-
1
-
-
13244296714
-
Erfolgsfaktor produktentwicklung: Bericht aus einem industriearbeitskreis (Success factor product development)
-
Brödner P., Paul H., (eds), Muenchen, Mering: Hamp
-
Brödner, P. 1996. “ ‘Erfolgsfaktor produktentwicklung:Bericht aus einem industriearbeitskreis (Success factor product development)’ ”. In Kooperative konstruktion und entwicklung:Nutzungsperspektiven (Cooperative design and development:Perspectives of CAD systems) Edited by:Brödner, P, and Paul, H. 17–38. Muenchen, Mering:Hamp.
-
(1996)
Kooperative konstruktion und entwicklung: Nutzungsperspektiven (Cooperative design and development: Perspectives of CAD systems)
, pp. 17-38
-
-
Brödner, P.1
-
2
-
-
0037332742
-
Development of an integrated information resource base for 4D/VR construction processes simulation
-
Dawood, N, Sriprasert, E, Mallasi, Z, and Hobbs, B. 2002. ‘Development of an integrated information resource base for 4D/VR construction processes simulation’. Automation in Construction, 12:123–131.
-
(2002)
Automation in Construction
, vol.12
, pp. 123-131
-
-
Dawood, N.1
Sriprasert, E.2
Mallasi, Z.3
Hobbs, B.4
-
3
-
-
35448931950
-
Cross-functional teams in a concurrent engineering environment—principles, model and methods
-
Beyerlein M.M., Johnson D.A., Beyerlein S.T., (eds), Oxford: JAI
-
Durst, R, and Kabel, K. 2001. “ ‘Cross-functional teams in a concurrent engineering environment—principles, model and methods’ ”. In Virtual Teams Edited by:Beyerlein, M M, Johnson, D A, and Beyerlein, S T. 167–214. Oxford:JAI.
-
(2001)
Virtual Teams
, pp. 167-214
-
-
Durst, R.1
Kabel, K.2
-
6
-
-
84889492598
-
Integrated and automated project processes in civil engineering: Experiences of the centre for integrated facility engineering at Stanford University
-
Reston, VA: ASCE
-
Kunz, J, Fischer, M, Haymaker, J, and Levitt, R. 2002. “ ‘Integrated and automated project processes in civil engineering:experiences of the centre for integrated facility engineering at Stanford University’ ”. In Computing in Civil Engineering Proceedings, January 2002 96–105. Reston, VA:ASCE.
-
(2002)
Computing in Civil Engineering Proceedings, January 2002
, pp. 96-105
-
-
Kunz, J.1
Fischer, M.2
Haymaker, J.3
Levitt, R.4
-
7
-
-
3242677528
-
Developing a vision of nD-enabled construction
-
Lee, A, Marshall-Ponting, A J, Aouad, G, Wu, S, Koh, I, Fu, C, Cooper, R, Betts, M, Kagioglou, M, and Fischer, M. 2003. “ ‘Developing a vision of nD-enabled construction’ ”. In Construct IT Report, ISBN 1-900491-92-3.
-
(2003)
Construct IT Report
-
-
Lee, A.1
Marshall-Ponting, A.J.2
Aouad, G.3
Wu, S.4
Koh, I.5
Fu, C.6
Cooper, R.7
Betts, M.8
Kagioglou, M.9
Fischer, M.10
-
8
-
-
85024229250
-
-
Rischmoller, L, Fisher, M, Fox, R, and Alarcon, L. 2000. 4D planning and scheduling (4D-PS):Grounding Construction IT Research in Industry Practice, in proceedings of CIB W78 Conference on Construction Information Technology:Taking the construction industry into the 21st century, June, Iceland
-
(2000)
4D planning and scheduling (4D-PS): Grounding Construction IT Research in Industry Practice, in proceedings of CIB W78 Conference on Construction Information Technology: Taking the construction industry into the 21st century, June, Iceland
-
-
Rischmoller, L.1
Fisher, M.2
Fox, R.3
Alarcon, L.4
-
9
-
-
0042639094
-
Concurrent engineering of work and production systems
-
Stahl, J, Luczak, H, Langen, R, Weck, M, Klonaris, P, and Pfeifer, T. 1997. ‘Concurrent engineering of work and production systems’. European Journal of Operations Research, 100:379–398.
-
(1997)
European Journal of Operations Research
, vol.100
, pp. 379-398
-
-
Stahl, J.1
Luczak, H.2
Langen, R.3
Weck, M.4
Klonaris, P.5
Pfeifer, T.6
-
11
-
-
84917314518
-
An IFC web-based collaborative construction computer environment’, invited paper
-
Malaysia: Construction Industry Development Board
-
Alshawi, M, Faraj, I, Aouad, G, Child, T, and Underwood, J. 1999. “ ‘An IFC web-based collaborative construction computer environment’, invited paper ”. In Proceedings of the International Construction IT Conference 8–33. Malaysia:Construction Industry Development Board.
-
(1999)
Proceedings of the International Construction IT Conference
, pp. 8-33
-
-
Alshawi, M.1
Faraj, I.2
Aouad, G.3
Child, T.4
Underwood, J.5
-
12
-
-
0038485692
-
Web-enabled project management: An emerging paradigm in construction
-
Alshawi, M, and Ingirige, B. 2003. ‘Web-enabled project management:an emerging paradigm in construction’. Automation in Construction, 12:349–364.
-
(2003)
Automation in Construction
, vol.12
, pp. 349-364
-
-
Alshawi, M.1
Ingirige, B.2
-
13
-
-
84993093620
-
Automatic generation of data representations for construction application
-
Aouad, G, Sun, M, and Faraj, I. 2002. ‘Automatic generation of data representations for construction application’. Construction Innovation, 2:151–165.
-
(2002)
Construction Innovation
, vol.2
, pp. 151-165
-
-
Aouad, G.1
Sun, M.2
Faraj, I.3
-
14
-
-
84986096648
-
-
Available on-line at
-
Boyd, D. 2001. E-science centre Available on-line at http://www.e-science.clcr.ac.uk
-
(2001)
E-science centre
-
-
Boyd, D.1
-
15
-
-
84986177913
-
Virtual environments for the AEC sector: The divercity experience
-
Portoroz: Slovenia
-
Christiansson, P, Dalto, L, Skjaerbaek, J, Soubra, S, and Marache, M. 2002. “ ‘Virtual environments for the AEC sector:the divercity experience’ ”. In Proceedings of the International ECPPM Conference—eWork and eBusiness in Architecture, Engineering and Construction Portoroz:Slovenia.
-
(2002)
Proceedings of the International ECPPM Conference—eWork and eBusiness in Architecture, Engineering and Construction
-
-
Christiansson, P.1
Dalto, L.2
Skjaerbaek, J.3
Soubra, S.4
Marache, M.5
-
19
-
-
0003998117
-
-
Egan, J. 1998. Rethinking Construction, Report from the Construction Task Force, London, HMSO, Department of the Environment, Transport and Regions.
-
(1998)
Rethinking Construction, Report from the Construction Task Force, London, HMSO, Department of the Environment, Transport and Regions.
-
-
Egan, J.1
-
21
-
-
85024228494
-
Construction planning and management using 3D and 4D CAD models’, in proceedings of the international conference
-
Sydney: Australia
-
Fischer, M. 2000. “ ‘Construction planning and management using 3D and 4D CAD models’, in proceedings of the international conference ”. In Construction IT 2000 Sydney:Australia.
-
(2000)
Construction IT 2000
-
-
Fischer, M.1
-
23
-
-
0004026556
-
-
London: Sage
-
Gibbons, M, Limoges, C, Nowotny, H, Schwartzman, S, Scott, P, and Trow, M., 1994. The New Production of Knowledge London:Sage.
-
(1994)
The New Production of Knowledge
-
-
Gibbons, M.1
Limoges, C.2
Nowotny, H.3
Schwartzman, S.4
Scott, P.5
Trow, M.6
-
24
-
-
84895301986
-
The teaching of the professionals: An interdisciplinary approach
-
Gyamarti, G. 1986. ‘The teaching of the professionals:an interdisciplinary approach’. Higher Education Review, 18 (2):33–43.
-
(1986)
Higher Education Review
, vol.18
, Issue.2
, pp. 33-43
-
-
Gyamarti, G.1
-
25
-
-
18144421977
-
Modeling and implementation of smart AEC objects: An IFC perspective
-
Halfawy, M, and Froese, T. 2002. ‘Modeling and implementation of smart AEC objects:an IFC perspective’. CIB W78 Conference 2002—Distributing Knowledge in Building, Denmark, 2002,:45–52.
-
(2002)
CIB W78 Conference 2002—Distributing Knowledge in Building, Denmark, 2002
, pp. 45-52
-
-
Halfawy, M.1
Froese, T.2
-
26
-
-
0036787205
-
BSPro COM-server—interoperability between software tools using industry foundation classes
-
Karola, A, Lahtela, H, Hanninen, R, Hitchcock, R, Chen, Q, Dajka, S, and Hagstrom, K. 2002. ‘BSPro COM-server—interoperability between software tools using industry foundation classes’. Energy and Building, 34:901–907.
-
(2002)
Energy and Building
, vol.34
, pp. 901-907
-
-
Karola, A.1
Lahtela, H.2
Hanninen, R.3
Hitchcock, R.4
Chen, Q.5
Dajka, S.6
Hagstrom, K.7
-
28
-
-
33846467518
-
Social pyschological aspects of computer-mediated communication
-
Kiesler, S, Siegel, J, and McGuire, T W. 1984. ‘Social pyschological aspects of computer-mediated communication’. American Psychologist, 39:1123–34.
-
(1984)
American Psychologist
, vol.39
, pp. 1123-1134
-
-
Kiesler, S.1
Siegel, J.2
McGuire, T.W.3
-
30
-
-
29144483591
-
Speeding-up the building plan approval—The Singapore e-Plan checking project offers automatic plan checking based on IFC
-
Portoroz: Slovenia
-
Leibich, L, Wix, J, Forester, J, and Qi, Z. 2002. “ ‘Speeding-up the building plan approval—The Singapore e-Plan checking project offers automatic plan checking based on IFC’ ”. In The International Conference of ECPPM 2002—eWork and eBusiness in Architecture, Engineering and Construction Portoroz:Slovenia.
-
(2002)
The International Conference of ECPPM 2002—eWork and eBusiness in Architecture, Engineering and Construction
-
-
Leibich, L.1
Wix, J.2
Forester, J.3
Qi, Z.4
-
31
-
-
84986052840
-
Understanding interdisciplinarity as a paradox in construction professionalism
-
ISBN:1-900491-90-7
-
Leveson, R K. 2003. “ ‘Understanding interdisciplinarity as a paradox in construction professionalism’ ”. In Proceedings of the CIB W78 Conference—Building Education and Research (BEAR), Salford Quays, Salford, UK, 8–11 April 2003 Vol. 2, 828–839. ISBN:1-900491-90-7
-
(2003)
Proceedings of the CIB W78 Conference—Building Education and Research (BEAR)
, vol.2
, pp. 828-839
-
-
Leveson, R.K.1
-
34
-
-
0040955006
-
Trust and inter-organizational networking
-
Newell, S, and Swan, J. 2000. ‘Trust and inter-organizational networking’. Human Relations, 53 (10):1287–1328.
-
(2000)
Human Relations
, vol.53
, Issue.10
, pp. 1287-1328
-
-
Newell, S.1
Swan, J.2
-
37
-
-
84986018085
-
Issues of professionalism in higher education
-
Nicol D., Pilling S., (eds), London: E & FN Spon
-
Watts, C. 2000. “ ‘Issues of professionalism in higher education’ ”. In Changing Architectural Education:Towards a New Professionalism Edited by:Nicol, D, and Pilling, S. London:E & FN Spon.
-
(2000)
Changing Architectural Education: Towards a New Professionalism
-
-
Watts, C.1
-
38
-
-
0033905737
-
A development framework for data models for computer-integrated facilities management
-
Yu, K, Froese, T, and Grobler, F. 2000. ‘A development framework for data models for computer-integrated facilities management’. Automation in Construction, 9:145–167.
-
(2000)
Automation in Construction
, vol.9
, pp. 145-167
-
-
Yu, K.1
Froese, T.2
Grobler, F.3
|