메뉴 건너뛰기




Volumn 187, Issue 3, 2008, Pages 1504-1512

Production planning problem with sequence dependent setups as a bilevel programming problem

Author keywords

Bilevel mixed 0 1 integer programming problem; Heuristics based on tabu search; Production; Sequence dependent setup times; Two machines

Indexed keywords

COST EFFECTIVENESS; DATA STORAGE EQUIPMENT; HEURISTIC METHODS; INTEGER PROGRAMMING; TABU SEARCH;

EID: 36849039579     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2006.09.029     Document Type: Article
Times cited : (43)

References (15)
  • 2
    • 0025431821 scopus 로고
    • Computational difficulties of bilevel linear programming
    • Ben-Ayed O., and Blair C.E. Computational difficulties of bilevel linear programming. Technical Notes (1989) 556-560
    • (1989) Technical Notes , pp. 556-560
    • Ben-Ayed, O.1    Blair, C.E.2
  • 3
    • 0020194024 scopus 로고
    • Computational complexity of the capacitated lot size problem
    • Bitran G.R., and Yanasse H.H. Computational complexity of the capacitated lot size problem. Management Science 28 (1982) 1174-1186
    • (1982) Management Science , vol.28 , pp. 1174-1186
    • Bitran, G.R.1    Yanasse, H.H.2
  • 4
    • 25144494884 scopus 로고    scopus 로고
    • Capacitated plant selection in a decentralized manufacturing environment: A bilevel optimization approach
    • Cao D., and Chen M. Capacitated plant selection in a decentralized manufacturing environment: A bilevel optimization approach. European Journal of Operational Research 169 (2006) 97-110
    • (2006) European Journal of Operational Research , vol.169 , pp. 97-110
    • Cao, D.1    Chen, M.2
  • 7
    • 5644274147 scopus 로고    scopus 로고
    • The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
    • Gupta D., and Magnusson T. The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times. Computers and Operations Research 32 (2005) 727-747
    • (2005) Computers and Operations Research , vol.32 , pp. 727-747
    • Gupta, D.1    Magnusson, T.2
  • 8
    • 0346093875 scopus 로고    scopus 로고
    • Using tabu search with ranking candidate list to solve production planning problems with setups
    • Hung Y., Chen C., Shih C., and Hung M. Using tabu search with ranking candidate list to solve production planning problems with setups. Computers and Industrial Engineering 45 (2003) 615-634
    • (2003) Computers and Industrial Engineering , vol.45 , pp. 615-634
    • Hung, Y.1    Chen, C.2    Shih, C.3    Hung, M.4
  • 10
    • 0025488373 scopus 로고
    • The mixed integer linear bilevel programming problem
    • Moore J.T., and Bard J.F. The mixed integer linear bilevel programming problem. Operations research 38 (1990) 911-921
    • (1990) Operations research , vol.38 , pp. 911-921
    • Moore, J.T.1    Bard, J.F.2
  • 11
    • 0023168331 scopus 로고
    • Scheduling parallel processors to minimize setup time
    • Sumichrast R.T. Scheduling parallel processors to minimize setup time. Computers and Operations Research 14 (1987) 305-313
    • (1987) Computers and Operations Research , vol.14 , pp. 305-313
    • Sumichrast, R.T.1
  • 12
    • 0000527046 scopus 로고
    • Bilevel and multilevel programming: A bibliography review
    • Vicente L., and Calamai P. Bilevel and multilevel programming: A bibliography review. Journal of Global Optimization 5 (1994) 291-306
    • (1994) Journal of Global Optimization , vol.5 , pp. 291-306
    • Vicente, L.1    Calamai, P.2
  • 14
    • 0030574652 scopus 로고    scopus 로고
    • A simple Tabu search method to solve the mixed integer linear bilevel program
    • Wen P., and Huang D. A simple Tabu search method to solve the mixed integer linear bilevel program. European Journal of Operational Research 88 (1996) 354-362
    • (1996) European Journal of Operational Research , vol.88 , pp. 354-362
    • Wen, P.1    Huang, D.2
  • 15
    • 0031139978 scopus 로고    scopus 로고
    • MIP modelling of changeovers in production planning and scheduling problems
    • Wolsey L.A. MIP modelling of changeovers in production planning and scheduling problems. European Journal of Operational Research 99 (1997) 154-165
    • (1997) European Journal of Operational Research , vol.99 , pp. 154-165
    • Wolsey, L.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.