahin, F.2
-
27
-
-
0025432875
-
A forward algorithm for the capacitated lot size model with stockouts
-
Sandbothe R.A., and Thompson G.L. A forward algorithm for the capacitated lot size model with stockouts. Operations Research 38 3 (1990) 474-486
-
(1990)
Operations Research
, vol.38
, Issue.3
, pp. 474-486
-
-
Sandbothe, R.A.1
Thompson, G.L.2
-
28
-
-
0025243881
-
Deliberately slowing down output in a family production context
-
Silver E.A. Deliberately slowing down output in a family production context. International Journal of Production Research 28 (1990) 17-27
-
(1990)
International Journal of Production Research
, vol.28
, pp. 17-27
-
-
Silver, E.A.1
-
29
-
-
33748503717
-
Dynamic lot sizing problem for a warm/cold process
-
Toy A.O., and Berk E. Dynamic lot sizing problem for a warm/cold process. IIE Transactions 38 11 (2006) 1027-1044
-
(2006)
IIE Transactions
, vol.38
, Issue.11
, pp. 1027-1044
-
-
Toy, A.O.1
Berk, E.2
-
30
-
-
0001491020
-
3) algorithm for the economic lot-sizing problem with constant capacities
-
3) algorithm for the economic lot-sizing problem with constant capacities. Management Science 42 (1996) 142-150
-
(1996)
Management Science
, vol.42
, pp. 142-150
-
-
Van Hoesel, C.P.1
Wagelmans, A.P.2
-
31
-
-
0001962762
-
Dynamic version of the economic lot size model
-
Wagner H.M., and Whitin T.M. Dynamic version of the economic lot size model. Management Science 5 1 (1958) 89-96
-
(1958)
Management Science
, vol.5
, Issue.1
, pp. 89-96
-
-
Wagner, H.M.1
Whitin, T.M.2
|