메뉴 건너뛰기




Volumn 17, Issue 3, 1997, Pages 267-290

Concurrent ordering in JIT production systems

Author keywords

Just in time; Kanban; Ordering systems; Production systems

Indexed keywords


EID: 3543107356     PISSN: 01443577     EISSN: None     Source Type: Journal    
DOI: 10.1108/01443579710159905     Document Type: Review
Times cited : (13)

References (28)
  • 1
    • 0017557653 scopus 로고
    • Toyota production system and kanban system: Materialization of just-in-time and respect-for-human system
    • Sugimori, Y., Kusunoki, K., Cho, F. and Uchikawa, S., "Toyota production system and kanban system: materialization of just-in-time and respect-for-human system", International Journal of Production Research, Vol. 15 No. 6, 1977, pp. 553-64.
    • (1977) International Journal of Production Research , vol.15 , Issue.6 , pp. 553-64
    • Sugimori, Y.1    Kusunoki, K.2    Cho, F.3    Uchikawa, S.4
  • 4
    • 84952179325 scopus 로고
    • Design and analysis of pull system: A method of multi-stage production control
    • Kimura, O. and Terada, H., "Design and analysis of pull system: a method of multi-stage production control", International Journal of Production Research, Vol. 19 No. 3, 1981, pp. 241-53.
    • (1981) International Journal of Production Research , vol.19 , Issue.3 , pp. 241-53
    • Kimura, O.1    Terada, H.2
  • 7
    • 0008624969 scopus 로고
    • A review of quantitative approaches in just-in-time manufacturing
    • Joo, S.-H. and Wilhelm, W.E., "A review of quantitative approaches in just-in-time manufacturing", Production Planning & Control, Vol. 3 No. 3, 1993, pp. 207-22.
    • (1993) Production Planning & Control , vol.3 , Issue.3 , pp. 207-22
    • Joo, S.-H.1    Wilhelm, W.E.2
  • 8
    • 0027595182 scopus 로고
    • Minimizing variation of production rates in just-in-time systems: A survey
    • Kubiak, W., "Minimizing variation of production rates in just-in-time systems: a survey", European Journal of Operational Research, Vol. 66 No. 3, 1993, pp. 259-71.
    • (1993) European Journal of Operational Research , vol.66 , Issue.3 , pp. 259-71
    • Kubiak, W.1
  • 9
    • 0028429481 scopus 로고
    • A review of optimization models of kanban-based production systems
    • Price, W., Gravel, M. and Nsakanda, A.L., "A review of optimization models of kanban-based production systems", European Journal of Operational Research, Vol. 75 No. 1, 1994, pp. 1-12.
    • (1994) European Journal of Operational Research , vol.75 , Issue.1 , pp. 1-12
    • Price, W.1    Gravel, M.2    Nsakanda, A.L.3
  • 11
    • 0023167521 scopus 로고
    • Kanban, MRP, and shaping the manufacturing environment
    • Krajewski, L.J., King, B.K., Ritzman, L.P. and Wong, D.S., "kanban, MRP, and shaping the manufacturing environment", Management Science, Vol. 33 No. 1, 1987, pp. 39-57.
    • (1987) Management Science , vol.33 , Issue.1 , pp. 39-57
    • Krajewski, L.J.1    King, B.K.2    Ritzman, L.P.3    Wong, D.S.4
  • 13
    • 0002082384 scopus 로고
    • Integrating kanban type pull systems and MRP type push systems: Insights from a Markovian model
    • Deleersnyder, J.-L., Hodgson, T.J., King, R.E., O'Grady, P.J. and Savva, A., "Integrating kanban type pull systems and MRP type push systems: insights from a Markovian model", IIE Transactions, Vol. 24 No. 3, 1992, pp. 43-56.
    • (1992) IIE Transactions , vol.24 , Issue.3 , pp. 43-56
    • Deleersnyder, J.-L.1    Hodgson, T.J.2    King, R.E.3    O'Grady, P.J.4    Savva, A.5
  • 15
    • 0030166976 scopus 로고    scopus 로고
    • Comparing integration strategies in production ordering systems
    • Takahashi, K. and Soshiroda, M. "Comparing integration strategies in production ordering systems", International Journal of Production Economics, Vol. 44 Nos. 1-2, 1996, pp. 83-9.
    • (1996) International Journal of Production Economics , vol.44 , Issue.1-2 , pp. 83-89
    • Takahashi, K.1    Soshiroda, M.2
  • 16
    • 0027696153 scopus 로고
    • Structural properties and a heuristic for kanban-controlled serial lines
    • Tayur, S.R., "Structural properties and a heuristic for kanban-controlled serial lines", Management Science, Vol. 39 No. 11, 1993, pp. 1347-68.
    • (1993) Management Science , vol.39 , Issue.11 , pp. 1347-68
    • Tayur, S.R.1
  • 18
    • 84989486136 scopus 로고
    • A simulation analysis of the Japanese just-in-time techniques (with kanban) for a multiline, multistage production system
    • Huang, P.Y., Rees, L.P. and Taylor III, B.W., "A simulation analysis of the Japanese just-in-time techniques (with kanban) for a multiline, multistage production system", Decision Sciences, Vol. 14 No. 3, 1983, pp. 326-34.
    • (1983) Decision Sciences , vol.14 , Issue.3 , pp. 326-34
    • Huang, P.Y.1    Rees, L.P.2    Taylor III, B.W.3
  • 19
    • 0024865074 scopus 로고
    • Simulating a just-in-time production system
    • Sarker, B.R., "Simulating a just-in-time production system", Computers & Industrial Engineering, Vol. 16 No. 1, 1989, pp. 127-37.
    • (1989) Computers & Industrial Engineering , vol.16 , Issue.1 , pp. 127-37
    • Sarker, B.R.1
  • 20
    • 0002344815 scopus 로고
    • Simulation modelling and analysis of a JIT production system
    • Chaturvedi, M. and Golhar, D.Y., "Simulation modelling and analysis of a JIT production system", Production Planning & Control, Vol. 3 No. 1, 1992, pp. 81-92.
    • (1992) Production Planning & Control , vol.3 , Issue.1 , pp. 81-92
    • Chaturvedi, M.1    Golhar, D.Y.2
  • 21
    • 0029288838 scopus 로고
    • A comparison of alternative kanban control mechanisms I: Background and structural results
    • Muckstadt, J.A. and Tayur, S.R., "A comparison of alternative kanban control mechanisms I: background and structural results", IIE Transactions, Vol. 27 No. 2, 1995, pp. 140-50.
    • (1995) IIE Transactions , vol.27 , Issue.2 , pp. 140-50
    • Muckstadt, J.A.1    Tayur, S.R.2
  • 22
    • 0029288358 scopus 로고
    • A comparison of alternative kanban control mechanisms II: Experimental results
    • Muckstadt, J.A. and Tayur, S.R., "A comparison of alternative kanban control mechanisms II: experimental results", IIE Transactions, Vol. 27 No. 2, 1995, pp. 151-61.
    • (1995) IIE Transactions , vol.27 , Issue.2 , pp. 151-61
    • Muckstadt, J.A.1    Tayur, S.R.2
  • 23
    • 0009392046 scopus 로고
    • Analysis and approximation of a JIT production line: A comment
    • Berkley, B.J., "Analysis and approximation of a JIT production line: a comment", Decision Sciences, Vol. 21 No. 3, 1990, pp. 660-9.
    • (1990) Decision Sciences , vol.21 , Issue.3 , pp. 660-9
    • Berkley, B.J.1
  • 24
    • 0023330726 scopus 로고
    • A mathematical programming approach to a deterministic kanban system
    • Bitran, G.R. and Chang, L., "A mathematical programming approach to a deterministic kanban system", Management Science, Vol. 33 No. 4, 1987, pp. 427-41.
    • (1987) Management Science , vol.33 , Issue.4 , pp. 427-41
    • Bitran, G.R.1    Chang, L.2
  • 25
    • 33746011471 scopus 로고
    • Determining the number of kanbans and lot sizes in a generic kanban system: A simulated annealing approach
    • Chang, T.-M. and Yih, Y., "Determining the number of kanbans and lot sizes in a generic kanban system: a simulated annealing approach", International Journal of Production Research, Vol. 32 No. 8, 1994, pp. 1991-2004.
    • (1994) International Journal of Production Research , vol.32 , Issue.8 , pp. 1991-2004
    • Chang, T.-M.1    Yih, Y.2
  • 26
    • 0000172494 scopus 로고
    • Algorithms for scheduling multi-level just-in-time production systems
    • Miltenburg, J. and Shinnamon, G., "Algorithms for scheduling multi-level just-in-time production systems", IIE Transactions, Vol. 24 No. 2, 1992, pp. 121-30.
    • (1992) IIE Transactions , vol.24 , Issue.2 , pp. 121-30
    • Miltenburg, J.1    Shinnamon, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.