메뉴 건너뛰기




Volumn 10, Issue 4-5, 2007, Pages 293-301

Single-machine scheduling to stochastically minimize maximum lateness

Author keywords

Deterministic or stochastic processing times; Maximum weighted lateness; Random due dates; Stochastic order; Stochastic scheduling

Indexed keywords

MAXIMUM WEIGHTED LATENESS; RANDOM DUE DATES; STOCHASTIC ORDERS; STOCHASTIC PROCESSING TIMES;

EID: 34848908344     PISSN: 10946136     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10951-007-0026-8     Document Type: Article
Times cited : (18)

References (11)
  • 1
    • 0022761988 scopus 로고
    • Minimizing the expected weighted number of tardy jobs in stochastic flow shops
    • Boxma, O. J., & Forst, F. G. (1986). Minimizing the expected weighted number of tardy jobs in stochastic flow shops. Operations Research Letters, 5, 119-126.
    • (1986) Operations Research Letters , vol.5 , pp. 119-126
    • Boxma, O.J.1    Forst, F.G.2
  • 2
    • 33845492210 scopus 로고
    • Optimal issuing policies under stochastic field lives
    • Brown, M., & Solomon, H. (1973). Optimal issuing policies under stochastic field lives. Journal of Applied Probability, 10, 761-768.
    • (1973) Journal of Applied Probability , vol.10 , pp. 761-768
    • Brown, M.1    Solomon, H.2
  • 3
    • 17444370128 scopus 로고    scopus 로고
    • Single-machine scheduling with exponential processing times and general stochastic cost functions
    • Cai, X., & Zhou, X. (2005). Single-machine scheduling with exponential processing times and general stochastic cost functions. Journal of Global Optimization, 31, 317-332.
    • (2005) Journal of Global Optimization , vol.31 , pp. 317-332
    • Cai, X.1    Zhou, X.2
  • 4
    • 0000797681 scopus 로고
    • Rearrangement, majorization and stochastic scheduling
    • Chang, C. S., & Yao, D. D. (1993). Rearrangement, majorization and stochastic scheduling. Mathematics of Operations Research, 18, 658-684.
    • (1993) Mathematics of Operations Research , vol.18 , pp. 658-684
    • Chang, C.S.1    Yao, D.D.2
  • 5
    • 0003666178 scopus 로고
    • Scheduling a production line to minimize maximum tardiness
    • Research Report 43
    • Jackson, J. R. (1955). Scheduling a production line to minimize maximum tardiness. In Management Science research project, UCLA (Research Report 43).
    • (1955) Management Science Research Project, UCLA
    • Jackson, J.R.1
  • 8
    • 0026123423 scopus 로고
    • Sequencing jobs on a single machine with a common due date and stochastic processing times
    • Sarin, S. C., Erel, E., & Steiner, G. (1991). Sequencing jobs on a single machine with a common due date and stochastic processing times. European Journal of Operational Research, 51, 287-302.
    • (1991) European Journal of Operational Research , vol.51 , pp. 287-302
    • Sarin, S.C.1    Erel, E.2    Steiner, G.3
  • 10
    • 0000492685 scopus 로고
    • Bivariate characterization of some stochastic order relations
    • Shanthikumar, J. G., & Yao, D. D. (1991). Bivariate characterization of some stochastic order relations. Advances in Applied Probability, 23, 642-659.
    • (1991) Advances in Applied Probability , vol.23 , pp. 642-659
    • Shanthikumar, J.G.1    Yao, D.D.2
  • 11
    • 0031214284 scopus 로고    scopus 로고
    • General stochastic single-machine scheduling with regular cost functions
    • Zhou, X., & Cai, X. (1997). General stochastic single-machine scheduling with regular cost functions. Mathematical and Computer Modelling, 26, 95-108.
    • (1997) Mathematical and Computer Modelling , vol.26 , pp. 95-108
    • Zhou, X.1    Cai, X.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.