-
1
-
-
0037408566
-
An effective simulation mechanism for construction operations
-
Cheng T.M., and Feng C.W. An effective simulation mechanism for construction operations. Automation in Construction 12 (2003) 227-244
-
(2003)
Automation in Construction
, vol.12
, pp. 227-244
-
-
Cheng, T.M.1
Feng, C.W.2
-
2
-
-
85170504020
-
-
Feng, C.W., Wu, H.T., 2000. Using genetic algorithms to optimize the dispatching schedule of RMC cars. In: Proceedings of The Seventeenth International Symposium on Automation and Robotics in Construction, Taipei, Taiwan, pp. 927-932.
-
-
-
-
3
-
-
1642618589
-
Optimizing the schedule of dispatching RMC trucks through genetic algorithms
-
Feng C.W., Cheng T.M., and Wu H.T. Optimizing the schedule of dispatching RMC trucks through genetic algorithms. Automation in Construction 13 (2004) 327-340
-
(2004)
Automation in Construction
, vol.13
, pp. 327-340
-
-
Feng, C.W.1
Cheng, T.M.2
Wu, H.T.3
-
5
-
-
6344237930
-
HKCONSIM: a practical simulation solution to planning concrete plant operations in Hong Kong
-
Lu M., Anson M., Tang S.L., and Ying Y.C. HKCONSIM: a practical simulation solution to planning concrete plant operations in Hong Kong. Journal of Construction Engineering and Management 129 5 (2003) 547-554
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.5
, pp. 547-554
-
-
Lu, M.1
Anson, M.2
Tang, S.L.3
Ying, Y.C.4
-
6
-
-
0141866722
-
Towards a decision support system for the ready concrete distribution system: a case of a Greek company
-
Matsatsinis N.F. Towards a decision support system for the ready concrete distribution system: a case of a Greek company. European Journal of Operational Research 152 2 (2004) 487-499
-
(2004)
European Journal of Operational Research
, vol.152
, Issue.2
, pp. 487-499
-
-
Matsatsinis, N.F.1
-
7
-
-
85170496811
-
-
Naso, D., Surico, M., Turchiano, B., Kaymak, U., 2004. Genetic algorithms in supply chain scheduling of ready mixed concrete, ERIM report series research in management, ERS-2004-096-LIS, Erasmus Research Institute of Management.
-
-
-
-
8
-
-
17044385067
-
Scheduling the truckmixer arrival for a ready mixed concrete pour via simulation with Risk
-
Wang S.Q., Teo C.L., and Ofori G. Scheduling the truckmixer arrival for a ready mixed concrete pour via simulation with Risk. Journal of Construction Research 2 2 (2001) 169-179
-
(2001)
Journal of Construction Research
, vol.2
, Issue.2
, pp. 169-179
-
-
Wang, S.Q.1
Teo, C.L.2
Ofori, G.3
-
9
-
-
0036722286
-
A passenger demand based model for airline flight scheduling and fleet routing
-
Yan S., and Tseng C.H. A passenger demand based model for airline flight scheduling and fleet routing. Computers and Operations Research 29 (2002) 1559-1581
-
(2002)
Computers and Operations Research
, vol.29
, pp. 1559-1581
-
-
Yan, S.1
Tseng, C.H.2
-
10
-
-
0030244759
-
A decision support framework for multi-fleet routing and multi-stop flight scheduling
-
Yan S., and Young H.F. A decision support framework for multi-fleet routing and multi-stop flight scheduling. Transportation Research 30A (1996) 379-398
-
(1996)
Transportation Research
, vol.30 A
, pp. 379-398
-
-
Yan, S.1
Young, H.F.2
-
11
-
-
24744461920
-
A short-term flight scheduling model for international express package delivery
-
Yan S., Lai C.H., and Chen C.H. A short-term flight scheduling model for international express package delivery. Journal of Air Transport Management 11 6 (2005) 368-374
-
(2005)
Journal of Air Transport Management
, vol.11
, Issue.6
, pp. 368-374
-
-
Yan, S.1
Lai, C.H.2
Chen, C.H.3
|