메뉴 건너뛰기




Volumn 18, Issue 3, 2007, Pages 325-342

Multiple shift scheduling of hierarchical workforce with multiple work centers

Author keywords

Employee scheduling; Hierarchical workforce; Manpower scheduling; Mixed integer programming; Scheduling algorithm

Indexed keywords


EID: 34848827076     PISSN: 08684952     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (17)

References (18)
  • 1
    • 4043157192 scopus 로고    scopus 로고
    • Survey, categorization, and comparison of recent tour scheduling literature
    • Alfares, H. (2004). Survey, categorization, and comparison of recent tour scheduling literature. Annals of Operations Research, 127, 145-175.
    • (2004) Annals of Operations Research , vol.127 , pp. 145-175
    • Alfares, H.1
  • 2
    • 34548226547 scopus 로고    scopus 로고
    • Mixed-integer programming models for an employee scheduling problem with multiple shifts and work locations
    • accepted
    • Al-Yakoob, S.M., and H.D. Sherali (2007a). Mixed-integer programming models for an employee scheduling problem with multiple shifts and work locations. Annals of Operation Research (accepted).
    • (2007) Annals of Operation Research
    • Al-Yakoob, S.M.1    Sherali, H.D.2
  • 4
    • 0017547182 scopus 로고
    • Workforce scheduling with cyclic demands and day off constraints
    • Baker, K., and M. Magazine (1977). Workforce scheduling with cyclic demands and day off constraints. Management Science, 24, 161-167.
    • (1977) Management Science , vol.24 , pp. 161-167
    • Baker, K.1    Magazine, M.2
  • 5
    • 0018674639 scopus 로고
    • Staff scheduling with day-off and workstretch constraints
    • Baker, K., R. Burns and M. Carter (1979). Staff scheduling with day-off and workstretch constraints. AIIE Transactions, 6(11), 286-292.
    • (1979) AIIE Transactions , vol.6 , Issue.11 , pp. 286-292
    • Baker, K.1    Burns, R.2    Carter, M.3
  • 6
    • 0016872537 scopus 로고
    • Scheduling of work forces required in continuous operations under alternative labor policies
    • Brownell, W., and J. Lowerre (1976). Scheduling of work forces required in continuous operations under alternative labor policies. Management Science, 22, 297-305.
    • (1976) Management Science , vol.22 , pp. 297-305
    • Brownell, W.1    Lowerre, J.2
  • 7
    • 0000482113 scopus 로고
    • Manpower scheduling with variable demands and alternate weekends off
    • Burns, R. (1978). Manpower scheduling with variable demands and alternate weekends off. Information, 16, 101-111.
    • (1978) Information , vol.16 , pp. 101-111
    • Burns, R.1
  • 8
    • 0042861093 scopus 로고
    • Manuscript, School of Business, Queen's University, Kingston, Ontario, Canada
    • Burns, R. (1981). An iterative approach to multiple shift scheduling. Manuscript, School of Business, Queen's University, Kingston, Ontario, Canada.
    • (1981) An iterative approach to multiple shift scheduling
    • Burns, R.1
  • 9
    • 0022060907 scopus 로고
    • Work force size and schedules with variable demands
    • Burns, R., and M. Carter (1985). Work force size and schedules with variable demands. Management Science, 31, 599-607.
    • (1985) Management Science , vol.31 , pp. 599-607
    • Burns, R.1    Carter, M.2
  • 10
    • 0023171522 scopus 로고
    • A modular approach to optimal multiple-shift manpower scheduling
    • Burns, R., and G. Koop (1987). A modular approach to optimal multiple-shift manpower scheduling. Operations Researches, 100-110.
    • (1987) Operations Researches , pp. 100-110
    • Burns, R.1    Koop, G.2
  • 11
    • 0022026652 scopus 로고
    • Workforce scheduling with cyclic requirements and constraints on days, off weekends, and workstretch
    • Emmons, H. (1985). Workforce scheduling with cyclic requirements and constraints on days, off weekends, and workstretch. IIE Transactions, 17, 8-16.
    • (1985) IIE Transactions , vol.17 , pp. 8-16
    • Emmons, H.1
  • 12
    • 0026163585 scopus 로고
    • Off-day scheduling with hierarchical worker categories
    • Emmons, H., and R. Burns (1991). Off-day scheduling with hierarchical worker categories. Operations Research, 39, 484-495.
    • (1991) Operations Research , vol.39 , pp. 484-495
    • Emmons, H.1    Burns, R.2
  • 15
    • 0017495691 scopus 로고
    • Workstretch properties for the scheduling of continuous operations under alternative labor polices
    • Lowerre, J. (1977). Workstretch properties for the scheduling of continuous operations under alternative labor polices. Management Science, 23, 963-971.
    • (1977) Management Science , vol.23 , pp. 963-971
    • Lowerre, J.1
  • 16
    • 0030836092 scopus 로고    scopus 로고
    • An algorithm for single shift scheduling of hierarchical workforce
    • Narasimhan, R. (1996). An algorithm for single shift scheduling of hierarchical workforce. European Journal, of Operational Research, 96, 113-121.
    • (1996) European Journal, of Operational Research , vol.96 , pp. 113-121
    • Narasimhan, R.1
  • 17
    • 0035494147 scopus 로고    scopus 로고
    • Improving discrete model reorientations via symmetry considerations
    • Sherali, H.D., and J.C. Smith (2002). Improving discrete model reorientations via symmetry considerations. Management Science, 47(10), 1396-1407.
    • (2002) Management Science , vol.47 , Issue.10 , pp. 1396-1407
    • Sherali, H.D.1    Smith, J.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.