-
1
-
-
0032046474
-
Optimum junction point location and inventory levels in serial hybrid push/pull production systems
-
Cochran, J. and Kim, S., Optimum junction point location and inventory levels in serial hybrid push/pull production systems. Int. J. Prod. Res., 1998, 36(4), 1141-1155.
-
(1998)
Int. J. Prod. Res
, vol.36
, Issue.4
, pp. 1141-1155
-
-
Cochran, J.1
Kim, S.2
-
2
-
-
0012306751
-
A modified MRP for production system with the coexistence of MRP and Kanban
-
Ding, F. and Yuen, M., A modified MRP for production system with the coexistence of MRP and Kanban. J. Oper. Manage., 1991, 10(2), 267-277.
-
(1991)
J. Oper. Manage
, vol.10
, Issue.2
, pp. 267-277
-
-
Ding, F.1
Yuen, M.2
-
3
-
-
0026112946
-
Embedding JIT into MRP
-
Flapper, S., Miltenburg, J. and Wijngaard, J., Embedding JIT into MRP. Int. J. Prod. Res., 1991, 29(2), 329-341.
-
(1991)
Int. J. Prod. Res
, vol.29
, Issue.2
, pp. 329-341
-
-
Flapper, S.1
Miltenburg, J.2
Wijngaard, J.3
-
4
-
-
0030173547
-
Performance of a multistage hybrid push/pull production control system
-
Hirakawa, Y., Performance of a multistage hybrid push/pull production control system. Int. J. Prod. Econ., 1996, 44(1-2), 129-135.
-
(1996)
Int. J. Prod. Econ
, vol.44
, Issue.1-2
, pp. 129-135
-
-
Hirakawa, Y.1
-
5
-
-
0035501179
-
An integrated MRP and JIT framework
-
Ho, J. and Chang, Y., An integrated MRP and JIT framework. Comput. Ind. Eng., 2001, 41(2), 173-185.
-
(2001)
Comput. Ind. Eng
, vol.41
, Issue.2
, pp. 173-185
-
-
Ho, J.1
Chang, Y.2
-
6
-
-
0026168681
-
Optimal hybrid push/pull control strategies for a parallel multistage system: Part I
-
Hodgson, T. and Wang, D., Optimal hybrid push/pull control strategies for a parallel multistage system: Part I. Int. J. Prod. Res., 1991a, 29(6), 1279-1287.
-
(1991)
Int. J. Prod. Res
, vol.29
, Issue.6
, pp. 1279-1287
-
-
Hodgson, T.1
Wang, D.2
-
7
-
-
0026187108
-
Optimal hybrid push/pull control strategies for a parallel multistage system: Part II
-
Hodgson, T. and Wang, D., Optimal hybrid push/pull control strategies for a parallel multistage system: Part II. Int. J. Prod. Res., 1991b, 29(7), 1453-1460.
-
(1991)
Int. J. Prod. Res
, vol.29
, Issue.7
, pp. 1453-1460
-
-
Hodgson, T.1
Wang, D.2
-
8
-
-
0036408859
-
Integrated production model in agile manufacturing systems
-
Huang, H., Integrated production model in agile manufacturing systems. Int. J. Adv. Manuf Technol., 2002, 20(7), 515-525.
-
(2002)
Int. J. Adv. Manuf Technol
, vol.20
, Issue.7
, pp. 515-525
-
-
Huang, H.1
-
9
-
-
0027963805
-
Embedding JIT in MRP: The case of job shops
-
Huq, Z. and Huq, F., Embedding JIT in MRP: the case of job shops. J. Manuf Sys., 1994, 13(3), 153-163.
-
(1994)
J. Manuf Sys
, vol.13
, Issue.3
, pp. 153-163
-
-
Huq, Z.1
Huq, F.2
-
10
-
-
3343014111
-
-
Working Paper No. QM8615, Graduate School of Management, University of Rochester, Rochester, NY
-
Karmarker, U., Integrating MRP with Kanban/Pull systems: a hybrid of MRP and JIT. Working Paper No. QM8615, Graduate School of Management, University of Rochester, Rochester, NY, 1986.
-
(1986)
Integrating MRP with Kanban/Pull systems: A hybrid of MRP and JIT
-
-
Karmarker, U.1
-
11
-
-
36248963448
-
-
Ph.D. Dissertation, Department of Industrial and Management Systems Engineering, Arizona State University, Tempe
-
Kaylani, H., Optimal design of hybrid push/pull manufacturing system of general topology using genetic algorithms. Ph.D. Dissertation, Department of Industrial and Management Systems Engineering, Arizona State University, Tempe, 2004.
-
(2004)
Optimal design of hybrid push/pull manufacturing system of general topology using genetic algorithms
-
-
Kaylani, H.1
-
12
-
-
21144468512
-
A recent development of the integrated manufacturing system: A hybrid of MRP and JIT
-
Lee, C., A recent development of the integrated manufacturing system: a hybrid of MRP and JIT. Int. J. Oper. Prod. Manage., 1993, 13(4), 3-17.
-
(1993)
Int. J. Oper. Prod. Manage
, vol.13
, Issue.4
, pp. 3-17
-
-
Lee, C.1
-
13
-
-
0025416434
-
An integrated push-pull manufacturing strategy
-
Olhager, J. and Ostlund, B., An integrated push-pull manufacturing strategy. Eur. J. Oper. Res., 1990, 45(2-3), 135-142.
-
(1990)
Eur. J. Oper. Res
, vol.45
, Issue.2-3
, pp. 135-142
-
-
Olhager, J.1
Ostlund, B.2
-
14
-
-
0030166889
-
Performance modeling of multistage production systems operating under hybrid push/pull control
-
Pandy, P. and Khokhajaikiat, P., Performance modeling of multistage production systems operating under hybrid push/pull control. Int. J. Prod. Econ., 1996, 43(2-3), 17-28.
-
(1996)
Int. J. Prod. Econ
, vol.43
, Issue.2-3
, pp. 17-28
-
-
Pandy, P.1
Khokhajaikiat, P.2
-
15
-
-
0017557653
-
Toyota production system and Kanban system materialization of just-in-time and respect-for-human system
-
Sugimori, Y., Kunsunoki, K., Cho, F. and Uchikawa, S., Toyota production system and Kanban system materialization of just-in-time and respect-for-human system. Int. J. Prod. Res., 1977, 15(6), 553-564.
-
(1977)
Int. J. Prod. Res
, vol.15
, Issue.6
, pp. 553-564
-
-
Sugimori, Y.1
Kunsunoki, K.2
Cho, F.3
Uchikawa, S.4
-
16
-
-
0345253867
-
An investigation of lead-time effects in manufacturing/remanufacturing systems under simple PUSH and PULL control strategies
-
Van der Laan, E., Salomon, M. and Dekker, R., An investigation of lead-time effects in manufacturing/remanufacturing systems under simple PUSH and PULL control strategies. Eur. J. Oper. Res., 1999, 115(1), 195-214.
-
(1999)
Eur. J. Oper. Res
, vol.115
, Issue.1
, pp. 195-214
-
-
Van der Laan, E.1
Salomon, M.2
Dekker, R.3
|