-
1
-
-
35348893652
-
-
ACI Innovation Task Grou1. (Acceptance criteria for moment frames based on structural testing (T1.1-01) and commentary (T1.1R-01), American Concrete Institute, Farmington Hills, Mich.
-
ACI Innovation Task Group 1. (2001a). Acceptance criteria for moment frames based on structural testing (T1.1-01) and commentary (T1.1R-01), American Concrete Institute, Farmington Hills, Mich,.
-
(2001)
-
-
-
2
-
-
0035470510
-
Special hybrid moment frames composed of discretely jointed precast and posttensioned concrete members (ACI T1.2-XX) and commentary (T1.2R-XX)
-
ACI Innovation Task Grou1.
-
ACI Innovation Task Group 1. (2001b). " Special hybrid moment frames composed of discretely jointed precast and posttensioned concrete members (ACI T1.2-XX) and commentary (T1.2R-XX).. " ACI Struct. J., 98 (5), 771-784.
-
(2001)
ACI Struct. J.
, vol.98
, Issue.5
, pp. 771-784
-
-
-
3
-
-
0002020260
-
Model precast concrete beam-to-column joints subject to cyclic loading
-
Cheok, G., and Lew, H. (1993). " Model precast concrete beam-to-column joints subject to cyclic loading.. " PCI J., 38 (4), 80-92.
-
(1993)
PCI J.
, vol.38
, Issue.4
, pp. 80-92
-
-
Cheok, G.1
Lew, H.2
-
4
-
-
0003206816
-
Post tensioned energy dissipating connections for moment-resisting steel frames
-
Christopoulos, C., Filiatrault, A., Uang, C.-M., and Folz, B. (2002). " Post tensioned energy dissipating connections for moment-resisting steel frames.. " J. Struct. Eng., 128 (9), 1111-1120.
-
(2002)
J. Struct. Eng.
, vol.128
, Issue.9
, pp. 1111-1120
-
-
Christopoulos, C.1
Filiatrault, A.2
Uang, C.-M.3
Folz, B.4
-
5
-
-
0032650744
-
Seismic behavior and design of unbonded posttensioned precast concrete frames
-
El-Sheikh, M., Sause, R., Pessiki, S., and Lu, L. W. (1999). " Seismic behavior and design of unbonded posttensioned precast concrete frames.. " PCI J., 44 (3), 54-71.
-
(1999)
PCI J.
, vol.44
, Issue.3
, pp. 54-71
-
-
El-Sheikh, M.1
Sause, R.2
Pessiki, S.3
Lu, L.W.4
-
6
-
-
0036630935
-
Design-construction of the Paramount-A 39-story precast prestressed concrete apartment building
-
Englekirk, R. (2002). " Design-construction of the Paramount-A 39-story precast prestressed concrete apartment building.. " PCI J., 47 (4), 56-71.
-
(2002)
PCI J.
, vol.47
, Issue.4
, pp. 56-71
-
-
Englekirk, R.1
-
7
-
-
14544271978
-
Experimental studies of full-scale posttensioned steel connections
-
Garlock, M. M., Ricles, J. M., and Sause, R. (2005). " Experimental studies of full-scale posttensioned steel connections.. " J. Struct. Eng., 131 (3), 438-448.
-
(2005)
J. Struct. Eng.
, vol.131
, Issue.3
, pp. 438-448
-
-
Garlock, M.M.1
Ricles, J.M.2
Sause, R.3
-
8
-
-
0001063296
-
Slotted bolted connection energy dissipators
-
Grigorian, C., Yang, T., and Popov, E. (1993). " Slotted bolted connection energy dissipators.. " Earthquake Spectra, 9 (3), 491-504.
-
(1993)
Earthquake Spectra
, vol.9
, Issue.3
, pp. 491-504
-
-
Grigorian, C.1
Yang, T.2
Popov, E.3
-
9
-
-
35348904859
-
-
International Code Council (ICC).
-
International Code Council (ICC). (2006). International building code 2006, Falls Church, Va.
-
(2006)
International Building Code 2006
-
-
-
10
-
-
33745323619
-
Experimental evaluation of posttensioned hybrid coupled wall subassemblages
-
Kurama, Y. C., Weldon, B. O., and Shen, Q. (2006). " Experimental evaluation of posttensioned hybrid coupled wall subassemblages.. " J. Struct. Eng., 132 (7), 1017-1029.
-
(2006)
J. Struct. Eng.
, vol.132
, Issue.7
, pp. 1017-1029
-
-
Kurama, Y.C.1
Weldon, B.O.2
Shen, Q.3
-
11
-
-
35348821706
-
A friction damper for posttensioned precast concrete beam-to-column joints
-
Vancouver, BC, Canada.
-
Morgen, B., and Kurama, Y. (2004a). " A friction damper for posttensioned precast concrete beam-to-column joints.. " Proc., 13th World Conf. on Earthquake Engineering (CD-ROM), Vancouver, BC, Canada,.
-
(2004)
Proc., 13th World Conf. on Earthquake Engineering
-
-
Morgen, B.1
Kurama, Y.2
-
12
-
-
4544288018
-
A friction damper for posttensioned precast concrete moment frames
-
Morgen, B., and Kurama, Y. (2004b). " A friction damper for posttensioned precast concrete moment frames.. " PCI J., 49 (4), 112-133.
-
(2004)
PCI J.
, vol.49
, Issue.4
, pp. 112-133
-
-
Morgen, B.1
Kurama, Y.2
-
13
-
-
35348866014
-
-
Univ. of Notre Dame, Notre Dame, Ind.
-
Morgen, B., and Kurama, Y. (2007). " Friction-damped unbonded posttensioned precast concrete moment frame structures for seismic regions.. " Structural Engineering Research Rep. NDSE-07-01, Dept. of Civil Engineering and Geological Sciences, Univ. of Notre Dame, Notre Dame, Ind.
-
(2007)
Friction-damped Unbonded Posttensioned Precast Concrete Moment Frame Structures for Seismic Regions
-
-
Morgen, B.1
Kurama, Y.2
-
14
-
-
0003514892
-
-
UCB/SEMM-93/17, Dept. of Civil and Environmental Engineering, Univ. of California, Berkeley, Calif.
-
Prakash, V., Powell, G., and Campbell, S. (1993). " DRAIN-2DX base program description and user guide; Version 1.10.. " Rep. No. UCB/SEMM-93/17, Dept. of Civil and Environmental Engineering, Univ. of California, Berkeley, Calif.
-
(1993)
DRAIN-2DX Base Program Description and User Guide; Version 1.10
-
-
Prakash, V.1
Powell, G.2
Campbell, S.3
-
15
-
-
0029752378
-
Seismic tests of precast beam-to-column joint subassemblages with unbonded tendons
-
Priestley, M., and MacRae, G. (1996). " Seismic tests of precast beam-to-column joint subassemblages with unbonded tendons.. " PCI J., 41 (1), 64-81.
-
(1996)
PCI J.
, vol.41
, Issue.1
, pp. 64-81
-
-
Priestley, M.1
MacRae, G.2
-
16
-
-
0033308402
-
Preliminary results and conclusions from the PRESSS five-story precast concrete test building
-
Priestley, M., Sritharan, S., Conley, J., and Pampanin, S. (1999). " Preliminary results and conclusions from the PRESSS five-story precast concrete test building., " PCI J., 44 (6), 42-67.
-
(1999)
PCI J.
, vol.44
, Issue.6
, pp. 42-67
-
-
Priestley, M.1
Sritharan, S.2
Conley, J.3
Pampanin, S.4
-
17
-
-
0002922616
-
Seismic response of precast prestressed concrete frames with partially debonded tendons
-
Priestley, M., and Tao, J. (1993). " Seismic response of precast prestressed concrete frames with partially debonded tendons.. " PCI J., 38 (1), 58-67.
-
(1993)
PCI J.
, vol.38
, Issue.1
, pp. 58-67
-
-
Priestley, M.1
Tao, J.2
-
18
-
-
0000514076
-
Performance of hybrid moment-resisting precast beam-column concrete connections subjected to cyclic loading
-
Stone, W., Cheok, G., and Stanton, J. (1995). " Performance of hybrid moment-resisting precast beam-column concrete connections subjected to cyclic loading.. " ACI Struct. J., 92 (2), 229-249.
-
(1995)
ACI Struct. J.
, vol.92
, Issue.2
, pp. 229-249
-
-
Stone, W.1
Cheok, G.2
Stanton, J.3
-
19
-
-
4544349195
-
Friction-damped moment resisting frames
-
Way, D. (1996). " Friction-damped moment resisting frames.. " Earthquake Spectra, 12 (3), 623-633.
-
(1996)
Earthquake Spectra
, vol.12
, Issue.3
, pp. 623-633
-
-
Way, D.1
-
20
-
-
35348830255
-
Unbonded posttensioned precast concrete coupling beams: An experimental evaluation
-
Long Beach, Calif.
-
Weldon, B., and Kurama, Y. (2007). " Unbonded posttensioned precast concrete coupling beams: An experimental evaluation.. " Proc., ASCE Structures Congress, Long Beach, Calif.
-
(2007)
Proc., ASCE Structures Congress
-
-
Weldon, B.1
Kurama, Y.2
|