-
1
-
-
0003397253
-
-
Office of the Under Secretary of Defense (OUSD), Washington, DC - 20301-3000, August 1998.
-
OUSD, 1998, "DoD Integrated Product and Process Development Handbook", Office of the Under Secretary of Defense (OUSD), Washington, DC - 20301-3000, August 1998.
-
(1998)
DoD Integrated Product and Process Development Handbook
-
-
-
2
-
-
0142029449
-
STEP-based product modeling system for remote collaborative reverse engineering
-
Lee, R. S., Tsaib, J. P., Kaoc, Lind, C. I. and Fane, K. C., 2003, "STEP-based product modeling system for remote collaborative reverse engineering", Robotics and Computer-Integrated Manufacturing, Volume 19, Issue 6, Pages 543-553.
-
(2003)
Robotics and Computer-Integrated Manufacturing
, vol.19
, Issue.6
, pp. 543-553
-
-
Lee, R.S.1
Tsaib, J.P.2
Kaoc3
Lind, C.I.4
Fane, K.C.5
-
3
-
-
35048838682
-
Developing distributed applications for integrated product and process design
-
Article in Press
-
Mervyn, F., Senthil Kumar, A., Bok, S. and Nee, A. Y. C, 2003, "Developing distributed applications for integrated product and process design", Computer Aided Design, Article in Press.
-
(2003)
Computer Aided Design
-
-
Mervyn, F.1
Senthil Kumar, A.2
Bok, S.3
Nee, A.Y.C.4
-
4
-
-
0037862092
-
A life cycle engineering approach to development of flexible manufacturing systems
-
June 2003
-
Yan, P. and Zhou, M, 2003, "A life cycle engineering approach to development of flexible manufacturing systems", IEEE Transactions on Robotics and Automation, Volume 19, Issue 3, June 2003, Pages 465-473.
-
(2003)
IEEE Transactions on Robotics and Automation
, vol.19
, Issue.3
, pp. 465-473
-
-
Yan, P.1
Zhou, M.2
-
5
-
-
0036993092
-
Collaborative model for concurrent product design
-
12-14 July 2001
-
Song, P., Tang, M. and Dong J. 2001, "Collaborative model for concurrent product design", IEEE Sixth International Conference on Computer Supported Cooperative Work in Design, 12-14 July 2001, Pages 212-217.
-
(2001)
IEEE Sixth International Conference on Computer Supported Cooperative Work in Design
, pp. 212-217
-
-
Song, P.1
Tang, M.2
Dong, J.3
-
6
-
-
0030142989
-
Customizing Concurrent Engineering Processes: Five Case Studies
-
Swink, M., Sandving, J.C. and Mabert, V., 1996, "Customizing Concurrent Engineering Processes: Five Case Studies", Journal of Production and Innovation Management, Volume 13, Pages 229-244.
-
(1996)
Journal of Production and Innovation Management
, vol.13
, pp. 229-244
-
-
Swink, M.1
Sandving, J.C.2
Mabert, V.3
-
7
-
-
33646029637
-
-
Master Thesis in Manufacturing Systems, ITESM, Campus Monterrey
-
Aca, J., 2004, "Reference Model and Methodology to Configure/Reconfigure Integrated Product, Process and Facility Development Processes", Master Thesis in Manufacturing Systems, ITESM, Campus Monterrey.
-
(2004)
Reference Model and Methodology to Configure/Reconfigure Integrated Product, Process and Facility Development Processes
-
-
Aca, J.1
-
9
-
-
0003671295
-
-
Springer, London
-
Pahl, G., Beitz, W., Wallace, K., Blessing, L. and Bauert, F., 1996. "Engineering design: a systematic approach", Springer, London
-
(1996)
Engineering Design: A Systematic Approach
-
-
Pahl, G.1
Beitz, W.2
Wallace, K.3
Blessing, L.4
Bauert, F.5
|