IED modelling for IEC61850 based substation automation system performance simulation

Author keywords

Generic models; IEC 61850; Intelligent Electronic Device (IED); OPNET moeller; Substation Automation System (SAS)

Indexed keywords

COMPUTER SIMULATION; ELECTRIC NETWORK TOPOLOGY; MATHEMATICAL MODELS; STANDARDS;

EID: 35348849163     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/pes.2006.1708970     Document Type: Conference Paper
Times cited : (34)

References (6)
  • 1
    • 35348872897 scopus 로고    scopus 로고
    • IEC 61850-5 Communication requirements for functions and device models 2003. First Edition pp. 43-48.
    • IEC 61850-5 Communication requirements for functions and device models 2003. First Edition pp. 43-48.
  • 2
    • 35348818330 scopus 로고    scopus 로고
    • Wolfgang Wimmer Substation Automation Handbook
    • Lohmann, pp
    • Klaus-Peter Brand. Volker Lohmann. Wolfgang Wimmer Substation Automation Handbook, 2003 Utility Automation Consulting Lohmann, pp. 152-182.
    • (2003) Utility Automation Consulting , pp. 152-182
    • Brand, K.1    Lohmann, V.2
  • 3
    • 84870780322 scopus 로고    scopus 로고
    • OPNET Modeler- OPNET Technologies, Available at
    • OPNET Modeler- OPNET Technologies. Information Available at http://www.opnet.com.
    • Information
  • 6
    • 35348886459 scopus 로고    scopus 로고
    • F. Engler, T.L. Kern, etc, IEC 61850 based digital communication as interface to the primary equipment, CIGRE 2004, paper B3-205.