-
2
-
-
0018032040
-
Integer programming approach to the problem of optimal unit commitment with probabilistic reserve determination
-
T. S. Dillon, K. W. Edwin, H. D. Kochs, and R. J. Taud, "Integer programming approach to the problem of optimal unit commitment with probabilistic reserve determination," IEEE Trans. Power Apparatus and Systems, vol. PAS-97, pp. 2154-2166, 1978.
-
(1978)
IEEE Trans. Power Apparatus and Systems
, vol.PAS-97
, pp. 2154-2166
-
-
Dillon, T.S.1
Edwin, K.W.2
Kochs, H.D.3
Taud, R.J.4
-
3
-
-
0024054074
-
An enhanced adaptive dynamic programming approach for unit commitment
-
Aug
-
W. J. Hobbs, G. Hermon, S. Warner, and G. B. Shable, "An enhanced adaptive dynamic programming approach for unit commitment," IEEE Trans. Power Systems, vol. 3, no. 3, pp. 1201-1205, Aug. 1988.
-
(1988)
IEEE Trans. Power Systems
, vol.3
, Issue.3
, pp. 1201-1205
-
-
Hobbs, W.J.1
Hermon, G.2
Warner, S.3
Shable, G.B.4
-
4
-
-
0028480021
-
Ramp rate limits in unit commitment and economic dispatch incorporating rotor fatigue effect
-
Aug
-
C. Wang and S. M. Shahidehpour, "Ramp rate limits in unit commitment and economic dispatch incorporating rotor fatigue effect," IEEE Trans. Power Systems, vol. 9, no. 3, pp. 1539-1545, Aug. 1994.
-
(1994)
IEEE Trans. Power Systems
, vol.9
, Issue.3
, pp. 1539-1545
-
-
Wang, C.1
Shahidehpour, S.M.2
-
5
-
-
0031076834
-
Short-term resource scheduling with ramp rate constraints
-
Feb
-
A. J. Svoboda, C.-L. Tseng, C. A. Li, and R. B. Johnson, "Short-term resource scheduling with ramp rate constraints," IEEE Trans. Power Systems, vol. 12, no. 1, pp. 77-83, Feb. 1997.
-
(1997)
IEEE Trans. Power Systems
, vol.12
, Issue.1
, pp. 77-83
-
-
Svoboda, A.J.1
Tseng, C.-L.2
Li, C.A.3
Johnson, R.B.4
-
6
-
-
0033079910
-
Unit commitment with ramp multipliers
-
Feb
-
S. Y. Lai and R. Baldick, "Unit commitment with ramp multipliers," IEEE Trans. Power Systems, vol. 14, no. 1, pp. 58-64, Feb. 1999.
-
(1999)
IEEE Trans. Power Systems
, vol.14
, Issue.1
, pp. 58-64
-
-
Lai, S.Y.1
Baldick, R.2
-
7
-
-
0030087186
-
A practical resource scheduling with OPF constraints
-
Feb
-
K. H. Abdul-Rahman, S. M. Shahidehpour, M. Aganaic, and S. Mokhtari, "A practical resource scheduling with OPF constraints," IEEE Trans. Power Systems, vol. 11, no. 1, pp. 254-259, Feb. 1996.
-
(1996)
IEEE Trans. Power Systems
, vol.11
, Issue.1
, pp. 254-259
-
-
Abdul-Rahman, K.H.1
Shahidehpour, S.M.2
Aganaic, M.3
Mokhtari, S.4
-
8
-
-
0029356616
-
Short-term generation scheduling with transmission and environmental constraints using augmented Lagrangian relaxation
-
Aug
-
S. J. Wang, S. M. Shahidehpour, D. S. Kirschen, S. Mokhtari, and G. D. Irisaari, "Short-term generation scheduling with transmission and environmental constraints using augmented Lagrangian relaxation," IEEE Trans. Power Systems, vol. 10, no. 3, pp. 1294-1301, Aug. 1995.
-
(1995)
IEEE Trans. Power Systems
, vol.10
, Issue.3
, pp. 1294-1301
-
-
Wang, S.J.1
Shahidehpour, S.M.2
Kirschen, D.S.3
Mokhtari, S.4
Irisaari, G.D.5
-
9
-
-
0032640594
-
Unit commitment with transmission security and voltage constraints
-
May
-
H. Ma and S. M. Shahidehpour, "Unit commitment with transmission security and voltage constraints," IEEE Trans. Power Systems, vol. 14, no. 2, pp. 757-764, May 1999.
-
(1999)
IEEE Trans. Power Systems
, vol.14
, Issue.2
, pp. 757-764
-
-
Ma, H.1
Shahidehpour, S.M.2
-
11
-
-
0032138094
-
A new thermal unit commitment approach using constraint logic programming
-
Aug
-
K.-Y. Huang, H.-T. Yang, and C.-L. Huang, "A new thermal unit commitment approach using constraint logic programming", IEEE Trans. Power Systems, vol. 13, no. 3, pp. 936-945, Aug. 1998.
-
(1998)
IEEE Trans. Power Systems
, vol.13
, Issue.3
, pp. 936-945
-
-
Huang, K.-Y.1
Yang, H.-T.2
Huang, C.-L.3
-
13
-
-
0027647348
-
Effects of ramp rate limits on unit commitment and economic dispatch
-
Aug
-
C. Wang and S. M. Shahidehpour, "Effects of ramp rate limits on unit commitment and economic dispatch," IEEE Trans. Power Systems, vol. 8, no. 3, pp. 1341-1350, Aug. 1993.
-
(1993)
IEEE Trans. Power Systems
, vol.8
, Issue.3
, pp. 1341-1350
-
-
Wang, C.1
Shahidehpour, S.M.2
-
14
-
-
5144228382
-
A fuzzy optimization-based approach to large scale thermal unit commitment
-
M. M. El-Saadawi, M. A. Tantawi, and E. Tawfik, "A fuzzy optimization-based approach to large scale thermal unit commitment," Electric Power Systems Research 72 (2004) 245-252.
-
(2004)
Electric Power Systems Research
, vol.72
, pp. 245-252
-
-
El-Saadawi, M.M.1
Tantawi, M.A.2
Tawfik, E.3
-
15
-
-
0036872194
-
A parallel repair genetic algorithm to solve the unit commitment problem
-
Nov
-
J. M. Arroyo and A. J. Conejo, "A parallel repair genetic algorithm to solve the unit commitment problem", IEEE Trans. Power Systems, vol. 17, no. 4, pp. 1216-1224, Nov. 2002.
-
(2002)
IEEE Trans. Power Systems
, vol.17
, Issue.4
, pp. 1216-1224
-
-
Arroyo, J.M.1
Conejo, A.J.2
-
17
-
-
0018544097
-
IEEE Reliability Test System
-
IEEE Reliability Test System Task Force, Nov./Dec
-
IEEE Reliability Test System Task Force, "IEEE Reliability Test System," IEEE Trans. Power Systems, vol. PAS-98, no. 6, pp. 2047-2054, Nov./Dec. 1979.
-
(1979)
IEEE Trans. Power Systems
, vol.PAS-98
, Issue.6
, pp. 2047-2054
-
-
-
18
-
-
0032592961
-
The IEEE Reliability Test System - 1996
-
IEEE Reliability Test System Task Force, Aug
-
IEEE Reliability Test System Task Force, "The IEEE Reliability Test System - 1996," IEEE Trans. Power Systems, vol. 14, no. 3, pp. 1010-1020, Aug. 1999.
-
(1999)
IEEE Trans. Power Systems
, vol.14
, Issue.3
, pp. 1010-1020
-
-
|