-
1
-
-
0017557653
-
Toyota production system and kanban system: Materialization of just-in-time and respect-for-human system
-
Sugimori, Y., Kusunoki, K., Cho, F. and Uchikawa, S., "Toyota production system and kanban system: materialization of just-in-time and respect-for-human system", International Journal of Production Research, Vol. 15 No. 6, 1977, pp. 553-64.
-
(1977)
International Journal of Production Research
, vol.15
, Issue.6
, pp. 553-64
-
-
Sugimori, Y.1
Kusunoki, K.2
Cho, F.3
Uchikawa, S.4
-
4
-
-
84952179325
-
Design and analysis of pull system: A method of multi-stage production control
-
Kimura, O. and Terada, H., "Design and analysis of pull system: a method of multi-stage production control", International Journal of Production Research, Vol. 19 No. 3, 1981, pp. 241-53.
-
(1981)
International Journal of Production Research
, vol.19
, Issue.3
, pp. 241-53
-
-
Kimura, O.1
Terada, H.2
-
5
-
-
0002256871
-
A review of literature relating to JIT
-
Sohal, A.S., Keller, A.Z. and Fouad, R.H., "A review of literature relating to JIT", International Journal of Operations and Production Management, Vol. 9 No. 3, 1988, pp. 15-25.
-
(1988)
International Journal of Operations and Production Management
, vol.9
, Issue.3
, pp. 15-25
-
-
Sohal, A.S.1
Keller, A.Z.2
Fouad, R.H.3
-
6
-
-
0026137976
-
The just-in-time philosophy: A literature review
-
Golhar, D.Y. and Stamm, C.L., "The just-in-time philosophy: a literature review", International Journal of Production Research, Vol. 29 No. 4, 1991, pp. 657-76.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.4
, pp. 657-76
-
-
Golhar, D.Y.1
Stamm, C.L.2
-
7
-
-
0008624969
-
A review of quantitative approaches in just-in-time manufacturing
-
Joo, S.-H. and Wilhelm, W.E., "A review of quantitative approaches in just-in-time manufacturing", Production Planning & Control, Vol. 3 No. 3, 1993, pp. 207-22.
-
(1993)
Production Planning & Control
, vol.3
, Issue.3
, pp. 207-22
-
-
Joo, S.-H.1
Wilhelm, W.E.2
-
8
-
-
0027595182
-
Minimizing variation of production rates in just-in-time systems: A survey
-
Kubiak, W., "Minimizing variation of production rates in just-in-time systems: a survey", European Journal of Operational Research, Vol. 66 No. 3, 1993, pp. 259-71.
-
(1993)
European Journal of Operational Research
, vol.66
, Issue.3
, pp. 259-71
-
-
Kubiak, W.1
-
9
-
-
0028429481
-
A review of optimization models of kanban-based production systems
-
Price, W., Gravel, M. and Nsakanda, A.L., "A review of optimization models of kanban-based production systems", European Journal of Operational Research, Vol. 75 No. 1, 1994, pp. 1-12.
-
(1994)
European Journal of Operational Research
, vol.75
, Issue.1
, pp. 1-12
-
-
Price, W.1
Gravel, M.2
Nsakanda, A.L.3
-
11
-
-
0023167521
-
Kanban, MRP, and shaping the manufacturing environment
-
Krajewski, L.J., King, B.K., Ritzman, L.P. and Wong, D.S., "kanban, MRP, and shaping the manufacturing environment", Management Science, Vol. 33 No. 1, 1987, pp. 39-57.
-
(1987)
Management Science
, vol.33
, Issue.1
, pp. 39-57
-
-
Krajewski, L.J.1
King, B.K.2
Ritzman, L.P.3
Wong, D.S.4
-
12
-
-
0028463293
-
The flexibility of production ordering systems
-
Takahashi, K., Hiraki, S. and Soshiroda, M., "The flexibility of production ordering systems", International Journal of Production Research, Vol. 32 No. 7, 1994, pp. 1739-52.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.7
, pp. 1739-52
-
-
Takahashi, K.1
Hiraki, S.2
Soshiroda, M.3
-
13
-
-
0002082384
-
Integrating kanban type pull systems and MRP type push systems: Insights from a Markovian model
-
Deleersnyder, J.-L., Hodgson, T.J., King, R.E., O'Grady, P.J. and Savva, A., "Integrating kanban type pull systems and MRP type push systems: insights from a Markovian model", IIE Transactions, Vol. 24 No. 3, 1992, pp. 43-56.
-
(1992)
IIE Transactions
, vol.24
, Issue.3
, pp. 43-56
-
-
Deleersnyder, J.-L.1
Hodgson, T.J.2
King, R.E.3
O'Grady, P.J.4
Savva, A.5
-
14
-
-
0028317753
-
Pull-push integration in production ordering systems
-
Takahashi, K., Hiraki, S., and Soshiroda, M. "Pull-push integration in production ordering systems", International Journal of Production Economics, Vol. 33 Nos. 1-4, 1994, pp. 155-61.
-
(1994)
International Journal of Production Economics
, vol.33
-
-
Takahashi, K.1
Hiraki, S.2
Soshiroda, M.3
-
15
-
-
0030166976
-
Comparing integration strategies in production ordering systems
-
Takahashi, K. and Soshiroda, M. "Comparing integration strategies in production ordering systems", International Journal of Production Economics, Vol. 44 Nos. 1-2, 1996, pp. 83-9.
-
(1996)
International Journal of Production Economics
, vol.44
, Issue.1-2
, pp. 83-89
-
-
Takahashi, K.1
Soshiroda, M.2
-
16
-
-
0027696153
-
Structural properties and a heuristic for kanban-controlled serial lines
-
Tayur, S.R., "Structural properties and a heuristic for kanban-controlled serial lines", Management Science, Vol. 39 No. 11, 1993, pp. 1347-68.
-
(1993)
Management Science
, vol.39
, Issue.11
, pp. 1347-68
-
-
Tayur, S.R.1
-
17
-
-
0004023295
-
-
Prentice-Hall Englewood Cliffs, NJ
-
Buzacott, J.A. and Shantikumar, J.G., Stochastic Models of Manufacturing Systems, Prentice-Hall, Englewood Cliffs, NJ, 1993.
-
(1993)
Stochastic Models of Manufacturing Systems
-
-
Buzacott, J.A.1
Shantikumar, J.G.2
-
18
-
-
84989486136
-
A simulation analysis of the Japanese just-in-time techniques (with kanban) for a multiline, multistage production system
-
Huang, P.Y., Rees, L.P. and Taylor III, B.W., "A simulation analysis of the Japanese just-in-time techniques (with kanban) for a multiline, multistage production system", Decision Sciences, Vol. 14 No. 3, 1983, pp. 326-34.
-
(1983)
Decision Sciences
, vol.14
, Issue.3
, pp. 326-34
-
-
Huang, P.Y.1
Rees, L.P.2
Taylor III, B.W.3
-
19
-
-
0024865074
-
Simulating a just-in-time production system
-
Sarker, B.R., "Simulating a just-in-time production system", Computers & Industrial Engineering, Vol. 16 No. 1, 1989, pp. 127-37.
-
(1989)
Computers & Industrial Engineering
, vol.16
, Issue.1
, pp. 127-37
-
-
Sarker, B.R.1
-
20
-
-
0002344815
-
Simulation modelling and analysis of a JIT production system
-
Chaturvedi, M. and Golhar, D.Y., "Simulation modelling and analysis of a JIT production system", Production Planning & Control, Vol. 3 No. 1, 1992, pp. 81-92.
-
(1992)
Production Planning & Control
, vol.3
, Issue.1
, pp. 81-92
-
-
Chaturvedi, M.1
Golhar, D.Y.2
-
21
-
-
0029288838
-
A comparison of alternative kanban control mechanisms I: Background and structural results
-
Muckstadt, J.A. and Tayur, S.R., "A comparison of alternative kanban control mechanisms I: background and structural results", IIE Transactions, Vol. 27 No. 2, 1995, pp. 140-50.
-
(1995)
IIE Transactions
, vol.27
, Issue.2
, pp. 140-50
-
-
Muckstadt, J.A.1
Tayur, S.R.2
-
22
-
-
0029288358
-
A comparison of alternative kanban control mechanisms II: Experimental results
-
Muckstadt, J.A. and Tayur, S.R., "A comparison of alternative kanban control mechanisms II: experimental results", IIE Transactions, Vol. 27 No. 2, 1995, pp. 151-61.
-
(1995)
IIE Transactions
, vol.27
, Issue.2
, pp. 151-61
-
-
Muckstadt, J.A.1
Tayur, S.R.2
-
23
-
-
0009392046
-
Analysis and approximation of a JIT production line: A comment
-
Berkley, B.J., "Analysis and approximation of a JIT production line: a comment", Decision Sciences, Vol. 21 No. 3, 1990, pp. 660-9.
-
(1990)
Decision Sciences
, vol.21
, Issue.3
, pp. 660-9
-
-
Berkley, B.J.1
-
24
-
-
0023330726
-
A mathematical programming approach to a deterministic kanban system
-
Bitran, G.R. and Chang, L., "A mathematical programming approach to a deterministic kanban system", Management Science, Vol. 33 No. 4, 1987, pp. 427-41.
-
(1987)
Management Science
, vol.33
, Issue.4
, pp. 427-41
-
-
Bitran, G.R.1
Chang, L.2
-
25
-
-
33746011471
-
Determining the number of kanbans and lot sizes in a generic kanban system: A simulated annealing approach
-
Chang, T.-M. and Yih, Y., "Determining the number of kanbans and lot sizes in a generic kanban system: a simulated annealing approach", International Journal of Production Research, Vol. 32 No. 8, 1994, pp. 1991-2004.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.8
, pp. 1991-2004
-
-
Chang, T.-M.1
Yih, Y.2
-
26
-
-
0000172494
-
Algorithms for scheduling multi-level just-in-time production systems
-
Miltenburg, J. and Shinnamon, G., "Algorithms for scheduling multi-level just-in-time production systems", IIE Transactions, Vol. 24 No. 2, 1992, pp. 121-30.
-
(1992)
IIE Transactions
, vol.24
, Issue.2
, pp. 121-30
-
-
Miltenburg, J.1
Shinnamon, G.2
-
28
-
-
0026746786
-
Describing processing time when simulating JIT environments
-
Muralidhar, K., Swanseth, S.R. and Wilson, R.L., "Describing processing time when simulating JIT environments", International Journal of Production Research, Vol. 30 No. 1, 1992, pp. 1-11.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.1
, pp. 1-11
-
-
Muralidhar, K.1
Swanseth, S.R.2
Wilson, R.L.3
|